(a)
The volume of traffic across the bridge.

Answer to Problem 3P
The volume of traffic across the bridge is
Explanation of Solution
Given:
The total cost to travel across bridge except tolls is expressed as,
Here,
The demand to travel across the bridge is,
Calculations:
Calculate volume of traffic across the bridge.
The total cost to travel across bridge except tolls is,
The volume across the bridge is,
Solve Equations (I) and (II).
Conclusion:
Therefore, the volume of traffic across the bridge is
(b)
The volume of traffic across the bridge if a toll of

Answer to Problem 3P
The volume of traffic across the bridge if a toll of
Explanation of Solution
Concept used:
Write the expression to calculate the volume expected for a
Here,
Calculations:
Calculate volume of traffic across the bridge if toll is increased to
The new cost of the cost of travel across bridge is,
Substitute
Calculate volume of traffic expected for a
Substitute
Conclusion:
Therefore, the volume of traffic across the bridge if a toll of
(c)
The volume of traffic across the bridge.

Answer to Problem 3P
The volume of traffic across the bridge is
Explanation of Solution
Given:
The total cost to travel across bridge including toll is expressed as,
Calculations:
Calculate volume of traffic across the bridge.
Substitute
Conclusion:
Therefore, the volume of traffic across the bridge is
(d)
The toll to yield the highest revenue for demand and supply function and the associated demand and revenue.

Answer to Problem 3P
The toll which yield the highest revenue for demand and supply function is
Explanation of Solution
Concept used:
Write the expression to calculate the revenue generated.
Here,
Calculations:
Assume the toll rate as
The new cost of the cost of travel across bridge is,
Substitute
Substitute
From the above equation, the toll which would yield the maximum revenue is 100 cents or
Substitute
Calculate the demand for travel across the bridge for maximum revenue.
Substitute
Conclusion:
Therefore, the toll which yield the highest revenue for demand and supply function is
Want to see more full solutions like this?
Chapter 2 Solutions
MindTap Engineering for Garber/Hoel's Traffic and Highway Engineering, 5th Edition, [Instant Access], 1 term (6 months)
- REINFORCED CONCRETE DESIGNFLEXURAL ANALYSIS OF BEAMS (CRACKED SECTION)Solution must be completeUse ballpen/inkpenAnswer in two decimal placesBox your final answerarrow_forwardA vertical parabolic curve has a back tangent of -5% and a forward tangent of +3% intersecting at station 1 + 240 at an elevation of 100m. If the stationing of PC is at 1 + 120, Evaluate the elevation at the third quarter point.arrow_forwardREINFORCED CONCRETE DESIGNFLEXURAL ANALYSIS OF BEAMS (CRACKED SECTION)Solution must be completeUse ballpen/inkpenAnswer in two decimal placesBox your final answerarrow_forward
- What is the volume of the earth's mantle in cubic kilometers? (tute problem 4d) Note: enter the number without units. For large (or small) numbers, use E notation, e.g. three million is equivalent to 3*10^6 which is 3E6 in E notation.arrow_forwardH.W: From an in-out survey conducted for a parking area consisting of 40 bays, the initial count was found to be 20 vehicles. Table gives the result of the survey. The number of vehicles coming in and out of the parking lot for a time interval of 5 minutes is as shown in the table below. Find the accumulation, total parking load, average occupancy and efficiency of the parking lot. Table: In-out survey data Time (minutes) In Out 5 3 2 10 6 2 15 3 1 20 6 7 25 6 4 30 8 6arrow_forwardcan you show me step for step? Autocad has me irritated.arrow_forward
- mummins) Is there any risk from a contaminant if 150 out of 3800 people exposed to the groundwater contaminant develop cancer and 125 out of 5000 people not exposed to the contamination also develop cancer? Why or why not? Use at least two methods to support your answer.arrow_forwardA spare buoy is a buoyant rod weighted to float and protrude vertically, as shown in thefigure below. Suppose that the buoy is made of maple wood ( specific gravity s = 0.6), has arectangular cross section ( 2.54cm by 2.54cm ), a length of 3.7 m , and is floating in seawater( specific gravity s =1.025 ). What weight of steel should be added to the bottom end of thebuoy so that h=0.45 cm? ( The specific gravity of steel s = 7.85 )arrow_forward8-42. Determine the displacement at point D. Use the principle of virtual work. El is constant. 60 kN 2m- 2 m B 30 kN/m 3 marrow_forward
- Two monitoring wells are spaced 500 m apart along the direction of groundwater flow in a confined aquifer 30.0 m thick. The difference in water level in the wells is 2.5 m. The hydraulic conductivity is 40 m/d. a) Sketch the aquifer and wells and label distances and direction of groundwater flow. b) If the real velocity of the groundwater is 0.6 m/d, what is the porosity? c) If it takes 10 years for a petroleum hydrocarbon plume to appear in the second well, what was the retardation factor?arrow_forward9. 0000) Water in a lake contains 10.5 ppb of vinyl chloride, which has a potency factor of 2.3 (mg/kg-d) 1 a. What is the incremental cancer risk for children (average weight of 15 kg) who may ingest 0.05 L of water per day while playing in the water every summer (for approximately 60 days) for 10 years? b. Is this risk acceptable? Why or why not?arrow_forward8-37. Determine the displacement of point C. Use the method of virtual work. El is constant. -12 ft- 3 k/ft -12 ft- Barrow_forward
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage LearningFundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,Solid Waste EngineeringCivil EngineeringISBN:9781305635203Author:Worrell, William A.Publisher:Cengage Learning,
- Engineering Fundamentals: An Introduction to Engi...Civil EngineeringISBN:9781305084766Author:Saeed MoaveniPublisher:Cengage Learning