Calculate the mean, standard deviation, and variance for the given measured values.

Answer to Problem 9P
The mean, variance, and standard deviation for the given values of lumber width are
The mean, variance, and standard deviation for the given values of steel spherical balls are
Explanation of Solution
Given data:
The given measured values of lumber width and steel spherical balls are shown below.
Lumber Width (in.) | Steel spherical balls (cm) |
3.50 | 1.00 |
3.55 | 0.95 |
2.55 | 1.05 |
3.60 | 1.10 |
3.55 | 1.00 |
3.40 | 0.90 |
3.40 | 0.85 |
3.65 | 1.05 |
3.35 | 0.95 |
3.60 | 0.90 |
The total number of measured values,
Formula used:
From equation 19.1 in the textbook, the formula to find mean for any sample is,
Here,
From equation 19.5 in the textbook, the formula to find the variance is,
From equation 19.6 in the textbook, the formula to find standard deviation is,
Calculation:
Calculation for Lumber width:
Substitute all the value of lumber width for
Substitute all the value of lumber width for
Substitute all the value of lumber width for
Calculation for steel spherical balls:
Substitute all the value of spherical balls for
Substitute all the value of spherical balls for
Substitute all the value of spherical balls for
Therefore, the mean, variance, and standard deviation for the given values of lumber width are
Conclusion:
Thus, the mean, variance, and standard deviation for the given values of lumber width are
Want to see more full solutions like this?
Chapter 19 Solutions
EP WEBASSIGN FOR MOAVENI'S ENGINEERING
- You are an engineer designing an aeration tank for a wastewater treatment plant receiving municipal waste. The activated sludge system (aeration tank and secondary clarifier) you design needs to remove 85% of the incoming BODs from the primary effluent, giving a final concentration of 30.0 mg BODs/L exiting the system. Your design will maintain a concentration of 2500 mg VSS/L and F/M ratio of 0.5 g BOD/g VSS d in the aeration tank. In an effort to keep the waste activated sludge low in water, only about 0.1% of the primary effluent flow (Q) exits the WAS line. The secondary effluent has a flow rate of 9990 m³/d. What volume (in m³) will the aeration tank need to be? Write out all equations and state any assumptions as needed. Primary effluent: Q. Xo, So Aeration tank V, X, S Secondary Secondary clarifier effluent: Qe, X, S O RAS line: Q, X., S Activated sludge control volume WAS line: Qwx, Sarrow_forwardb) Workers in a 1000 m³ processing room in a plastics factory are exposed to vinyl chloride (C2H3CI) gas, which is emitted when the plastic pellets are heated to make the final products. a) If the air change rate in the room is 0.21/h and the source strength of C2H3Cl is 68 mg/h, what is the steady state concentration of C2H3Cl (in mg/m³ and in ppmv) in the room at 25°C and 1 atm? Assume that C2H3Cl is conservative and that the concentration of the gas in the ambient air is zero. What is the concentration of vinyl chloride gas (in ppmv) in the same room 6 hours after all the machines are turned off at the end of the day?arrow_forward1) The reaction for the coagulation of water with alum is shown below. a. Balance the equation. Al2(SO4)3.18H2O + Aluminum sulfate (alum) HCO3- ←→ __AI(OH)3 + CO₂+ _H2O+ SO2- Bicarbonate precipitate ion b. If 125 mg/L of bicarbonate is in the water and the plant treats 432,000 L/d, how much aluminum hydroxide precipitate will the treatment plant operator need, to dispose of daily (in kg/d)?arrow_forward
- I am doing an assignment regarding building diagnosis. Please provide answer, explanation and useful links for learning purposes.arrow_forwardThree transportation projects have been proposed to increase the safety in and around a residential neighborhood. Each project consists of upgrading existing street signing to highly retroreflective sheeting to increase visibility. The following table shows the initial construction costs, annual operating costs, useful life of the sheeting, and salvage values for each alternative. Annual Operations and Maintenance Initial Construction Alternative Cost ($) 1 16,000 2 3 7,500 18,000 Costs ($) 2,000 3,750 2,000 Useful Life (years) Salvage Value ($) 10 5 10 6,000 850 7,300 Assume that the discount rate is 10 percent. Calculate the present worth (in dollars) for each alternative. (Assume for Alternative 2 that new sheeting must be purchased at the end of the first five years, and that all operations and maintenance costs are due at the end of each year.) PW1 PW 2 = $25967 Your response differs from the correct answer by more than 10%. Double check your calculations. = $21185.5 x PW 3 = $…arrow_forwardAverage demand on a rural roadway ranges from zero to 700 veh/day when the cost per trip goes from $1.50 to zero. (a) Calculate the net user benefits per year (in dollars) if the cost decreases from $1.00 to $0.50/trip (assume a linear demand function). Enter a number. (b) Compare the value calculated in (a) with the benefits as calculated in typical highway studies. (Enter the benefits in dollars as calculated in typical highway studies.) $arrow_forward
- help me with this Question for revision purpose and as well with references The office building was built in year 2017 and has not obtained any Green Mark certification before. The office building is occupied by a single tenant/entity. The building management team had done an analysis of the building’s energy performance by extracting the data from the various systems. The current performance and findings of the systems are listed in Appendix A. The client is considering to have the building undergo retrofitting to improve the building’s energy performance. The objective is to achieve Green Mark Gold Plus under the new Green Mark 2021 framework. For part (a) below, you are to use Pathway 1: EUI for this. (a) As part of the feasibility exercise, you are to interpret the current performance of the existing building based on the data available (Refer to Appendix A). You should then organise and present to the client how does the current building relate to the Energy Efficiency Section of…arrow_forwardhelp me with this Question for revision purpose and as well with references The office building was built in year 2017 and has not obtained any Green Mark certification before. The office building is occupied by a single tenant/entity. The building management team had done an analysis of the building’s energy performance by extracting the data from the various systems. The current performance and findings of the systems are listed in Appendix A. The client is considering to have the building undergo retrofitting to improve the building’s energy performance. The objective is to achieve Green Mark Gold Plus under the new Green Mark 2021 framework. For part (a) below, you are to use Pathway 1: EUI for this. (a) As part of the feasibility exercise, you are to interpret the current performance of the existing building based on the data available (Refer to Appendix A). You should then organise and present to the client how does the current building relate to the Energy Efficiency Section of…arrow_forwardWhat are the advantages and disadvanages of using a bar chart in construction scheduling?arrow_forward
- 1- Determine the area of the region enclosed by y = t sin(t), the x- axis, y-axis and x = Π 元-3arrow_forwardI am doing an assignment regarding building diagnosis. Provide answer, links and citations for learning purposes.arrow_forward2- Using n = a. TE 6 approximate the value of √3t7 sin(+4) dt using: Simpson's Rule.arrow_forward
- Engineering Fundamentals: An Introduction to Engi...Civil EngineeringISBN:9781305084766Author:Saeed MoaveniPublisher:Cengage Learning