Question
Chapter 3, Problem 13P
(a):
To determine
Calculate the estimated cost.
(b):
To determine
Calculate the new estimated cost.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Six years ago, an 80-kW diesel electric set cost $160,000. The cost index for this class of equipment six years ago was 187 and is now 194. The cost capacity factor is 0.6. Solve, a. The plant engineering staff is considering a 120-kW unit of the same general design to power a small isolated plant. Assume we want to add a precompressor, which (when isolated and estimated separately) currently costs $18,000. Determine the total cost of the 120-kW unit. b. Estimate the cost of a 40-kW unit of the same general design. Include the cost of the $18,000 precompressor.
Ab6
Solve the attachment
Chapter 3 Solutions
Engineering Economy, Student Value Edition (17th Edition)
Ch. 3 - A green (environmentally friendly) office building...Ch. 3 - You are planning to build a new home with...Ch. 3 - Prob. 3PCh. 3 - Prob. 4PCh. 3 - Prob. 5PCh. 3 - Prob. 6PCh. 3 - Prob. 7PCh. 3 - Prepare a composite (weighted) index for housing...Ch. 3 - Prepare a composite (weighted) index for housing...Ch. 3 - Prob. 10P
Ch. 3 - Prob. 11PCh. 3 - Prob. 12PCh. 3 - Prob. 13PCh. 3 - The capital investment cost for a...Ch. 3 - The capacity of a switch grass-fueled ethanol...Ch. 3 - Prob. 16PCh. 3 - The time to assemble the first unit on a...Ch. 3 - Prob. 18PCh. 3 - For the data below (3.4 .3) a. Find the regression...Ch. 3 - A company that manufactures shuttle cars and mines...Ch. 3 - Prob. 21PCh. 3 - Prob. 22PCh. 3 - Prob. 23PCh. 3 - Prob. 24PCh. 3 - Prob. 25PCh. 3 - Prob. 26PCh. 3 - Prob. 28SECh. 3 - Prob. 31CSCh. 3 - Prob. 32CSCh. 3 - Prob. 36FECh. 3 - Prob. 37FECh. 3 - Prob. 38FECh. 3 - Prob. 39FECh. 3 - Prob. 40FECh. 3 - Prob. 41FE
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, economics and related others by exploring similar questions and additional content below.Similar questions
- Problem 2 Six years ago, an 80-kW diesel-electric set cost $160,000. The cost index for this class of equipment six years ago was 187 and is now 194. The plant engineering staff was considering a 120-kW unit of the same general design to power a small isolated plant that would have cost $211,707. Based on the information above the plant engineering staff is considering a 100 kW unit of the same general design to power a small isolated plant. Assume we want to add a pre-compressor, which (when isolated and estimated separately) currently costs $13,000. Determine the total cost of the 100-kW unit. ■ a profit is desired? a THE UNIVERSITY OF JORDAN myhp Iarrow_forwardSix years ago, an 80-kW diesel electric set cost $150,000. The cost index for this class of equipment six years ago was 181 and is now 194.The cost-capacity factor is 0.5. a. The plant engineering staff is considering a 120-kW unit of the same general design to power a small isolated plant. Assume we want to add a precompressor, which (when isolated and estimated separately) currently costs $17,500. Determine the total cost of the 120-kW unit. b. Estimate the cost of a 50-kW unit of the same general design. Include the cost of the $17,500 precompressor.arrow_forwardFive years ago, when the relevant cost index was 135, a nuclear centrifuge cost $32,000. The centrifuge had a capacity of separating 1250 gallons of ionized solution per hour. Today, it is desired to build a centrifuge with capacity of 3500 gallons per hour, but the cost index now is 270. Assuming a power-sizing exponent to reflect economies of scale, x, of 0.72, use the power-sizing model to determine the approximate cost (expressed in today’s dollars) of the new reactor.arrow_forward
- Homeowner Henry is building a fireplace for his house. The fireplace will require 2500 bricks. (a) If the cost of a Chimney Brick in 2007 was $2.10, calculate the material cost of Henry’s project in 2020. The Chimney Brick Index (CBI) was 442 in 2007 and is expected to be 651 in 2020. (b) Estimate the material cost of a similar fireplace to be built in the year 2023. What assumption did you make?arrow_forwardSally Statistics is implementing a system of statistical process control (SPC) charts in her factory in an effort to reduce the overall cost of scrapped product. The current cost of scrap is $X per month. If a 75% learning curve is expected in the use of the SPC charts to reduce the cost of scrap, what would the percentage reduction in monthly scrap cost be after the charts have been used for 6 months? (Hint: Model each month as a unit of production.)arrow_forwardEight years ago when the relative cost index was 60, a 10 MW power generation facility cost $5M to build. Today the cost index is 110. What would the cost be to produce a 25MW facility today if the power sizing factor is 0.6?arrow_forward
