Textbook Question
Book Icon
Chapter 17, Problem 2.2ASC

Solving Tough Scheduling Problems in Healthcare

There are many scheduling problems in the healthcare arena, from scheduling nurses and OR rooms, to scheduling doctor’s appointments with no-shows, to triaging patients and doling out vaccinations; but one of the most critical scheduling problems involves organ transplants. A husband and wife team of surgeon (Segev) and mathematician (Gentry) have studied both kidney and liver transplant allocation and have made some groundbreaking recommendations.

For kidney transplants, finding an appropriate match is sometimes difficult. Waiting for a kidney from someone who is deceased can take too long. Unfortunately, even though a pers.ni can function with only one kidney, donating the other kidney to a loved one may not be possible if the blood type and oilier antibodies do not match. One solution is to pair two such incompatible couples so that the donors’ kidneys do not help their loved one directly but do allow them to receive a transplant more quickly. This is known as the Kidney Paired Donation (KPD) program, and before Gentry and Segev completed their research, perhaps 60 such exchanges took place each year. After applying a new matching algorithm to a nationwide set of donors/recipients, more than 600 exchange transplants were occurring each year, saving lives and over $750 million annually in healthcare costs.

Livers come from deceased donors and have a short shelf life of less than four hours, eliminating the possibility of lengthy transit times between donor and transplant center. In the United States, a recipient waiting list used to be divided into 11 geographic districts, and available livers were allocated within the same district (perhaps because of the limited transit time). This led to a disparity in service, with some districts having more need and less availability than others. Desperate patients were known to move into a more receptive district to await transplant. Gentry and Sedev sought to redraw the district boundaries to minimize disparity in access to livers.

Redistricting is a class of problems that uses integer programming (similar to linear programming) to design geographic boundaries between units, and is usually applied to school districts or voting districts. The integer programming model proposed by Gentry and Segev is designed specifically for liver transplant redistricting and is more transparent to the user than previous models. As is common with practical models, the liver committee had some design constraints in mind that reduced the size of the problem. The districts should be adjoining, the number of districts should be at least four and no more than eight, the maximum transport time should be three hours, and each district should have a minimum of six transplant centers. Gentry and Segev added the ranking of patients by need, called the MELD index, to the analysis. MELD prioritizes candidates based on the risk of death while awaiting liver transplantation.

A simulation model was built to test out the proposed 4-district, 6-district, and 8-district models over a five year time frame. The recommended 4-district plan would save 554 lives, cost $25,000 less than other plans, and eliminate the disparity between districts in receiving organs. The Liver Committee that manages allocation policies unanimously approved the 4-district plan (even when transplant centers in their own district would see a reduction in allocations).

Saving lives is an incredible payout for implementing a new scheduling or allocation model. What other kinds of major scheduling/allocation problems do you see in society that could be improved with careful analysis?

Blurred answer
Students have asked these similar questions
1) Under “Costs of Quality”, costs associated with quality can be classified into four categories: appraisal, prevention, internal failures, and external failures. The costs of quality for Corley Motors Logistics is given in the table.   Cost Elements Amount Checking outbound boxes for errors $31,000 Quality planning    $10,625 Downtime due to conveyor/computer problems $342,125 Incoming product inspection $21,000 Customer complaint rework $33,000  Correcting erroneous orders before shipping $36,550 Quality training of associates $25,925 Correction of typographical errors--pick tickets $11,475   a) Classify the quality cost elements given in the table into the different quality cost categories (prevention, appraisal, internal failure, external failure). b) Total the quality costs in each of the different quality cost categories (prevention, appraisal, internal failure, external failure). c) Using a) and b), suggest which areas…
Note: In chapter 9, section 9.4 of the Stevenson text, the costs of quality are covered; chapter 9 Stevenson lecture power point slide 7 touches upon this topic; see lecture video, 3.55 mins to 4.54 mins.   2) The production process at Hansa Ceylon Coffee fills boxes with dark arabica coffee. The data for the fill weight (in ounces) of eight samples are presented below. A sample size of six was used. The firm’s operations analyst wants to construct X-bar and R-charts to monitor the filling process.   Sample Sample Mean Sample Range 1 15.80 0.42 2 16.10 0.38 3 16.02 0.08 4 15.95 0.15 5 16.12 0.42 6 16.18 0.23 7 15.87 0.36 8 16.20 0.40   a) Calculate the upper and lower control limits for the X-bar chart. b) Calculate the upper and lower control limits for the R chart. c) Is the process under control? Why or why not?   Note: In chapter 10, section 10.3 of the Stevenson text, control charts for variables are…
Do the inherent differences between private and public sector objectives—profit versus publicgood—render private sector category management practices unsuitable for public sectorpurchasing, where open tendering is the norm?You have now undergone the Category Management classes and your superiors have requestedfor your input on how to integrate some of the learnings into the public sector policy. Discuss and elaborate what are the activities and governance you would introduce in yourrecommendations without violating the principle of transparency and accountability withinyour organisation. This is based on Singapore context. Pls provide a draft with explanation, examples and useful links for learning purposes. Citations will be good too. This is a module in SUSS called category management and supplier evaluation

