Question
Chapter 2, Problem 33P
To determine
Calculate the difference in unit cost.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
The town council of Frostbite, Ontario, is trying to decide whether to build an outdoor skating rink which would cost $1.2 million and last for only one season. Operating costs would be zero. Yearly passes would be sold to anyone who wanted to use the rink. If p is the price of the pass in dollars, the number demanded would be q = 1600 - 0.5p. The council has asked you to advise them on building the rink. You should tell them that
Group of answer choices
a. revenues won’t cover construction costs at any ticket price. There is no way to increase total consumer surplus by building the rink.
b.if the rink is built and price is set to maximize profits, the town makes a profit and consumers will be better off.
c.if the rink is built and price is set to maximize profits, the town makes a profit but consumers are worse off than without a rink.
d.there is no price at which ticket revenues cover costs but the total consumer surplus from the rink exceeds costs.
e.None of the above.…
A small automotive supply company manufactures fuel gauges for various types of cars.
The company has fixed costs of $1,885,000 per year. The average cost of manufacturing a fuel gauge is $21.88.
The average price the fuel gauge sells for is $48.20
The company manufactures its products 252 days per year. What is the minimum number of fuel guages per
day that the company must produce in order to break even?
The town council of Frostbite, Ontario, is trying to decide whether to build an outdoor skating rink which would cost $1.2 million and last for only one season. Operating costs would be zero. Yearly passes would be sold to anyone who wanted to use the rink. If p is the price of the pass in dollars, the number demanded would be q = 1600 - 0.8p. The council has asked you to advise them on building the rink. You should tell them that
Group of answer choices
revenues won’t cover construction costs at any ticket price. There is no way to increase total consumer surplus by building the rink.
if the rink is built and price is set to maximize profits, the town makes a profit and consumers will be better off.
if the rink is built and price is set to maximize profits, the town makes a profit but consumers are worse off than without a rink.
there is no price at which ticket revenues cover costs but the total consumer surplus from the rink exceeds costs.
None of the above.
The function is…
Chapter 2 Solutions
Engineering Economy
Ch. 2 - An experimental composite engine block for an...Ch. 2 - Prob. 2PCh. 2 - Prob. 3PCh. 2 - Prob. 4PCh. 2 - Prob. 5PCh. 2 - Prob. 6PCh. 2 - Prob. 7PCh. 2 - Prob. 8PCh. 2 - Prob. 9PCh. 2 - Prob. 10P
Ch. 2 - Prob. 11PCh. 2 - Prob. 12PCh. 2 - Prob. 13PCh. 2 - Prob. 14PCh. 2 - Prob. 15PCh. 2 - Prob. 16PCh. 2 - Prob. 17PCh. 2 - Prob. 18PCh. 2 - Prob. 19PCh. 2 - Prob. 20PCh. 2 - Prob. 21PCh. 2 - Prob. 22PCh. 2 - Prob. 23PCh. 2 - Prob. 24PCh. 2 - Prob. 25PCh. 2 - Prob. 26PCh. 2 - Prob. 27PCh. 2 - Prob. 28PCh. 2 - Prob. 29PCh. 2 - Prob. 30PCh. 2 - Prob. 31PCh. 2 - An automobile dealership offers to fill the four...Ch. 2 - Prob. 33PCh. 2 - Prob. 34PCh. 2 - Prob. 35PCh. 2 - Prob. 36PCh. 2 - Prob. 37PCh. 2 - Prob. 38PCh. 2 - Prob. 39PCh. 2 - Prob. 40PCh. 2 - Prob. 41PCh. 2 - Prob. 42PCh. 2 - Prob. 43PCh. 2 - Prob. 44PCh. 2 - A hot water leak in one of the faucets of your...Ch. 2 - Prob. 46PCh. 2 - Prob. 47PCh. 2 - Prob. 48SECh. 2 - Prob. 49SECh. 2 - Prob. 50CSCh. 2 - Prob. 51CSCh. 2 - What is the optimal number of units that should be...Ch. 2 - Prob. 53FECh. 2 - Prob. 54FECh. 2 - Prob. 55FECh. 2 - Prob. 56FECh. 2 - Prob. 57FECh. 2 - Prob. 58FE
Knowledge Booster
Similar questions
- The bookstore at Tech purchases jackets emblazoned with the school name and logo from a vendor. The vendor sells the jackets to the store for $38 apiece. The cost to the bookstore for placing an order is $120, and the annual carrying cost is 25% of the cost of a jacket. The bookstore manager estimates that 1700 jackets will be sold during the year. The vendor has offered the bookstore the following volume discount schedule: Order Size 1–299 Discount 0% 300–499 2% 500–799 4% 800+ 5%arrow_forwardIn preparing for the upcoming holiday season, Fresh Toy Company (FTC) designed a new doll called The Dougie that teaches children how to dance. The fixed cost to produce the doll is $100,000. The variable cost, which includes material, labor, and shipping costs, is $34 per doll. During the holiday selling season, FTC will sell the dolls for $42 each. If FTC overproduces the dolls, the excess dolls will be sold in January through a distributor who has agreed to pay FTC $10 per doll. Demand for new toys during the holiday selling season is extremely uncertain. Forecasts are for expected sales of 60,000 dolls with a standard deviation of 15,000. The normal probability distribution is assumed to be a good description of the demand. FTC has tentatively decided to produce 60,000 units (the same as average demand), but it wants to conduct an analysis regarding this production quantity before finalizing the decision. (a) Create a what-if spreadsheet model using a formula that relates the…arrow_forwardA company produces and sells a consumer product and is ableto control the demand by varying the selling price. The approximate relationship between price and demand is p = 38+ (2,700/D) - (5000/D²) for D>1 The company is seeking to maximize its profit. The fixed cost is $1,000 and the variable cost is $ 40 per unit. What is the number of units that should be produced and sold each month to maximize profit? A 71 B 60 с 50 D 25arrow_forward