- TTV Corporation's managers estimate that a 50% increase in price would cause an 80% reduction in the quantity of product sold. Total fixed costs for the product are $5,000 and total variable costs are $4,000, based on production of 400 units. The following values may be useful: In (0.2) In (0.5) = -0.693 In (0.8) = -0.223 In (1.5) = 0.405 In (4,000) = 8.294 In (5,000) = 8.517 = -1.609 %3D TTV's profit maximizing price is: $2.44 O $3.37 $7.57 $13.36arrow_forwardThe purchase price of a natural gas-firedcommercial boiler (capacity X) was $181,000 eight years ago. Another boiler of the same basic design, except with capacity 1.42X, is currently being considered for purchase. If it is purchased, some optional features presently costing $28,000 would be added for your application. If the cost index was 162 for this type of equipment when the capacity X boiler was purchased and is 221 now, and the applicable cost capacity factor is 0.8, what is your estimate of the purchase price for the new boilerarrow_forwardA company sells one of the items in its product line for $8.90 each. The variable costs per unit is $3.90, and the associated fixed costs per week are $2,200. If the total revenue is $9,434 per week, then determine each of the following quantities: (1) The weekly level of output (n), that is the number of items produced and sold, is units. (2) The total variable costs (TVC) per week is $ (3) The net income (NI) per week is $ (4) The break-even volume (nBE) per week is even volume is not an integer, round up to the next integer.) units. (Hint: If the break- (5) The break-even revenue (TRBE) per week, rounded to the nearest cent, is $arrow_forward
- A manufacturing company needs to know whether to produce components for a Bird Feeder in-house or buy the components from a fabricator. To make the components in-house, the company needs to buy an injection molding machine, which costs $9,000. The company expects to produce 10,000 units per year. The following estimates have been made: Fixed cost per year Variable cost per part Make $9,000 $6.45 Buy. $0 $7.20 a. What is the break-even point? b. If the number of units produced is 10,000, which option is cheaper: Make or Buy? Explain why. b. If the number of units produced is increased to 12,500, which option is cheaper: Make or Buy? Explain why.arrow_forwardA manufacturing company produces solar panels. The variable costs are $20 per unit and fixed costs are $10,875. The price demand relationship for this product is P=-0.25Q+ 250, where P is the unit sales price of the product and Q is the demand of solar panels. Given the following: • Total cost = Fixed cost + Variable cost • Revenue = Demand x Price • Profit = Revenue - Total cost 26. The equation that represent the total cost is: a. ($10,875+$20) Q b. $10,875-$20 Q c. $10,875 × $20 Q d. $10,875+$20 Q 27. The equation that represent the total revenue is: a. $0.25Q²+$250Q b. - $0.25Q²+$250Q c. - $0.25Q²-$250Q d. $0.25Q²-$250Qarrow_forward“Acme Boards” makes and sells skateboards for $240.00. The costs associated with the business include variable costs of $180 per board and fixed costs of $300,000. Determine: The number of skateboards required to sell to breakeven. The profit if they have been selling about 8,000 pr year. a) Now, they are considering undertaking an advertising program with GBC Promotions that would cost $150,000 (additional fixed cost) and increasing the price by $160 to $400. Find the number of skateboards required to sell at $400 and make the same amount of profit as in part “b”. b) What is the % sales decline that can occur in c, to make the same profit as before?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Managerial Economics: Applications, Strategies an...EconomicsISBN:9781305506381Author:James R. McGuigan, R. Charles Moyer, Frederick H.deB. HarrisPublisher:Cengage LearningManagerial Economics: A Problem Solving ApproachEconomicsISBN:9781337106665Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike ShorPublisher:Cengage Learning
Managerial Economics: Applications, Strategies an...
Economics
ISBN:9781305506381
Author:James R. McGuigan, R. Charles Moyer, Frederick H.deB. Harris
Publisher:Cengage Learning
Managerial Economics: A Problem Solving Approach
Economics
ISBN:9781337106665
Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike Shor
Publisher:Cengage Learning