Traffic and Highway Engineering
Traffic and Highway Engineering
5th Edition
ISBN: 9781305156241
Author: Garber, Nicholas J.
Publisher: Cengage Learning
Question
Book Icon
Chapter 2, Problem 4P
To determine

(a)

The expression for travel demand on the bridge related to toll increase and current volume.

Expert Solution
Check Mark

Answer to Problem 4P

The expression for travel demand on the bridge related to toll increase and current volume is V=6000x50(500).

Explanation of Solution

Given:

A toll bridge carries 6000veh/day.

The current toll is $3.50/vehicle.

For each increase in toll of 50 cents, the traffic volume will decrease by 500veh/day.

Concept used:

Write the relation between traffic volume and cost.

  V=V(xx)ΔV ....... (I)

Here, V is the vehicles carried by the bridge, x is the cost increase in cents, x is the increase in cost of toll and ΔV is the increase or decrease in the traffic volume.

Calculations:

Substitute 6000 for V, 50 for x and 500 for ΔV in equation (I).

  V=6000x50(500)

Conclusion:

Therefore, the expression for travel demand on the bridge related to toll increase and current volume is V=6000x50(500).

To determine

(b)

The toll charge to maximize revenue.

Expert Solution
Check Mark

Answer to Problem 4P

The toll charge to maximize the revenue is $4.75.

Explanation of Solution

Write the expression to calculate the total toll charge.

  T=Originalcost+Costincrease ....... (II)

Here, T is the toll.

Write the expression to calculate the revenue generated.

  R=V×T ....... (III)

Here, R is the revenue.

Calculations:

Calculate the total toll charge.

Substitute 350 for Original cost and x for Cost increase in equation (II).

  T=350+x ....... (IV)

Calculate volume of traffic expected for a 50 cent increase.

Substitute (350+x) for T and [6000x50(500)] for V in equation (III).

  R=(6000x 50( 500))×(350+x)=(600010x)(350+x)=2,100,000+6,000x3,500x10x2=2,100,000+2,500x10x2

For maximum value, calculate the first derivative of above equation and equate to zero.

  ddx(2,100,000+2,500x10x2)=0250020x=020x=2500x=125

Substitute 125 for x in equation (IV).

  T=350+125=475cents( 1$ 100cents)=$4.75

Conclusion:

Therefore, the toll charge to maximize revenue is $4.75.

To determine

(c)

The traffic volume after toll increase.

Expert Solution
Check Mark

Answer to Problem 4P

The traffic volume after toll increase is 4750veh/day.

Explanation of Solution

Calculations:

Calculate the traffic volume after toll increase.

Consider the expression for travel demand on the bridge related to toll increase and current volume.

  V=6000x50(500).

Substitute 125 for x in above equation.

  V=6,00012550(500)=6,0002.5(500)=6,0001,250=4750

Conclusion:

Therefore, the traffic volume after toll increase is 4750veh/day.

To determine

(d)

The total revenue increase with new toll.

Expert Solution
Check Mark

Answer to Problem 4P

The total revenue increase with new toll is $22,562.5.

Explanation of Solution

Calculations:

Substitute 4750veh/day for V and $4.75 for T in equation (III).

  R=4750×$4.75=$22,562.5

Conclusion:

Therefore, the total revenue increase with new toll is $22,562.5.

Want to see more full solutions like this?

Subscribe now to access step-by-step solutions to millions of textbook problems written by subject matter experts!
Students have asked these similar questions
A4.3- Design a square short column for P₁ = 1800 kN, Mfx = 250 kN.m, Mfy: f your final design p has to be between 0.01 and 0.02. = 50 kN.m. In Given: f'c = 25 MPa fy = 400 MPa Longitudinal bars: Use 25M Ties: 10M@ 300 Clear cover to the ties: 40mm
A4.1- For a concentrically loaded tied short column, with the cross-section shown in Figure 1, a) Find the axial load resistance of the column; b) Check if the spacing between the longitudinal bars is satisfying code requirements; c) Determine the required spacing between the ties, and sketch the tie arrangement as per the code. Given: f'c = 25 MPa fy = 400 MPa T 550 mm 550 mm Maximum aggregate size: 20mm Longitudinal bars: 8-25M Figure 1 Ties: 10M (ties are not shown on cross-section. The arrangement to be determined in part c) Clear cover to the ties: 40mm
When using a work breakdown structure (WBS) for a project why it is necessary to break down activities?
Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning
Text book image
Solid Waste Engineering
Civil Engineering
ISBN:9781305635203
Author:Worrell, William A.
Publisher:Cengage Learning,