Concept explainers
Each type of cost for all three jobs.

Answer to Problem 21A
Date
Rework percentage is
Scrap percentage is
Date
Rework percentage is
Scrap percentage is
Date
Rework percentage is
Scrap percentage is
Explanation of Solution
Given information:
Below table shows the total pieces manufactured along with rework and scrap defective pieces.
Calculation:
We have been given a table with details of total pieces manufactured along with defective pieces.
Now we need to find the individual defect percentage for each day. Total pieces manufactured will be base and number of defective pieces will be percentage.
As we know the proportion to find percentage is given as
Date
Rework piece
Putting these value in standard proportion,
Hence, the rework percentage is
Similarly, scrap piece
Putting these value in standard proportion,
Hence, the scrap percentage is
Date
Rework piece
Putting these value in standard proportion,
Hence, the rework percentage is
Similarly, scrap piece
Putting these value in standard proportion,
Hence, the scrap percentage is
Date
Rework piece
Putting these value in standard proportion,
Hence, the rework percentage is
Similarly, scrap piece
Putting these value in standard proportion,
Hence, the scrap percentage is
Thus,
Date
Rework percentage is
Scrap percentage is
Date
Rework percentage is
Scrap percentage is
Date
Rework percentage is
Scrap percentage is
Want to see more full solutions like this?
Chapter 24 Solutions
EBK MATHEMATICS FOR MACHINE TECHNOLOGY
- 3) Recall that the power set of a set A is the set of all subsets of A: PA = {S: SC A}. Prove the following proposition. АСВ РАСРВarrow_forwardA sequence X = (xn) is said to be a contractive sequence if there is a constant 0 < C < 1 so that for all n = N. - |Xn+1 − xn| ≤ C|Xn — Xn−1| -arrow_forward3) Find the surface area of z -1≤ y ≤1 = 1 + x + y + x2 over the rectangle −2 ≤ x ≤ 1 and - Solution: TYPE YOUR SOLUTION HERE! ALSO: Generate a plot of the surface in Mathematica and include that plot in your solution!arrow_forward
- 7. Walkabout. Does this graph have an Euler circuit? If so, find one. If not, explain why not.arrow_forwardBelow, let A, B, and C be sets. 1) Prove (AUB) nC = (ANC) U (BNC).arrow_forwardA sequence X = (xn) is said to be a contractive sequence if there is a constant 0 < C < 1 so that for all n = N. - |Xn+1 − xn| ≤ C|Xn — Xn−1| -arrow_forward
- 1) Suppose continuous random variable X has sample space S = [1, ∞) and a pdf of the form f(x) = Ce-(2-1)/2. What is the expected value of X?arrow_forwardA sequence X = (xn) is said to be a contractive sequence if there is a constant 0 < C < 1 so that for all n = N. - |Xn+1 − xn| ≤ C|Xn — Xn−1| -arrow_forward2) Find the general solution to the differential equation d²x dt² 2 dax = dtarrow_forward
- 2) Prove (AB) UC = (AUC)n (BUC).arrow_forwardBlue Ridge Hot Tubs manufactures and sells two models of hot tubs: the Aqua-Spa and the Hydro-Lux. Howie Jones, the owner and manager of the company, needs to decide how many of each type of hot tub to produce during his next production cycle. Howie buys prefabricated fiberglass hot tub shells from a local supplier and adds the pump and tubing to the shells to create his hot tubs. (This supplier has the capacity to deliver as many hot tub shells as Howie needs.) Howie installs the same type of pump into both hot tubs. He will have only 200 pumps available during his next production cycle. From a manufacturing standpoint, the main difference between the two models of hot tubs is the amount of tubing and labor required. Each Aqua-Spa requires 9 hours of labor and 12 feet of tubing. Each Hydro-Lux requires 6 hours of labor and 16 feet of tubing. Howie expects to have 1,566 production labor hours and 2,880 feet of tubing available during the next production cycle. Howie earns a profit of…arrow_forwardNo chatgpt pls will upvotearrow_forward
- Holt Mcdougal Larson Pre-algebra: Student Edition...AlgebraISBN:9780547587776Author:HOLT MCDOUGALPublisher:HOLT MCDOUGALMathematics For Machine TechnologyAdvanced MathISBN:9781337798310Author:Peterson, John.Publisher:Cengage Learning,Algebra: Structure And Method, Book 1AlgebraISBN:9780395977224Author:Richard G. Brown, Mary P. Dolciani, Robert H. Sorgenfrey, William L. ColePublisher:McDougal Littell
- Elementary AlgebraAlgebraISBN:9780998625713Author:Lynn Marecek, MaryAnne Anthony-SmithPublisher:OpenStax - Rice University