Chapter 15, Problem
To determine
(a)
From the given from
To determine
(b)
Lane and usable shoulder lengths.
To determine
(c)
Maximum desirable grade for rolling terrain.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
28-7 A long segment of suburban freeway is to be designed on level terrain. The level segment, however, is followed by a 4.5% grade, 2.0 miles in length. If the DDHV is 2,500 veh/h with 15% trucks (standard mix), how many lanes will be needed on the (a) upgrade, (b) downgrade, (c) level terrain segment to provide for level of service C? Lane widths and lateral clearances may be assumed to be 12 ft and 6 ft, respectively. Ramp density is expected to be 1.0 ramps/mi. The PHF is 0.92. Good weather, no incidents, no work zones, and regular users of the facility may be assumed.
A new basic freeway segment will have 3 lanes in each direction. The left and center lane each has a width of 12 ft while the width of the right lane is 13 ft. The left shoulder is 4 ft while the right shoulder is also 4 ft. There are 2 interchanges within 6 miles (3 miles upstream and 3 miles down stream).The site has level terrain, the design speed is 80 mph the hourly design volume is 5250 veh/h, which includes 9.0% trucks and buses. The peak hour factor is 0.870.
Calculate FHV, VP, FFS, LOS Show all work
An existing four-lane freeway in rural area is with the following :information Lane width 3.5m, 0.9m lateral clearance, 1800 veh/hr peak hour volume, PHF=0.9, interchange density =0.90, 5% trucks, 5% buses and the road is within a mountainous terrain. Then based on the HCM procedure, the service flow rate (pc/h/In) is
Chapter 15 Solutions
Traffic and Highway Engineering
Knowledge Booster
Similar questions
- A long segment of suburban freeway is to be designed on level terrain. The level segment, however, is followed by a 4.5% grade, 2.0 miles in length. If the DDHV is 2,500 vehicles per hour with 15% trucks (standard mix), how many lanes will be needed on the (A.) Upgrade, (B.) Downgrade, (C.) Level terrain segment to provide for level of service C? Lane widths and lateral clearances may be assumed to be 12 feet and 6 feet, respectively. Ramp density is expected to be 1.0 ramps per mile. The PHF is 0.92. Good weather, no incidents, no work zones, and regular users of the facility may be assumed.arrow_forwardAn existing four-lane freeway in rural area is with the following :information Lane width 3.5m, 0.9m lateral clearance, 1800 veh/hr peak hour volume, PHF=0.9, interchange density =0.90, 5% trucks, 5% buses and the road is within a mountainous terrain. Then based on the HCM procedure, the service flow rate (pc/h/In) isarrow_forwardA rural collector highway is to be constructed in an area of rolling terrain where the ADT is 950 veh/day. For this situation, determine the following design values: a. Minimum design speed b. Desirable lane width and shoulder width c. Maximum desirable gradearrow_forward
- An existing urban freeway with 4 lanes in each direction has the following characteristics. Traffic data: Peak hour volume (in the peak direction): 7,110 veh/h Trucks: 10% of peak hour volume PHF = 0.93 Geometric data: Lane width: 11 ft Shoulder width: 6 ft Total ramp density: 1.8 ramps per mile Terrain: rolling Determine the LOS in the peak hour. (Assume commuter traffic and assume no RVs.) LOS A LOS B LOS C LOS D LOS E LOS F Show the demand flow rate (in pc/h/ln), mean speed (in mi/h), and density (in pc/mi/ln) for the given conditions. demand flow rate pc/h/lnmean speed mi/h density pc/mi/lnarrow_forwardA six-lane freeway (three lanes in each direction) has regular weekday users and currently operates at maximum LOS C conditions. The lanes are 11 ft wide, the right-side shoulder is 4 ft wide, and there are two ramps within three miles upstream of the segment midpoint and one ramp within three miles downstream of the segment midpoint. The highway is on rolling terrain with 10% large trucks and buses (no recreational vehicles), and the peak-hour factor is 0.90. Determine the hourly volume for these conditions.arrow_forwardA six-lane freeway (three lanes in each direction) has regular weekday users and currently operates at maximum LOS C conditions. The lanes are 11 ft wide, the right-side shoulder is 4 ft wide, and there are two ramps within three miles upstream of the segment midpoint and one ramp within three miles downstream of the segment midpoint. The highway is on rolling terrain with 10% large trucks and buses (no recreational vehicles), and the peak-hour factor is 0.90. b.) Determine the adjustment factor (f). (Express in three decimals)arrow_forward
