(a)
Find the addition of matrix
(a)
Answer to Problem 17P
The addition of matrix
Explanation of Solution
Given data:
Calculation:
Add two matrixes
Reduce the equation (1) as follows,
Therefore, the addition of matrix
Conclusion:
Thus, the addition of matrix
(b)
Find the subtraction of matrix
(b)
Answer to Problem 17P
The subtraction of matrix
Explanation of Solution
Given data:
Calculation:
Subtract two matrixes
Reduce the equation (2) as follows,
Therefore, the subtraction of matrix
Conclusion:
Thus, the subtraction of matrix
(c)
Find the value of
(c)
Answer to Problem 17P
The value of
Explanation of Solution
Given data:
Calculation:
Three times of matrix
Reduce equation (3) as follows,
Therefore, the value of
Conclusion:
Thus, the value of
(d)
Find the multiplication of matrix
(d)
Answer to Problem 17P
The multiplication of matrix
Explanation of Solution
Given data:
Calculation:
Multiply the matrix
Reduce equation (4) as follows,
Therefore, the multiplication of matrix
Conclusion:
Therefore, the multiplication of matrix
(e)
Find the multiplication of matrix
(e)
Answer to Problem 17P
The multiplication of matrix
Explanation of Solution
Given data:
Calculation:
Multiply the matrix
Reduce equation (5) as follows,
Therefore, the multiplication of matrix
Conclusion:
Therefore, the multiplication of matrix
(f)
Find the square of matrix
(f)
Answer to Problem 17P
The square of matrix
Explanation of Solution
Given data:
Calculation:
Square of the matrix
Reduce equation (6) as follows,
Therefore, the square of matrix
Conclusion:
Therefore, the square of matrix
(g)
Prove the operation
(g)
Explanation of Solution
Given data:
Calculation:
Therefore,
Reduce equation (7) as follows,
Now,
Reduce equation (9) as follows,
Comparing equation (9) and (10),
Hence proved
Conclusion:
Thus, the operation
Want to see more full solutions like this?
Chapter 18 Solutions
Engineering Fundamentals: An Introduction to Engineering (MindTap Course List)
- Question 4 An engineer is assigned to design a 25-stories office building which has a building height of 75 m. Reinforced concrete shear wall system as shown in Figure Q1(a) is adopted to resist the lateral loads. The shear wall is of thickness t = 350 mm and length L = 8.5 m. Use the following data: Young's modulus of concrete E = 28 kN/mm² and the lateral load intensity w = 1.20 kN/m². Assuming the frontal width of the building façade is 15 m is facing the wind force which in turn transmitting the wind force to the shear wall system, estimate the total value of sway A at the roof level. Question 6 If the similar building in Question 4 is designed using rigid frame method is to be designed to ensure the sway is within the allowable limit. If the building width is B, and with the same building height H=75m. Using a rough estimation method, calculate the maximum allowable deflection A at the roof level. (A) 9.46 mm (B) 189.26 mm (C) 14.20 mm 町 141.95 mm 1ST STOREY FLOOR LEV. Shear wall…arrow_forwardWhat are the biggest challenges estimators' face during the quantity takeoff and pricing phases?arrow_forwardQuestion IV (30%): A 22 m thick normally consolidated clay layer has a load of 150 kPa applied to it over a large areal extent. The clay layer is located below a 3.5 m thick granular fill (p= 1.8 Mg/m³). A dense sandy gravel is found below the clay. The groundwater table is located at the top of the clay layer, and the submerged density of the clay soil is 0.95 Mg/m³. Consolidation tests performed on 2.20 cm thick doubly drained samples indicate the time for 50% consolidation completed as t50 = 10.5 min for a load increment close to that of the loaded clay layer. Compute the effective stress in the clay layer at a depth of 16 m below the ground surface 3.5 years after the application of the load.arrow_forward
- 13-3. Use the moment-distribution method to determine the moment at each joint of the symmetric bridge frame. Supports at F and E are fixed and B and C are fixed connected. Use Table 13-2. The modulus of elasticity is constant and the members are each 0.25 m thick. The haunches are parabolic. *13-4. Solve Prob. 13-3 using the slope-deflection equations. 13 0.5 m 1 m 64 kN/m D BC 1.5 m 2.25 m 2 m 6.25 m -0.5 m E -7.5 m -10 m- -7.5 m. Probs. 13-3/4arrow_forward2. Find the equivalent concentrated load(s) for the bags of cement stacked on the dock as shown here. Each bag weighs 100 lbs and is 12 inches long. Draw the loading conditions for each showing the equivalent concentrated load(s). 1 bag = 100lbs L= 12 ft L= 6 ft L= 8ftarrow_forwardI have a question for this problem in the first one wouldn't it be finding the total weight of the bags which =4800lbs and the multiply that by 12ft to find the concentrated load?? but if this is the case the load would end up as lbs/ft so I'm not too sure that is right.arrow_forward
- Q.2 The girder AB as shown in Fig. 2 has a span of 18m and supports concentrated loads located as shown. Determine the plastic moment capacity MP and the plastic collapse load Pc for the given load conditions. Use either Equilibrium drVirtual Work method in your solution. [30 marks] 5P 5P C d B 6 m 6 m 6 m 18 m Fig. 2 - Prismatic Continuousarrow_forward337 kN -Weld -25° 6 mm PROBLEM 1.33 A steel pipe of 300 mm outer diameter is fabricated from 6 mm thick plate by welding along a helix which forms an angle of 25° with a plane perpendicular to the axis of the pipe. Knowing that the maximum allowable normal and shearing stresses in directions respectively normal and tangential to the weld are σ = 50 MPa and 7 = 30 MPa, determine the magnitude P of the largest axial force that can be applied to the pipe.arrow_forward2.2 Identify the Zero Force Members for the truss shown. Show your final answer with a sketch and mark the zero force bars with "0". D 700 N 500 Narrow_forward