
Concept explainers
Question
JIT at Arnold Palmer Hospital ☆ Video Case
Orlando’s Arnold Palmer Hospital, founded in 1989, specializes in treatment of women and children and is renowned for its high-quality rankings (top 10% of 2000 benchmarked hospitals), its labor and delivery volume (more than 16,000 births per year), and its neonatal intensive care unit (one of the highest survival rates in the nation). But quality medical practices and high patient satisfaction require costly inventory—some $30 million per year and thousands of SKUs.*
With pressure on medical care to manage and reduce costs, Arnold Palmer Hospital has turned toward controlling its inventory with just-in-time (JIT) techniques.
* SKU 5 stock keeping unit
Within the hospital, for example, drugs are now distributed at nursing workstations via dispensing machines (almost like vending machines) that electronically track patient usage and post the related charge to each patient. The dispensing stations are refilled each night, based on patient demand and prescriptions written by doctors.
To address JIT issues externally, Arnold Palmer Hospital turned to a major distribution partner, McKesson General Medical, which as a first-tier supplier provides the hospital with about one-quarter of all its medical/surgical inventory. McKesson supplies sponges, basins, towels, mayo stand covers, syringes, and hundreds of other medical/surgical items. To ensure coordinated daily delivery of inventory purchased from McKesson, an account executive has been assigned to the hospital on a full-time basis, as well as two other individuals who address customer service and product issues. The result has been a drop in Central Supply average daily inventory from $400,000 to $114,000 since JIT.
JIT success has also been achieved in the area of custom surgical packs. Custom surgical packs are the sterile coverings, disposable plastic trays, gauze, and the like, specialized to each type of surgical procedure. Arnold Palmer Hospital uses 10 different custom packs for various surgical procedures. “Over 50,000 packs are used each year, for a total cost of about $1.5 million,” says George DeLong, head of Supply-Chain Management.
The packs are not only delivered in a JIT manner but packed that way as well. That is, they are packed in the reverse order they are used so each item comes out of the pack in the sequence it is needed The packs are bulky, expensive, and must remain sterile. Reducing the inventory and handling while maintaining an assured sterile supply for
Here is how the supply chain works: Custom packs are assembled by a packing company with components supplied primarily from manufacturers selected by the hospital, and delivered by McKesson from its local warehouse. Arnold Palmer Hospital works with its own surgical staff (through the Medical Economics Outcome Committee) to identify and standardize the custom packs to reduce the number of custom pack SKUs. With this integrated system, pack safety stock inventory has been cut to one day.
The procedure to drive the custom surgical pack JIT system begins with a “pull” from the doctors’ daily surgical schedule. Then, Arnold Palmer Hospital initiates an electronic order to McKesson between 1:00 and 2:00 P.M. daily. At 4:00 A.M. the next day, McKesson delivers the packs. Hospital personnel arrive at 7:00 A.M. and stock the shelves for scheduled surgeries. McKesson then reorders from the packing company, which in turn “pulls” necessary inventory for the quantity of packs needed from the manufacturers.
Arnold Palmer Hospital’s JIT system reduces inventory investment, expensive traditional ordering, and bulky storage, and supports quality with a sterile delivery.
1. What do you recommend be done when an error is found in a pack as it is opened for an operation?

Want to see the full answer?
Check out a sample textbook solution
Chapter 16 Solutions
Operations Management
- Please help with the attached Capstone proposal Requirements:arrow_forwardLong term capacity plans and how to properly make decisions regarding long-term planning Long-term capacity plans cover periods longer periods of time. These plans are suitable for large businesses that want to scale their operations with a proven strategy for achieving production targets and meeting customer demands. Long-term capacity plans consider other factors apart from the productive requirements of the company. How important is it, in your mind, to properly make decisions regarding long-term capacity planning? How does this decision impact the present and future profitability of an organization? Be specific and give examples.arrow_forwardIn addition to the Amazon case study you provided, I'm curious if you've encountered other examples of companies successfully applying Little's Law to enhance their supply chain risk management practices. For instance, have you seen organizations use queuing theory to assess the potential ripple effects of disruptions, stress-test their contingency plans, or identify critical control points that require heightened monitoring and agility? Please provide a referencearrow_forward
