Chapter 12, Problem 2P
To determine
Select the alternative.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
Hudson Corporation is considering three options for managing its data warehouse: continuing with its own staff, hiring
an outside vendor to do the managing, or using a combination of its own staff and an outside vendor. The cost of the
operation depends on future demand. The annual cost of each option (in thousands of dollars) depends on demand as
follows:
a. If the demand probabilities are 0.2, 0.5, and 0.3, which decision alternative will minimize the expected cost of
the data warehouse? What is the expected annual cost associated with that recommendation?
b. Construct a risk profile for the optimal decision in part (a). What is the probability of the cost exceeding
$700,000?
Only typed answer
Consolidated Edison Power is evaluating the construction of a new electric generation facility. The two choices are a coal-burning plant (CB) and a gaseous diffusion (GD) plant. The CB plant will cost $160 per megawatt to construct, and the GD plant will cost $180 per megawatt. Owing to uncertainties concerning fuel availability and the impact of future regulations related to air and water quality, the useful life of each plant is unknown, but the following probability estimates have been made .a. Determine the expected life of each plant. b. Based on the ratio of construction cost per megawatt to expected life, which plant would you recommend that Con Ed build?
Chapter 12 Solutions
Engineering Economy
Ch. 12 - Prob. 1PCh. 12 - Prob. 2PCh. 12 - A new snow making machine utilizes technology that...Ch. 12 - Prob. 4PCh. 12 - Prob. 5PCh. 12 - Prob. 6PCh. 12 - Prob. 7PCh. 12 - Prob. 8PCh. 12 - Prob. 9PCh. 12 - Prob. 10P
Ch. 12 - Prob. 11PCh. 12 - Prob. 12PCh. 12 - Prob. 13PCh. 12 - Prob. 14PCh. 12 - Prob. 15PCh. 12 - Prob. 16PCh. 12 - Prob. 17PCh. 12 - Prob. 18PCh. 12 - Prob. 19PCh. 12 - Prob. 20PCh. 12 - Prob. 21PCh. 12 - Prob. 22PCh. 12 - If the interest rate is 8% per year, what decision...Ch. 12 - Prob. 24PCh. 12 - Prob. 25PCh. 12 - Prob. 26SE
Knowledge Booster
Similar questions
- From the decision tree branch shown, determine the expected values of the two outcomes if decision D3 is already selected and the maximum outcome value is sought. (This decision branch is part of a larger tree.) Probability 0.4 03 0.3 0.3 0.6 When the probability is 0.4, the value is $60. When the probability is 0.3, the value is $-27. When the probability is 0.3, the value is $20. When the probability is 0.6, the value is $-11. When the probability is 0.4, the value is $6.2. 0.4 The expected value of the the top node is $ The expected value of the bottom node is $[arrow_forwardFive years ago a dam was constructed to impound irrigation water and to provide flood protection for the area below the dam. Last winter a 100-year flood caused extensive damage both to the dam and to the surrounding area. This was not surprising, since the dam was designed for a 50-year flood. The cost to repair the dam now will be $250,000. Damage in the valley below amounts to $750,000. If the spillway is redesigned at a cost of $250,000 and the dam is repaired for another $250,000, the dam may be expected to withstand a 100-year flood without sustaining damage. However, the storage capacity of the dam will not be increased and the probability of damage to the surrounding area below the dam will be unchanged. A second dam can be constructed up the river from the existing dam for $1 million. The capacity of the second dam would be more than adequate to provide the desired flood protection. If the second dam is built, redesign of the existing dam spillway will not be necessary, but…arrow_forwardData in the matrix below indicates COST expected from 3 alternatives under 4 states of nature. Determine which alternative is dominant using With and Without Probability (use a = 0.3 and probability of: 30%; 20%; 40% & 10% for S1, S2, S3, and 54 respectively): Which alternative is best using Expected Value? Alternatives S1 53 S4 A1 10 18 15 A2 12 25 20 A3 15 19 25 S2 20 15 18arrow_forward
- Assume a pool of 115 people in an insurance pool (a group of people insured through community rating). It is estimated that a small number in the pool will have significant pre- existing conditions as indicated in the table. Based on the age of these 115 people, the insurance company estimates the following distribution of health care claims (which includes necessary profit and administrative costs of the insurance company). Number of Insured Antidipated Heath Costs/Year/Person $1,400 $1,500 $1,600 $1,700 $1,800 $1,900 $2,000 $2,100 $2,200 $2.300 $2,400 $2,500 $2,700 $2,000 $2,900 $3,000 $3,100 $3.200 $3.300 $4,000 57,00 $10,000 Everyone joins the poal ad pays the necessary premum in the first year. The clams experience of the customers is faund to be generaly consstent with expeclations of the insurance company. A) What would be the premium In the third year if there is no inflation, based on the company's oxperience from the past year? B) If those customers who have anticipated…arrow_forwardAn electric utility is taking bids for the purchase, installation, and operation of decentralized battery storage systems. The table below has some details for the two bids received. a) Which is the most economical bid if the rate is 11%. None of the batteries are expected to have a salvage value after 30 years of use. (Actual expected service life is listed in the bid) b) Also solve using NPW method to compare these two mutually exclusive plans Equipment cost Installation cost Annual Inspection and Maintenance fee Annual extra income taxes Life Salvage Value Bid A $112,000 $25,000 $2,000 0 40 years 0 Bid B $98,000 $30,000 $2,000 $800 35 years 0arrow_forwardYour firm is considering which of two devices to install to reduce costs and has asked you to perform the economic analysis. Both devices have useful lives of 5 years. Device A costs $21,000, is expected to result in $7,500 savings annually, and has a salvage value of $2.000. Device B costs $19,000 and has a salvage value of $1,000. Device B will provide savings of $7,000 in the first year; however, savings will increase by $750 annually, making the second- year savings $7,750, the third-year savings $8,500, and so forth. With interest at 5%, based on equivalent uniform annual worth, which device should you recommend to your firm?arrow_forward
