Concept explainers
Find the amount of coal (in kg) required for generating for each year.

Answer to Problem 17P
The amount of coal (in kg) required for generating electricity for each year are calculated and tabulated in Table 1.
Explanation of Solution
Given data:
Refer to problem 13-17 accompanying table in the textbook, the average efficiency of the power plants is 35%.
The heating value of the coal is
Formula used:
Formula to calculate the power plant efficiency is,
Rearrange the equation,
Convert kWh to MJ,
Formula to calculate the amount of coal required for generating one year is,
Calculation:
Find the energy input from the fuel in each year:
Substitute
Substitute
Substitute
Substitute
Substitute
Substitute
Substitute
Now convert all the values from kWh to MJ:
Substitute
Substitute
Substitute
Substitute
Substitute
Substitute
Substitute
Now find the amount of coal required in every year:
Substitute
Substitute
Substitute
Substitute
Substitute
Substitute
Substitute
Therefore, the energy input for all years for Coal, in kWh and MJ along with coal required to produce 35% of efficiency is shown in Table 1 (with approximately rounded values).
Table 1
Energy Produced (10^9 kWh) | Energy(considering efficiency) 109 kWh | Energy (considering efficiency) 109 MJ | Amount of coal needed in kg |
1161.562 | 3318.748571 | 11947.49486 | 1.59E+12 |
1594.011 | 4554.317143 | 16395.54171 | 2.19E+12 |
1966.265 | 5617.9 | 20224.44 | 2.70E+12 |
2040.913 | 5831.18 | 20992.248 | 2.80E+12 |
2217.555 | 6335.871429 | 22809.13714 | 3.04E+12 |
2504.786 | 7156.531429 | 25763.51314 | 3.44E+12 |
3380.674 | 9569.068571 | 34772.64686 | 4.64E+12 |
Conclusion:
Hence, the amount of coal (in kg) required for generating electricity for each year has been calculated.
Want to see more full solutions like this?
Chapter 13 Solutions
ENGINEERING FUNDAMENTALS
- 6000 units have been installed to date with 9,000 units to install. Labor costs are $23,300.00 to date. What is the unit cost for labor to date?arrow_forwardThe base rate for labor is $15/hr. The labor burden is 35% and 3% for small tools for the labor. There are 1000 units to install. Records indicate that trade workers can install 10 units per hour, per trade worker. The owners need 15% overhead and profit to pay bills, pay interest on loan and provide some profit to the partners. What is the minimum bid assuming no risk avoidance factor?arrow_forwardCan you show me how to obtain these answers thanks, will rate!arrow_forward
- I have the answers for part a just need help with b mostly thanksarrow_forwardPlease explain step by step and show formulasarrow_forward5. (20 Points) Consider a channel width change in the same 7-foot wide rectangular in Problem 4. The horizontal channel narrows as depicted below. The flow rate is 90 cfs, and the energy loss (headloss) through the transition is 0.05 feet. The water depth at the entrance to the transition is initially 4'. 1 b₁ TOTAL ENERGY LINE V² 129 У1 I b₂ TOP VIEW 2 PROFILE VIEW h₁ = 0.05 EGL Y₂ = ? a) b) c) 2 Determine the width, b₂ that will cause a choke at location 2. Determine the water depth at the downstream end of the channel transition (y₂) section if b₂ = 5 feet. Calculate the change in water level after the transition. Plot the specific energy diagram showing all key points. Provide printout in homework. d) What will occur if b₂ = = 1.5 ft.?arrow_forward
- 4. (20 Points) A transition section has been proposed to raise the bed level a height Dz in a 7-foot wide rectangular channel. The design flow rate in the channel is 90 cfs, and the energy loss (headloss) through the transition is 0.05 feet. The water depth at the entrance to the transition section is initially 4 feet. b₁ = b = b2 1 TOTAL ENERGY LINE V² 129 Ут TOP VIEW 2 hloss = 0.05 " EGL Y₂ = ? PROFILE VIEW a) Determine the minimum bed level rise, Dz, which will choke the flow. b) If the step height, Dz = 1 ft, determine the water depth (y2) at the downstream end of the channel transition section. Calculate the amount the water level drops or rises over the step. c) Plot the specific energy diagram showing all key points. Provide printout in Bework. d) What will occur if Dz = 3.0 ft.?. Crest Front Viewarrow_forward1. (20 Points) Determine the critical depth in the trapezoidal drainage ditch shown below. The slope of the ditch is 0.0016, the side slopes are 1V:2.5H, the bottom width is b = 14', and the design discharge is 500 cfs. At this discharge the depth is y = 4.25'. Also, determine the flow regime and calculate the Froude number. Ye= ? Z barrow_forward3. (20 Points) A broad crested weir, 10 feet high, will be constructed in a rectangular channel B feet wide. The weir crest extends a length of B = 120 feet between the banks with 2 - 4 foot wide, round nosed piers in the channel. The width of the weir crest is 8 feet. If H = 6', determine the design discharge for the weir.arrow_forward
- Parking Needs vs. Alternative Transportation Methods for presentation slides include images and graphsarrow_forwardPlease explain step by step and show formulararrow_forwardBeam ABD is supported and loaded as shown. The cross-section of the beam is also shown. The modulus of elasticity of the beam is 200 GPa. 6.0 kN/m Cross-section: 330 mm 4.5 kN 8.0 kNm 40 mm 2.5 m 1.5 m 20 mm Set up the discontinuity moment function in terms of x. List all the appropriate boundary conditions. Determine the slope function in terms of x. Determine the deflection function in terms of x. Determine the support reactions. Determine the maximum deflection. 290 mmarrow_forward
- Engineering Fundamentals: An Introduction to Engi...Civil EngineeringISBN:9781305084766Author:Saeed MoaveniPublisher:Cengage LearningSustainable EnergyCivil EngineeringISBN:9781133108689Author:Richard A. DunlapPublisher:Cengage Learning