Engineering Economy, Student Value Edition (17th Edition)
17th Edition
ISBN: 9780134838137
Author: William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
Publisher: PEARSON
expand_more
expand_more
format_list_bulleted
Question
Chapter 3, Problem 3P
To determine
Calculate the cost.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
An architect-engineering firm is planning a parking lot to accommodate 500 vehicles. Each parking space will be 8.5 feet × 15 feet. It has been estimated that the space required for aisles will be 80% of the space required for parking. A local paving company charges $10 per square foot for paving and a flat fee of $12,000 for marking and painting the individual parking spaces. Based on this information, what is the estimated cost of paving and marking this parking lot?
An architect-engineering firm is planning a parking lot to accomodate 400 vehicles. Each parking space will be 8.5 feet x 15 feet. It has been estimated that the space required for aisles will be 70 percentage of the space required for parking. A local paving company charges 8$ per square foot for paving and a flat fee of $10,600 for marking and painting the individual parking spaces. Based on this information, what is the estimated cost of paving and marking this parking lot?
The estimated cost of paving and marking the parking lot is: $ ?
Mirtha owns an online jewelry store that specializes in earrings. In March, she sells 50 pairs of earrings priced at $15. The cost of materials to create the 50 pairs of earrings was $100. The website she uses to sell her wares costs her $10 a month, and she is also charged 4% on each sale by the company that processes debit/credit card purchases.
Which of the following best represents Mirth’s total cost?
Group of answer choices
A)The $750 Mirtha earned from earring sales minus the materials ($100), online website charge ($10), and payment processing charge (4%)
B)The sum of the materials ($100), website charge ($10), and 4% payment processing charge (4%)
C)The cost of all the materials used to create the earrings, $100
D)The costs of materials minus the costs it takes to run her business through the online store, in this case the $10 website charges and the 4% payment processing charge
Chapter 3 Solutions
Engineering Economy, Student Value Edition (17th Edition)
Ch. 3 - A green (environmentally friendly) office building...Ch. 3 - You are planning to build a new home with...Ch. 3 - Prob. 3PCh. 3 - Prob. 4PCh. 3 - Prob. 5PCh. 3 - Prob. 6PCh. 3 - Prob. 7PCh. 3 - Prepare a composite (weighted) index for housing...Ch. 3 - Prepare a composite (weighted) index for housing...Ch. 3 - Prob. 10P
Ch. 3 - Prob. 11PCh. 3 - Prob. 12PCh. 3 - Prob. 13PCh. 3 - The capital investment cost for a...Ch. 3 - The capacity of a switch grass-fueled ethanol...Ch. 3 - Prob. 16PCh. 3 - The time to assemble the first unit on a...Ch. 3 - Prob. 18PCh. 3 - For the data below (3.4 .3) a. Find the regression...Ch. 3 - A company that manufactures shuttle cars and mines...Ch. 3 - Prob. 21PCh. 3 - Prob. 22PCh. 3 - Prob. 23PCh. 3 - Prob. 24PCh. 3 - Prob. 25PCh. 3 - Prob. 26PCh. 3 - Prob. 28SECh. 3 - Prob. 31CSCh. 3 - Prob. 32CSCh. 3 - Prob. 36FECh. 3 - Prob. 37FECh. 3 - Prob. 38FECh. 3 - Prob. 39FECh. 3 - Prob. 40FECh. 3 - Prob. 41FE
Knowledge Booster
Similar questions
- Antoine rents rooms in his hotel for an average of $100 per night. The variable cost per rented room is $20, to cover maid service and utilities. His fixed costs are $100,000 and his profit last year was $20,000. For Antoine, the contribution per unit is $100 $80 $1005 $800arrow_forwardA New York renewable energy company pays $0.18 per kilowatthour (kWh) for the first 10,000 units of electricity each month and $0.15/kWh for all remaining units. If a firm uses 25,000 kWh/month, what is its average and marginal cost?arrow_forwardA 130,000-square-foot building is to be constructed on a university campus. You just received two sets of estimates: physical area and furnishings percentages, and the per unit cost factors, as shown below. Estimate the cost of the building and its furnishings. Type of Usage Classrooms Laboratories Offices Area, % of 130,000 27 37 36 Cost per ft², $ 128 188 113 153 28 Furnishings-labs Furnishings-all others The estimated cost of the building and its furnishings is $ 22 78arrow_forward