- Sam's Pet Hotel operates 48 weeks per year, 6 days per week, and uses a continuous review inventory system. It purchases kitty litter for $13.00 per bag The following information is available about these bags: > Demand 85 bags/week >Order cost $60.00/order > Annual holding cost = 35 percent of cost > Desired cycle-service level 80 percent > Lead time = 4 weeks (24 working days) > Standard deviation of weekly demand = 15 bags > Current on-hand inventory is 320 bags, with no open orders or backorders. a. Suppose that the weekly demand forecast of 85 bags is incorrect and actual demand averages only 65 bags per week. How much higher will total costs be, owing to the distorted EOQ caused by this forecast error? The costs will be $higher owing to the error in EOQ. (Enter your response rounded to two decimal places.)arrow_forwardOsprey Sports stocks everything that a musky fisherman could want in the Great North Woods. A particular musky lure has been very popular with local fishermen as well as those who buy lures on the Internet from Osprey Sports. The cost to place orders with the supplier is $3030/order; the demand averages 55 lures per day, with a standard deviation of 11 lure; and the inventory holding cost is $1.001.00/lure/year. The lead time form the supplier is 1010 days, with a standard deviation of 33 days. It is important to maintain a 9898 percent cycle-service level to properly balance service with inventory holding costs. Osprey Sports is open 350 days a year to allow the owners the opportunity to fish for muskies during the prime season. The owners want to use a continuous review inventory system for this item. Refer to the standard normal table LOADING... for z-values. Part 2 a. What order quantity should be used? enter your response here lures. (Enter your response rounded to the…arrow_forward9. Research Methodology Fully explain the Quantitative research methodology that and add in the following sub-sections: . Data Collection • Data Analysisarrow_forward
- Ruby-Star Incorporated is considering two different vendors for one of its top-selling products which has an average weekly demand of 40 units and is valued at $80 per unit. Inbound shipments from vendor 1 will average 340 units with an average lead time (including ordering delays and transit time) of 2 weeks. Inbound shipments from vendor 2 will average 550 units with an average lead time of 1 week. Ruby-Star operates 52 weeks per year; it carries a 2-week supply of inventory as safety stock and no anticipation inventory. a. The average aggregate inventory value of the product if Ruby-Star used vendor 1 exclusively is $ (Enter your response as a whole number.)arrow_forwardThe Carbondale Hospital is considering the purchase of a new ambulance. The decision will rest partly on the anticipated mileage to be driven next year. The miles driven during the past 5 years are as follows: Year Mileage 1 3,000 2 3 4 4,000 3,450 3,850 5 3,800 a) Using a 2-year moving average, the forecast for year 6 = miles (round your response to the nearest whole number). b) If a 2-year moving average is used to make the forecast, the MAD based on this = miles (round your response to one decimal place). (Hint: You will have only 3 years of matched data.) c) The forecast for year 6 using a weighted 2-year moving average with weights of 0.40 and 0.60 (the weight of 0.60 is for the most recent period) = ☐ miles (round your response to the nearest whole number). miles (round your response to one decimal place). (Hint: You will have only 3 years of The MAD for the forecast developed using a weighted 2-year moving average with weights of 0.40 and 0.60 = matched data.) d) Using…arrow_forwardTask time estimates for the modification of an assembly line at Jim Goodale's Carbondale, Illinois, factory are as follows: B D G Time Activity (in hours) Immediate Predecessor(s) A 5.0 B 7.5 C 5.0 A DEFC 8.0 B, C 4.5 Figure 2 A B, C 7.7 D G 5.0 E, F This exercise contains only part a. a) The correct precedence diagram for the project is shown in 目 F B Figure 3 A E B E ☑ D Farrow_forward
- Dave Fletcher was able to determine the activity times for constructing his laser scanning machine. Fletcher would like to determine ES, EF, LS, LF, and slack for each activity. The total project completion time and the critical path should also be determined. Here are the activity times: Activity Time (weeks) Immediate Predecessor(s) Activity Time (weeks) Immediate Predecessor(s) A 6 E 3 B B 8 F 6 B C 3 A G 11 C, E D 1 A H 7 D, F Dave's earliest start (ES) and earliest finish (EF) are: Activity ES .EF A 0 6 B 0 8 C 3 9 D 6 E F 8 G 22 H 21 Dave's latest start (LS) and latest finish (LF) are: Activity LS LF H 15 G 11 F 9arrow_forwardThere are multiple ways a company can enter a foreign market. Explore two possibilities such as exporting, foreign direct investment, and collaborations (joint ventures, alliances, licensing, franchising), and evaluate the pros and cons of each method. Which types of products and services would be appropriate for each market entry method?arrow_forward01,3 ☐ Question 3 Scenario 9.3 4 pts The Talbot Company uses electrical assemblies to produce an array of small appliances. One of its high cost/high volume assemblies, the XO-01, has an estimated annual demand of 8,000 units. Talbot estimates the cost to place an order is $50, and the holding cost for each assembly is $20 per year. The company operates 250 days per year. Use the information in Scenario 9.3. What is the annual inventory holding cost if Talbot orders using the EOQ quantity? O less than or equal to $1,500 Ogreater than $4,000 but less than or equal to $6,500 O greater than $6,500 O greater than $1,500 but less than or equal to $4,000 Nextarrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningMarketingMarketingISBN:9780357033791Author:Pride, William MPublisher:South Western Educational Publishing

