Chapter 16.2, Problem 8E

The table below gives data on moisture content for specimens of a certain type of fabric. Determine control limits for a chart with center line at height 13.00 based on σ = .600, construct the control chart, and comment on its appearance.

Sample No. Moisture-Content Observations Chapter 16.2, Problem 8E, The table below gives data on moisture content for specimens of a certain type of fabric. Determine x ¯ s Range
1 12.2 12.1 13.3 13.0 13.0 12.72 .536 1.2
2 12.4 13.3 12.8 12.6 12.9 12.80 .339 .9
3 12.9 12.7 14.2 12.5 12.9 13.04 .669 1.7
4 13.2 13.0 13.0 12.6 13.9 13.14 .477 1.3
5 12.8 12.3 12.2 13.3 12.0 12.52 .526 1.3
6 13.9 13.4 13.1 12.4 13.2 13.20 .543 1.5
7 12.2 14.4 12.4 12.4 12.5 12.78 .912 2.2
8 12.6 12.8 13.5 13.9 13.1 13.18 .526 1.3
9 14.6 13.4 12.2 13.7 12.5 13.28 .963 2.4
10 12.8 12.3 12.6 13.2 12.8 12.74 .329 .9
11 12.6 13.1 12.7 13.2 12.3 12.78 .370 .9
12 13.5 12.3 12.8 13.1 12.9 12.92 .438 1.2
13 13.4 13.3 12.0 12.9 13.1 12.94 .559 1.4
14 13.5 12.4 13.0 13.6 13.4 13.18 .492 1.2
15 12.3 12.8 13.0 12.8 13.5 12.88 .432 1.2
16 12.6 13.4 12.1 13.2 13.3 12.92 .554 1.3
17 12.1 12.7 13.4 13.0 13.9 13.02 .683 1.8
18 13.0 12.8 13.0 13.3 13.1 13.04 .182 .5
19 12.4 13.2 13.0 14.0 13.1 13.14 .573 1.6
20 12.7 12.4 12.4 13.9 12.8 12.84 .619 1.5
21 12.6 12.8 12.7 13.4 13.0 12.90 .316 .8
22 12.7 13.4 12.1 13.2 13.3 12.94 .541 1.3
Blurred answer
Students have asked these similar questions
A major company in the Montreal area, offering a range of engineering services from project preparation to construction execution, and industrial project management, wants to ensure that the individuals who are responsible for project cost estimation and bid preparation demonstrate a certain uniformity in their estimates. The head of civil engineering and municipal services decided to structure an experimental plan to detect if there could be significant differences in project evaluation. Seven projects were selected, each of which had to be evaluated by each of the two estimators, with the order of the projects submitted being random. The obtained estimates are presented in the table below.   a) Complete the table above by calculating: i. The differences (A-B) ii. The sum of the differences iii. The mean of the differences iv. The standard deviation of the differences b) What is the value of the t-statistic? c) What is the critical t-value for this test at a significance level of 1%?…
Compute the relative risk of falling for the two groups (did not stop walking vs. did stop).  State/interpret your result verbally.
Microsoft Excel include formulas

Chapter 16 Solutions

Bundle: Probability and Statistics for Engineering and the Sciences, Loose-leaf Version, 9th + WebAssign Printed Access Card, Multi-Term Courses

Knowledge Booster
Background pattern image
Statistics
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, statistics and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Big Ideas Math A Bridge To Success Algebra 1: Stu...
Algebra
ISBN:9781680331141
Author:HOUGHTON MIFFLIN HARCOURT
Publisher:Houghton Mifflin Harcourt
Introduction to Statistical Quality Control (SQC); Author: FORSEdu;https://www.youtube.com/watch?v=c18FKHUDZv8;License: Standard YouTube License, CC-BY
[DAXX] Introduction to Statistical Quality Control; Author: The Academician;https://www.youtube.com/watch?v=ypZGDxjSM60;License: Standard Youtube License