- Carlota Music Company estimates that the marginal cost of manufacturing its Professional Series guitars is C ′ (x) = 0.02x + 100 dollars/month when the level of production is x guitars/month. The fixed costs incurred by Carlota are $4000/month. Find the total monthly cost incurred by Carlota in manufacturing x guitars/month.arrow_forwardA manufacturing company produces solar panels. The variable costs are $20 per unit and fixed costs are $10,875. The price demand relationship for this product is P=-0.25Q+ 250, where P is the unit sales price of the product and Q is the demand of solar panels. Given the following: • Total cost = Fixed cost + Variable cost • Revenue = Demand x Price • Profit = Revenue - Total cost 26. The equation that represent the total cost is: a. ($10,875+$20) Q b. $10,875-$20 Q c. $10,875 × $20 Q d. $10,875+$20 Q 27. The equation that represent the total revenue is: a. $0.25Q²+$250Q b. - $0.25Q²+$250Q c. - $0.25Q²-$250Q d. $0.25Q²-$250Qarrow_forwardThe Barnes Center started selling first-aid kits for students in the pharmacy! When 300 first-aid kits are produced, the average cost is $10 and the marginal cost is $15. Estimate the cost of producing 301 first-aid kits.arrow_forward
- Sally Statistics is implementing a system of statistical process control (SPC) charts in her factory in an effort to reduce the overall cost of scrapped product. The current cost of scrap is $X per month. If a 75% learning curve is expected in the use of the SPC charts to reduce the cost of scrap, what would the percentage reduction in monthly scrap cost be after the charts have been used for 6 months? (Hint: Model each month as a unit of production.)arrow_forward= 2. The cost of operating a jet-powered commercial (passenger- carrying) airplane varies as the three-halves (3/2) power of its velocity; specifically, Co kny3/2, where n is the trip length in miles, k is a constant of proportionality, and vis velocity in miles per hour. It is known that at 400 miles per hour, the average cost of operation is $300 per mile. The company that owns the aircraft wants to minimize the cost of operation, but that cost must be balanced against the cost of the passengers' time (CC), which has been set at $300,000 per hour. At what velocity should the trip be planned to minimize the total cost, which is the sum of the cost of operating the airplane and the cost of passengers' time?arrow_forwardYour boss is the director of reporting for the Athens County Construction Agency (ACCA). It has been his job to track the cost of construction in Athens County. Twentyfive years ago, he created the ACCA Cost Index to track those costs. Costs during the first year of the index were $14 per square foot of constructed space (the index value was set at 100 for that first year). This year a survey of contractors revealed that costs were $70 per square foot. (a) What index number will your boss publish in his report for this year? (b) If the index value was 500 last year, what was the cost per square foot last year?arrow_forward
- only d,e,f pleasearrow_forwardIn connection with surfacing a new highway, a contractor has a choice of two sites on which to set up the asphalt-mixing plant equipment. The contractor estimates that it will cost $1.25 per cubic yard mile (yd3 –mile) to haul the asphalt-paving material from the mixing plant to the job location. Factors relating to the two mixing sites are as follows: (See pic) The job requires 50,000 cubic yards of mixed-asphalt-paving material. It is estimated that four months (17 weeks of five working days per week) will be required for the job. Compare the two sites in terms of their total costs. Assume that the cost of the return trip is negligible. A) Which is the better site? B) For the selected site, how many cubic yards of paving material does the contractor have to deliver before staring to make a profit if paid $8.35 per cubic yard delivered to the job location?arrow_forwardI need help understanding how to solve thisarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Managerial Economics: Applications, Strategies an...EconomicsISBN:9781305506381Author:James R. McGuigan, R. Charles Moyer, Frederick H.deB. HarrisPublisher:Cengage LearningManagerial Economics: A Problem Solving ApproachEconomicsISBN:9781337106665Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike ShorPublisher:Cengage Learning
Managerial Economics: Applications, Strategies an...
Economics
ISBN:9781305506381
Author:James R. McGuigan, R. Charles Moyer, Frederick H.deB. Harris
Publisher:Cengage Learning
Managerial Economics: A Problem Solving Approach
Economics
ISBN:9781337106665
Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike Shor
Publisher:Cengage Learning