Concept explainers
Ethical Dilemma
Two examples of massively mismanaged projects are TAURUS and the “Big Dig.” The first, formally called the London Stock Exchange Automation Project, cost $575 million before it was finally abandoned. Although most IT projects have a reputation for cost overruns, delays, and underperformance. TAURUS set a new standard.
But even TAURUS paled next to the biggest most expensive public works project in U.S. history—Boston’s 15-year-long Central Artery/Tunnel Project. Called the Big Dig, this was perhaps the poorest and most felonious case of project mismanagement in decades. From a starting $2 billion budget to a final price tag of $15 billion, the Big Dig cost more than the Panama Canal, Hoover Dam, or Interstate 95, the 1,919-mile highway between Maine and Florida.
Read about one of these two projects (or another of your choice) and explain why it faced such problems. How and why do project managers allow such massive endeavors to fall into such a state? What do you think are the causes?
Introduction: Projects are enormously done in all companies and in recent time high emphasis have been given to project management because of its cost effectiveness when being properly executed and its expensive nature when proper planning and execution is not done. Such unplanned and improperly executed projects which cost $575 million before it was dropped out is project TS. TS is one of project with poor planning, execution with delays which made cost overruns.
Another project which was more unsuccessful than TS was project BD. The poorest and most felonious case of project mismanagement started from $2 billion budget to $15 billion.
To determine: The reason why the project faced such problems and why did the project managers allowed such problem to happen and its causes.
Explanation of Solution
Reason why the project faced such problems and why did the project managers allowed such problem to happen and its causes:
Project: TS
What is Project TS:
Project TS is an effort to move the manual paper based trading system to a computerized system. In 1980’s when share trading had been much popular and was rapidly growing, there was an attempt to convert all the manual paper based works to computerized system.
Reason for failure of project TS:
Project TS failed mainly due to two reasons. The first is creation of central database which would act as a hub and execution of the transactions. This demanded entire modification in the process of trading and it also resulted in the loss of registration business which the professionals highly opposed.
Another reason is the failure by design committee and lack of proper governance by the project managers and poor strategic decision making and failure to convince the stakeholders.
Want to see more full solutions like this?
Chapter 3 Solutions
Principles Of Operations Management
- Please I need the answer in 15 minutesarrow_forwardRecommendations for North East Link project in Victoria. Recommendations on how to solve budget blowout. Please include references.arrow_forward2.1: For each of the following projects, determine the shape of its life cycle (S or J): SOLUTION (Answer just near the name of the project) • Building a nuclear station for electrical power generation– • Achieving an ILETS minimum score – • Organizing a wedding party – • Getting a masters degree in engineering management –arrow_forward
- please write about 500 work about this question Q4: Does the United Nationsneed reform? If you were given the task of restructuring the organization, what kind of organization would you design? Explain with the reasons.arrow_forwardWhat is the minimum cost of crashing the following project at Sawaya Robotics by 4 days? ACTIVITY Design (A) Wiring (B) Chip install (C) Software (D) Testing (E) NORMAL CRASH TIME (DAYS) TIME (DAYS) 8 7 7 6 6 6 9 6 NORMAL COST 400 1,100 700 900 1,200 CRASH COST 550 1,300 800 1,250 1,950 IMMEDIATE PREDECESSOR(S) The minimum cost of crashing the following project at Sawaya Robotics by 4 days is $ whole number). A, B C (enter your response as aarrow_forwardNow as per the project brief: Need the below help Feasibility/Risk Assessment: • Calculate individual scores for TELOS feasibility factors. Calculate an overall score. Important: providejustification/explanation for the scores, including the overall score. For example, if you assign theTechnical feasibility a score of 9, then please explain why.• Technical–Is it likely that our staff can build it?• Economic–Is the projected return worth the investment?• Legal–Will doing this project violate laws or contractual agreements?• Operational–If built, is it likely that the system will really address or solve the business problem?• Schedule–Is it likely to be built in time to realize benefits and/or meet constraints?arrow_forward
- Project name: 3D printing shop. Please solve the second part ( 2. Technical and Management Feasibility )arrow_forward5. Your firm has acquired the contract of developing a housing society that covers in 1000 Acres of land. As manager, what strategy should be taken for having single or multiple suppliers. Would it be more beneficial to have multiple suppliers for the construction material or vice versa. Support your answer with the help of appropriate justification and relevant example List down different phaces of project life cycle VWhat are the different deliverables found in each phase of the project life ode (Oply list)arrow_forwardFIll out the chartsarrow_forward
- Activity 1 (Assessment Phase) Discuss the major operational threats DHL logistical functions face as a result of global terrorism Activity 2 (Improvement Phase) What might the organization do better, to mitigate the terrorist threats to its logistics operations? Armed forces personnel who cannot address these questions owing to security concerns should examine a larger question What logistical threats does the nation face, and how can these risks be reduced?arrow_forwardThe failure of the baggage system at Denver International Airport may have been the result of sloppy software project management. Using an example to explain the steps involved in project management would be useful, but is it even possible? How, exactly, can a system get praise from scientists yet sink a company's finances?arrow_forwardGiven the data table below develop the precedence network and perform the CPM calculations. Then, using the proposed crashing strategy calculate the normal, least-cost, and crash duration for the project below. Calculate the cost associated with each duration. Indirect cost (overhead) is $120 per day. Activity IPA A B E F G H | J A A,B B C,D F E,G H,I Duration Cost $ Normal Crash Normal Crash 5 4 2 4 7 4 6 8 A 3 3 4 5 3 4 3 2 $770 $900 $660 $700 $800 $1,070 $1,000 $1,110 $800 $920 $560 $630 $700 $810 $1,000 $1,260 $500 $580 $400 $600arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.