Concept explainers
Rapid-Lube
A huge market exists for automobile tune-ups, oil charges, and lubrication service for more than 250 million vehicles on U.S. roads. Some of this demand is filled by full-service auto dealerships, some by Walmart and Firestone, and some by other tire/service dealers. However, Rapid-Lube, Mobil-Lube, Jiffy-Lube and others have also developed strategies to accommodate this opportunity.
Rapid-Lube stations perform oil changes, lubrication, and interior cleaning in a spotless environment. The buildings are clean, usually painted white, and often surrounded by neatly trimmed landscaping. To facilitate fast service, cars can be driven through three abreast. At Rapid-Lube, the customer is greeted by service representatives who are graduates of Rapid-Lube U. The Rapid-Lube school is not unlike McDonald’s Hamburger University near Chicago or Holiday Inn’s training school in Memphis. The greeter takes the order, which typically includes fluid checks (oil, water, brake fluid, transmission fluid, differential grease) and the necessary lubrication, as well as filter changes for air and oil. Service personnel in neat uniforms then move into action. The standard three-person team has one person checking fluid levels under the hood, another assigned interior vacuuming and window cleaning, and the third in the garage pit, removing the oil filler, draining the oil, checking the differential and transmission, and lubricating as necessary. Precise task assignments and good training are designed to move the car into and out of the bay in 10 minutes. The business model is to charge no more, and hopefully less, that gas stations, automotive repair chains and auto dealers, while providing better and faster service. Discussion Questions
1. What constitutes the mission of Rapid Lube?
2. How does the Rapid-Lube operations strategy provide competitive advantage? (Hint: Evaluate how Rapid-Lube’s traditional competitors perform the 10 decisions of operations management vs. how Rapid-Lube performs them.)
3. Is it likely that Rapid-Lube has increased productivity over its more traditional competitors? Why? How would we measure productivity in this industry?
Want to see the full answer?
Check out a sample textbook solutionChapter 2 Solutions
EP PRIN.OF OPERATIONS MGMT.-MYOMLAB
- I need to forecast using a 3-Period-Moving-Average-Monthly forecasting model which I did but then I need to use my forecast numbers to generate a Master Production Schedule (MPS) I have to Start with actual sales (my own test data numbers) for August-2022 Oct-2022 i need to create MPS to supply demand starting November-2022 April 2023 I just added numbers without applying formulas to the mps on the right side of the spreadsheet because I do not know how to do it. The second image is the example of what it should look like. Thank You.arrow_forwardSolve the following Question 1. How do volume and variety affect the process selection and layout types? Discuss 2. How is the human resource aspect important to operation function? Discuss 3. Discuss the supply network design and its impact on the overall performance of the organization.arrow_forwardHelp with question?arrow_forward
- What are some good examples of bullet points on a resume for a Christian Elementary School?arrow_forwardWhat is an example of a cover letter for a Christian School Long-Term Substitute Teaching position?arrow_forwardThe supply chain is a conventional notion, but organizations are only really interested in making products that they can sell to customers. Provided they have reliable supplies of materials and reasonable transport for finished products, logistics is irrelevant. Do you think this is true? If yes, explain, and if no, clearly explain as well.arrow_forward
- working as a program operations managerarrow_forward12 X1, X230 1 x =0x2 write the Following linear Programming model by 1- general Form Canonical Forms Canonical formY 2- Standard Form Max Z=35X+ 4 X 2 +6 X3 ST. X+2X2-5x3 = 40 3X, + 6X2 + 7x 3 = 30 7x, +lox2 x3 = 50 X3 X 2 X 3 <0arrow_forwarda/ a Minimum cost assign each worker for one job at Jobs J1 12 33 WI 2 4 6 W2 5 W3 5 33 6 7arrow_forward
- وبة واضافة هذه القيمة الى القيم Ex: Assign each job for each worker at minimum total Cost عمل لكل عامل وبأقل كلفة ممكنة obs الأعمال Workors العمال J1 J2 J3 J4 W₁ 15 13 14 12 W2 11 12 15 13 W3 13 12 10 11 W4 15 17 14 16arrow_forwardThe average completion time (flow time) for the sequence developed using the FCFS rule = 11.75 days (round your response to two decimal places). The percentage utilization for the sequence developed using the FCFS rule = 42.55 % (enter your response as a percentage rounded to two decimal places). b) Using the SPT (shortest processing time) decision rule for sequencing the jobs, the order is (to resolve a tie, use the order in which the jobs were received): An Alabama lumberyard has four jobs on order, as shown in the following table. Today is day 205 on the yard's schedule. In what sequence would the jobs be ranked according to the decision rules on the left: Job Due Date A 212 B 209 C 208 D 210 Duration (days) 6 3 3 8 Sequence 1 Job B 2 3 4 A D The average tardiness (job lateness) for the sequence developed using the SPT rule = 5.00 days (round your response to two decimal places). The average completion time (flow time) for the sequence developed using the SPT rule = 10.25 days…arrow_forwardWith the aid of examples, fully discuss any five (5) political tactics used in organisations.arrow_forward