- A production order for 200 units is recieved. The item is made on a machine that has a $20 set-up, an output of six items per hour, and a daily fixed cost of $100. The variable item cost is $1.00. What is the highest price the cmpany could afford to buy the item for, instead of producing the item itself?arrow_forwardA building contractor has a contract which will expire in 40 days. He has 80 men on the job and can finish the job in 50days. The wage per day of 40 men is P500 each and the other 40 men is P300, each for 8 hours work per day. The fine for the delay in the work is P10,000 per day. How many more men should the contractor add in order to complete the work on time? b. Assuming that the additional men to be added will be paid P400 per day, will the contractor save money by employing enough men to complete the work on time or by not adding more men and paying the fine? How much is the savings, if any? Note: No overtime work is permittedarrow_forwardSuppose the cost of flying a 200-seat commercial airplane is as follows: Crew wages: 35617 AED Service of maintenance personnel and equipment: 16551 AED Cost of a passenger meal (provided complimentary to all passengers onboard): 45 AED Cost of issuing a boarding pass and luggage handling per passenger: 8 AED Just before departure, there are 10 empty seats. Just before departure, what is the minimum ticket price to allow one more passenger into the flightarrow_forward
- You get a discount on items when you order 500. The price of the item is $10 if you order less than 100 and $9 if you order 100 or more. The holding cost of the item is $2 per year. The setup cost is $20. The demand for the item is 2000 per year. Compute the optimal EOQ.arrow_forwardPNG’s managers estimate that a 50% increase in price would cause an 80% reduction in the quantity of product sold. Total fixed costs for the product are $5000 and total variable costs are $4000, based on production of 400 units. The following values may be useful. 1n (0.2) = –1.609 1n (1.5) = 0.405 1n (0.5) = –0.693 1n (4000) = 8.294 1n (0.8) = –0.223 1n (5000) = 8.517 What is PNG’s price elasticity of demand? –0.252 +0.322 –3.973 +3.108arrow_forwardAn architect-engineering firm is planning a parking lot to accommodate 500 vehicles. Each parking space will be 8.5 feet × 15 feet. It has been estimated that the space required for aisles will be 80% of the space required for parking. A local paving company charges $10 per square foot for paving and a flat fee of $12,000 for marking and painting the individual parking spaces. Based on this information, what is the estimated cost of paving and marking this parking lot?arrow_forward
- For the production of part R-193, two operations are being considered. The capital investment associated with each operation is identical. Operation 1 produces 2,100 parts per hour. After each hour, the tooling must be adjusted by the machine operator. This adjustment takes 15 minutes. The machine operator for Operation 1 is paid $24 per hour (this includes fringe benefits). Operation 2 produces 2,350 parts per hour, but the tooling needs to be adjusted by the operator only once every two hours. This adjustment takes 45 minutes. The machine operator for Operation 2 is paid $13 per hour (this includes fringe benefits). Assume an 8-hour workday. Further assume that all parts produced can be sold for $0.35 each. a. Should Operation 1 or Operation 2 be recommended? b. What is the basic tradeoff in this problem?arrow_forwardIn connection with surfacing a new highway, a contractor has a choice of two sites on which to set up the asphalt-mixing plant equipment. The contractor estimates that it will cost $1.25 per cubic yard mile (yd3 –mile) to haul the asphalt-paving material from the mixing plant to the job location. Factors relating to the two mixing sites are as follows: (See pic) The job requires 50,000 cubic yards of mixed-asphalt-paving material. It is estimated that four months (17 weeks of five working days per week) will be required for the job. Compare the two sites in terms of their total costs. Assume that the cost of the return trip is negligible. A) Which is the better site? B) For the selected site, how many cubic yards of paving material does the contractor have to deliver before staring to make a profit if paid $8.35 per cubic yard delivered to the job location?arrow_forwardFor the production of part R-193, two operations are being considered. The capital investment associated with each operation is identical. Operation 1 produces 2,000 parts per hour. After each hour, the tooling must be adjusted by the machine operator. This adjustment takes 20 minutes. The machine operator for Operation 1 is paid $20 per hour (this includes fringe benefits). Operation 2 produces 1,750 parts per hour, but the tooling needs to be adjusted by the operator only once every two hours. This adjustment takes 30 minutes. The machine operator for Operation 2 is paid $11 per hour (this includes fringe benefits). Assume an 8-hour workday. Further assume that all parts produced can be sold for $0.40 each. Should Operation 1 or Operation 2 be recommended?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Managerial Economics: Applications, Strategies an...EconomicsISBN:9781305506381Author:James R. McGuigan, R. Charles Moyer, Frederick H.deB. HarrisPublisher:Cengage Learning
Managerial Economics: Applications, Strategies an...
Economics
ISBN:9781305506381
Author:James R. McGuigan, R. Charles Moyer, Frederick H.deB. Harris
Publisher:Cengage Learning