- A six-lane freeway (three lanes in each direction) has regular weekday users and currently operates at maximum LOS C conditions. The lanes are 11 ft wide, the right-side shoulder is 4 ft wide, and there are two ramps within three miles upstream of the segment midpoint and one ramp within three miles downstream of the segment midpoint. The highway is on rolling terrain with 10% large trucks and buses (no recreational vehicles), and the peak-hour factor is 0.90. a.) Determine the Free Flow Speedarrow_forwardA four-lane freeway (2 lanes in each direction) has regular weekday users and currently operates at maximum LOS C conditions. The lanes are 12 ft wide, the right-side shoulder is 4 ft wide, and there are two ramps within three miles upstream of the segment midpoint and one ramp within three miles downstream of the segment midpoint. The highway is on rolling terrain with 10% large trucks and buses (no recreational vehicles), and the peak-hour factor is 0.90. Determine the D in pc/mi/h and vp in pc/hr/ln.arrow_forward6.14 A freeway segment currently has four 11-ft wide lanes and a 3-ft right shoulder in the southbound direction. It is operating in LOS B with a traffic density of 15.6 pc/mi/ln and a peak-hour factor of 0.85. The freeway is on level terrain with 15% heavy vehicles, and currently has no on- or off- ramps within a distance of three miles upstream and downstream of the mid-point of the analysis section. New interchanges are to be constructed that would result in 6 on- and off-ramps within the distance of three miles upstream and downstream of the mid- point of the analysis section and total traffic volume is projected to double, with the same percentage of heavy vehicles, and the peak-hour factor going to 0.95. What would the new LOS and density be after the interchange construction and new traffic conditions?arrow_forward
- A six-lane freeway (three lanes in each direction) in rolling terrain has 10-ft lanes and obstructions (fLw = 6.0 mph) 4 ft from the right edge of the traveled pavement (fic = 0.8 mph). There are five ramps within three miles upstream of the segment midpoint and four ramps within three miles downstream of the segment midpoint. A directional peak-hour volume of 2000 vehicles (primarily commuters) is observed, with 600 vehicles arriving in the highest 15-min flow rate period. The traffic stream contains 12% large trucks (ET = 2.5) and buses and 6% recreational vehicles (ER = 2.0). 1.) What is the estimated free-flow speed of the traffic stream in mph (whole number, nearest 5)? 2.) What is the peak-hour factor 3.) What is the heavy-vehicle adjustment factor? 4.) What is the service flow rate? 5.) What is the service measure value if the average speed of the traffic stream is 65 mpharrow_forwardA six-lane freeway (three lanes in each direction) in rolling terrain has 10-ft lanes and obstructions (fLW = 6.0 mph) 4 ft from the right edge of the traveled pavement (fLC = 0.8 mph). There are five ramps within three miles upstream of the segment midpoint and four ramps within three miles downstream of the segment midpoint. A directional peak-hour volume of 2000 vehicles (primarily commuters) is observed, with 600 vehicles arriving in the highest 15-min flow rate period. The traffic stream contains 12% large trucks (ET = 2.5) and buses and 6% recreational vehicles (ER = 2.0). What is the heavy-vehicle adjustment factor (2 decimal places)?arrow_forwardFind the service flow rate and service volume rate for an 8-lane-one direction urban freeway at level of service (A) with the following: 11-ft lane, 0-ft lane clearance, 2-per mile interchange density and 5% truck. The section is 4% upgrade for 1 mile. Use PHF = 0.85.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning