Traffic And Highway Engineering
Traffic And Highway Engineering
5th Edition
ISBN: 9781337631020
Author: Garber, Nicholas J.
Publisher: Cengage,
bartleby

Videos

Textbook Question
Book Icon
Chapter 20, Problem 1P

Portland cement concrete consists of what four primary elements?

Expert Solution & Answer
Check Mark
To determine

The four primary elements of Portland cement concrete.

Explanation of Solution

The four primary elements of Portland cement concrete are,

  1. Portland Cement
  2. Portland cement is produced by crushing and pulverizing a cautiously prepared mix

    of limestone, marl, and clay and by burning all the mixture at a highest temperature

    (about 2800°F ) to develop a clinker.

  3. Coarse Aggregates
  4. The coarse aggregates are used in Portland cement concrete are materials of inert that are not going to react with cement and normally are comprised of gravel, which is crushed, stone, or blast furnace slag.
  5. Fine Aggregates
  6. Sand is majorly used in the fine aggregate in Portland cement concrete. for this material the specifications usually include requirements of grading, cleanliness and soundness.
  7. Water
  8. The major water requirement stipulated is that the water used also should be capable fordrinking. This water is needed for the quantity of organic matter, acids, oil, and alkalis should not be higher than the allowable amount in drinking water.

Want to see more full solutions like this?

Subscribe now to access step-by-step solutions to millions of textbook problems written by subject matter experts!
Students have asked these similar questions
Question 3 (20 points): The traffic volume on a 2-lane highway is 1600 veh/hr in each direction Page 3 of 6 with a density of 20 veh/mi. A large dump truck enters the traffic stream from an adjacent construction site at 20 mph and carries on this way for 2 miles before turning off to the dump site. Because flow is so high in the opposite direction, no one can pass the truck. As a result, traffic back up behind the truck at four times the density (i.e., 4x20 = 80 veh/mi) at a volume of 1000 veh/hr. How many vehicles get caught in the traffic congestion before the truck exits the highway?
How can construction project managers find a balance between speeding up schedules and the risks of making more mistakes and needing rework, especially when using methods like fast tracking?
Help i keep getting the wrong answer. So I must be doing something wrong.
Knowledge Booster
Background pattern image
Civil Engineering
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning
Text book image
Construction Materials, Methods and Techniques (M...
Civil Engineering
ISBN:9781305086272
Author:William P. Spence, Eva Kultermann
Publisher:Cengage Learning
Text book image
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,
Text book image
Materials Science And Engineering Properties
Civil Engineering
ISBN:9781111988609
Author:Charles Gilmore
Publisher:Cengage Learning
Text book image
Architectural Drafting and Design (MindTap Course...
Civil Engineering
ISBN:9781285165738
Author:Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:Cengage Learning
Text book image
Steel Design (Activate Learning with these NEW ti...
Civil Engineering
ISBN:9781337094740
Author:Segui, William T.
Publisher:Cengage Learning
What is Concrete?; Author: Practical Engineering;https://www.youtube.com/watch?v=UOHURuAf5iY;License: Standard Youtube License