- A young couple planning ahead for their retirement has decided that $3 million is the amount they will need in order to retire comfortably 20 years from now. For the past 5 years, they have been able to invest one of their salaries ($50,000 per year, which includes employer contributions) while living off the other salary. They plan to start a family sometime in the next 10 years and when they will have their first child, one of the parents will quit working, causing the savings to decrease to $10,000 per year thereafter. If they have realized an average ROR of 10% per year on their investments, and expect to continue at this ROR, is reaching their goal of $3 million in 20 years sensitive to when they have their first child (i.e., between now and 10 years from now)? If so, how many years from now will they have to wait before they have their first child? Use a future worth analysis.arrow_forwardSuzy's Temporary Employee (STE) business, located in a big city, can do an online criminal background check in-house for $2.78 per search with a fixed cost of $32,000. A third-party online security firm offered to do a similar security search for $7.00 per person with an annual service contract with STE. If STE's forecast is 3,000 searches next year, should STE continue to do the search in-house or accept the third-party offer? Use the Excel template Break-Even determine the best decision. Round your answer for the breakeven quantity to the nearest whole number and round your answer for the amount of saving/loss to the nearest dollar. searches Breakeven quantity: Since the demand forecast of 3,000 searches is-Select-than the breakeven quantity, STE -Select- + outsource the work. STE -Select- + $ by outsourcing.arrow_forwardYou and your friends have decided to build a skateboard ramp behind your house. You have already purchased $500 in materials and are considering renting an electric saw.It costs $20/hr to rent an electric saw. You estimate it will take 6 hours to build the ramp. If you decide to use your saw, which is a handsaw, you will not have to pay anything to rent an electric saw, but it will take 15 hours to build the ramp. Regardless of the decision, you will need to ask for time off from your job, which pays $8/ hour.arrow_forward
- Suppose for a project the following estimates are given as: Investment cost 1,000,000 TL (Deterministic value) 150,000 TL (Most likely estimate (probabilistic value) None Net annual benefits Salvage value Annual interest rate 8% (Deterministic value) Study Period 10 years Investigate the present worth at most likely estimate, - 10% and + 10% changes in net annual benefits and determine the decision reversal point.arrow_forwardYou are requested to pick an implementation technology for your embedded product to maximize the profit. You have a competitor that will release a similar product 25 weeks from today. If the maximum expected product lifetime in the market is 50 weeks and the projected maximum number of sold units/week by the market leader is 1M units. Assume that the price is constant throughout the product lifetime ($50 USD). 'The available implementation technologies are: T1 T2 T3 NRE cost Unit cost (material and manufacturing) 100 USD Time to market 100K USD 1M USD 10M USD 5 USD 40 weeks 25 USD | 20 weeks 30 weeks a) What is the maximum revenue that might be generated for this product? b) Assuming no competition and ignoring the given max number of sold units/week, what is the max number of units sold per week to achieve the same profit from T1 and T3? Assume no competition. c) With the competition, what is the maximum profit that might be achieved if you go with T1? d) With the competition, what is…arrow_forwardYour company plans to develop a bridge of an estimated cost of 6 million dollars ($6,000,000) of estimated development time of one year. After the year, the bridge will be opened for lightweight vehicles and small trucks. The lightweight vehicles and trucks have to pay $5 and $10 toll respectively for each usage of the bridge. If 15,000 lightweight vehicles and 2,500 trucks pass the bridge in every month, in which year will the company reach break-even? Suppose your company decided to allow heavy-duty vehicles. The heavy-duty vehicles have to pay $50 in each pass and 1000 heavy-duty vehicles pass in every month. But, there is a structural fault detected that cost an additional $1,500,000 after two years of construction. In this new scenario, in which year will the company reach break-even?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Principles of Economics (12th Edition)EconomicsISBN:9780134078779Author:Karl E. Case, Ray C. Fair, Sharon E. OsterPublisher:PEARSONEngineering Economy (17th Edition)EconomicsISBN:9780134870069Author:William G. Sullivan, Elin M. Wicks, C. Patrick KoellingPublisher:PEARSON
- Principles of Economics (MindTap Course List)EconomicsISBN:9781305585126Author:N. Gregory MankiwPublisher:Cengage LearningManagerial Economics: A Problem Solving ApproachEconomicsISBN:9781337106665Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike ShorPublisher:Cengage LearningManagerial Economics & Business Strategy (Mcgraw-...EconomicsISBN:9781259290619Author:Michael Baye, Jeff PrincePublisher:McGraw-Hill Education
Principles of Economics (12th Edition)
Economics
ISBN:9780134078779
Author:Karl E. Case, Ray C. Fair, Sharon E. Oster
Publisher:PEARSON
Engineering Economy (17th Edition)
Economics
ISBN:9780134870069
Author:William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
Publisher:PEARSON
Principles of Economics (MindTap Course List)
Economics
ISBN:9781305585126
Author:N. Gregory Mankiw
Publisher:Cengage Learning
Managerial Economics: A Problem Solving Approach
Economics
ISBN:9781337106665
Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike Shor
Publisher:Cengage Learning
Managerial Economics & Business Strategy (Mcgraw-...
Economics
ISBN:9781259290619
Author:Michael Baye, Jeff Prince
Publisher:McGraw-Hill Education