Chapter 17 Solutions

Operations and Supply Chain Management, 9th Edition WileyPLUS Registration Card + Loose-leaf Print Companion

Ch. 17 - What three functions are typically performed by a...Ch. 17 - Prob. 4QCh. 17 - How can the success of a scheduling system be...Ch. 17 - Describe the process of loading and load leveling....Ch. 17 - What is the purpose of dispatch lists? How are...Ch. 17 - When should the following sequencing rules be...Ch. 17 - Give examples of sequencing rules you use to...Ch. 17 - What information is provided by the critical ratio...Ch. 17 - How are work packages, hot lists, and exception...Ch. 17 - What are Gantt charts, and why are they used so...Ch. 17 - Explain the concept behind input/output control....Ch. 17 - Explain the difference between infinite and finite...Ch. 17 - How does theory of constraints differ from...Ch. 17 - Explain the drum-buffer-rope concept.Ch. 17 - Discuss the similarities and differences between...Ch. 17 - What are some typical issues involved in employee...Ch. 17 - What quantitative techniques are available to help...Ch. 17 - At Valley Hospital, nurses beginning a new shift...Ch. 17 - Valley Hospital (from Problem 17.1) wants to focus...Ch. 17 - Prob. 3PCh. 17 - Sunshine House received a contract this year as a...Ch. 17 - Karina Nieto works for New Products Inc., and one...Ch. 17 - Decenture has four new IT hires available for...Ch. 17 - Blue Jeans Modeling Agency specializes in...Ch. 17 - Evan Schwartz has six jobs wailing to be processed...Ch. 17 - College students always have a lot of work to do,...Ch. 17 - Today is day 4 of the planning cycle. Sequence the...Ch. 17 - Alices Alterations has eight jobs to be completed...Ch. 17 - Jobs A. B, C, and D must be processed through the...Ch. 17 - Sequence the following jobs by (a) SPT, (b) DDATE,...Ch. 17 - Prob. 14PCh. 17 - Claims received by Healthwise Insurance Company...Ch. 17 - Jobs processed through Percys machine shop pass...Ch. 17 - Prob. 17PCh. 17 - Sassy U makes fashion jeans out of a variety of...Ch. 17 - Restore is a small repair shop that makes...Ch. 17 - Precision Painters, Inc., has five house painting...Ch. 17 - Tracy has six chapters on her desk that must be...Ch. 17 - Updike Upholstery cuts and sews fabric for custom...Ch. 17 - The following data have been compiled for an...Ch. 17 - The input/output report for Work Center 6 is as...Ch. 17 - Kim Johnson, R.N., the charge nurse of the...Ch. 17 - Rosemary Hanes needs help in scheduling volunteers...Ch. 17 - Schedule the wail staff at Vincents Restaurant...Ch. 17 - Mr. Baskins, manager of Tom and Jerrys Ice Cream...

Additional Business Textbook Solutions

Find more solutions based on key concepts
Knowledge Booster
Background pattern image
Operations Management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Text book image
Principles of Management
Management
ISBN:9780998625768
Author:OpenStax
Publisher:OpenStax College
Text book image
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY