Question
Book Icon
Chapter 12, Problem 67AP

a

Summary Introduction

Interpretation:

Acceptability of heavy duty nails lot

Concept Introduction:

Normal distribution is the probability function with continuous series. It is bell shaped distribution function where mean, median and mode are same.

a

Expert Solution
Check Mark

Answer to Problem 67AP

  α is 0.0803 and β is 0.0028.

Explanation of Solution

Given information:

n = 100

c= 2

AQL = 1%

LTPD = 10%

  α=0.0803 as = 10000

and β=0.0028 are the producers and consumers risk factor respectively. α , represents the probability that a sampling plan might reject the good lot whereas β , represents the probability that a sampling plan might accept the bad lot.

Lot size, N=10,000

Accepted Quality Level (AQL) is 1%

Lot Tolerance Percent Defective (LTPD) is 10%

  pο=0.01p1=0.10

  α=P{X>c/p=1,n=100}

  =P{X>2/θ=1}=0.0803

  β=P{X£/p=0.1,n=100}

  =P{X£2/θ=10}=0.0028

Hence, α is 0.0803 and β is 0.0028.

b

Summary Introduction

Interpretation:

Sequential sampling plan

Concept Introduction:

Normal distribution is the probability function with continuous series. It is bell shaped distribution function where mean, median and mode are same.

b

Expert Solution
Check Mark

Answer to Problem 67AP

Sequential sampling plan with two limit lines are xa=2.42+0.0394n and xt=1.051+0.0397n

Explanation of Solution

Given information:

n = 100

c= 2

AQL = 1%

LTPD = 10%

  α=0.0803 as = 10000

Computation of two lines

Calculate the values of k, h1 and h2 by using the following formula.

  k=log[p2(1 p 1)p1(1 p 2)].....(1)

  h1=1k[log(1αβ)].....(2)

  h2=1k[log(1βα)]......(3)

  s=1k[log(10.0110.10)]....(4)

Information known as per the problem

  p1=0.01p2=0.10α=0.0803β=0.0028

Now, substitute these values in equation (1) to calculate k as shown below

  k=log[p2(1 p 1)p1(1 p 2)]

  =log[0.10(10.01)0.01(10.10)]

  =log0.0990.009=log11=1.041

Now, substitute these values in equation (2) to calculate h1 as shown below:

  h1=1k[log(1αβ)]

  =11.041[log(10.08030.0028)]

  =11.041[log(0.91970.0028)]

  =0.96(log328.46)=0.96×2.52=2.42

Now, substitute these values in equation (3) to calculate h2 as shown below:

  h2=1k[log(1βα)]

= 10.041[log(10.00280.0803)]

  =11.041[log( 0.9972 0.0803)]=0.96(log12.42)=0.96×1.095=1.051

Similarly, substitute these values in equation (4) to calculate s as shown below:

  s=1k[log(10.0110.10)]

  =11.041[log(0.990.90)]

  =0.96[log(1.1)]

  =0.96×0.0413=0.0397

Calculate the two limit lines by substituting the values of 2.42, 1.051 and 0.0397 in the h1 , h2 and s respectively in the below formulae.

  xa=h1+sn

  xt=h2+sn

  xa=2.42+0.0394n

  xt=1.051+0.0397n

Hence, the two limit lines are xa=2.42+0.0394n and xt=1.051+0.0397n .

c

Summary Introduction

Interpretation:

Maximum value of the expected sample size

Concept Introduction:

Normal distribution is the probability function with continuous series. It is bell shaped distribution function where mean, median and mode are same.

c

Expert Solution
Check Mark

Answer to Problem 67AP

The maximum expected number of items which must be sampled is probably less than 75.

Explanation of Solution

Given information:

n = 100

c= 2

AQL = 1%

LTPD = 10%

  α=0.0803 as = 10000

At p=0 ASN=60.86

At p=0.1 ASN=71.97

At p=0.0397 ASN=66.6

Based on this, the maximum expected number of items which must be sampled is probably less than 75.

d

Summary Introduction

Interpretation:

Graphical representation of acceptance and rejection region and check whether sequential sampling plan would recommend acceptance or rejection on or before testing 100th nail.

Concept Introduction:

Normal distribution is the probability function with continuous series. It is bell shaped distribution function where mean, median and mode are same.

d

Expert Solution
Check Mark

Explanation of Solution

  EBK PRODUCTION AND OPERATIONS ANALYSIS, Chapter 12, Problem 67AP

Hence, acceptance would be recommended on 61st nail.

Want to see more full solutions like this?

Subscribe now to access step-by-step solutions to millions of textbook problems written by subject matter experts!
Students have asked these similar questions
The forecast for each week of a four-week schedule is 50 units. The MPS rule is to schedule production if the projected on-hand Inventory would be negative without it. Customer orders (committed) are follows: Week Customer Order 1 52 35 20 12 Use a production lot size of 75 units and no beginning Inventory. Determine the available-to-promise (ATP) quantities for each period. Note: Leave no cells blank - be certain to enter "0" wherever required. Period ATP 1 2 3
Prepare a master schedule given this information: The forecast for each week of an eight-week schedule is 60 units. The MPS rule is to schedule production if the projected on-hand Inventory would be negative without it. Customer orders (committed) are as follows: Week Customer Orders 1 2 36 28 4 1 Use a production lot size of 85 units and no beginning inventory. Note: In the ATP row, enter a value of 0 (zero) in any periods where ATP should not be calculated. Leave no cells blank - be certain to enter "0" wherever required. June July 1 2 3 4 5 8 7 8 Forecast 60 60 60 60 60 60 60 60 Customer Orders 38 28 4 1 0 0 0 0 Projected On-Hand Inventory MPS ATP
Sales of tablet computers at Marika Gonzalez's electronics store in Washington, D.C., over the past 10 weeks are shown in the table below: Week 1 2 3 4 5 6 7 8 9 10 Demand 21 21 27 38 25 30 35 24 25 30 a) The forecast for weeks 2 through 10 using exponential smoothing with a = 0.50 and a week 1 initial forecast of 21.0 are (round your responses to two decimal places): Week 1 2 3 4 5 6 7 8 9 10 Demand 21 21 27 38 25 30 35 24 25 30 Forecast 21.0 21 21 24 31 28 29 32 28 26.50 b) For the forecast developed using exponential smoothing (a = 0.50 and initial forecast 21.0), the MAD = |||||sales (round your response to two decimal places).
Knowledge Booster
Background pattern image
Operations Management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Text book image
Principles of Management
Management
ISBN:9780998625768
Author:OpenStax
Publisher:OpenStax College
Text book image
MARKETING 2018
Marketing
ISBN:9780357033753
Author:Pride
Publisher:CENGAGE L