Engineering Economy
16th Edition
ISBN: 9780133582819
Author: Sullivan
Publisher: DGTL BNCOM
expand_more
expand_more
format_list_bulleted
Question
Chapter 11, Problem 39FE
To determine
Profitability of the project.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Calculate the expected flow rate (barrels per day) for each oil well using the estimated probabilities. Estimated Flow, bbl/Day 100 200 300 400 Probability of Flow North well 0.15 0.75 0.10 0.0 East well 0.35 0.15 0.45 0.05
10) a) What are the probability distributions for the annual benefit and life for the following project? The annual
benefit's most likely value is $7000 with a probability of 60%. There is a 30% probability that it will be $4000, and
the highest value that is likely $9,000. A life of 6 years is twice as likely as a life of 9 years.
b) The project has a first cost of $25,000. The firm uses an interest rate of 8%. Assume that the probability
distributions for annual benefit and life are unrelated or statistically independent. Calculate the probability
distribution for the PW
c) The first cost of the project is $25,000. Use the expected values for annual benefits and life to estimate the present
worth. Use an interest rate of 8%.
d) Use the probability distribution function of the PW to calculate the EV(PW). Does this indicate an attractive
project?
F) Using the probability distribution for the PW, calculate the PW's standard deviation.
Curtis Party Rentals offers party equipment such as tents, tables, chairs, and so on for outdoor events. The rental fees average $940
per event. Curtis receives a 15 percent deposit two months before the event, 60 percent the month before, and the remainder on the
day the equipment is delivered and set up. Planners at Curtis estimate the following number of events for the last half of the current
year:
July
August
September
October
November
December
Required:
a. What are the expected revenues for Curtis Party Rentals for each month, July through December? Revenues are recorded in the
month of the event.
b. What are the expected cash receipts for each month, July through October?
330
350
400
310
270
300
Complete this question by entering your answers in the tabs below.
Required A Required B
What are the expected revenues for Curtis Party Rentals for each month, July through December? Revenues are recorded in
the month of the event.
July
August
September
October
November
December…
Chapter 11 Solutions
Engineering Economy
Ch. 11 - Prob. 1PCh. 11 - Refer to Example 11-2. Assuming gasoline costs...Ch. 11 - Prob. 3PCh. 11 - Prob. 4PCh. 11 - Prob. 5PCh. 11 - Prob. 6PCh. 11 - Prob. 7PCh. 11 - Prob. 8PCh. 11 - Prob. 9PCh. 11 - Prob. 10P
Ch. 11 - Prob. 11PCh. 11 - Prob. 12PCh. 11 - Prob. 13PCh. 11 - Prob. 14PCh. 11 - Prob. 15PCh. 11 - You have decided to purchase a new automobile with...Ch. 11 - Prob. 17PCh. 11 - Prob. 18PCh. 11 - Prob. 19PCh. 11 - A bridge is to be constructed now as part of a new...Ch. 11 - An aerodynamic three-wheeled automobile (the Dart)...Ch. 11 - Prob. 23PCh. 11 - Prob. 24SECh. 11 - Prob. 25SECh. 11 - Prob. 26SECh. 11 - Prob. 27SECh. 11 - Prob. 28SECh. 11 - Prob. 29SECh. 11 - Prob. 30FECh. 11 - Prob. 31FECh. 11 - A supermarket chain buys loaves of bread from its...Ch. 11 - A supermarket chain buys loaves of bread from its...Ch. 11 - Prob. 34FECh. 11 - Prob. 35FECh. 11 - Prob. 36FECh. 11 - Prob. 37FECh. 11 - Prob. 38FECh. 11 - Prob. 39FECh. 11 - Prob. 40FECh. 11 - Prob. 41FECh. 11 - Prob. 42FE
Knowledge Booster
Similar questions
- please needed handwrittenarrow_forwardDecisions Recognizing Riskarrow_forwardPlease show work on Excel. A new engineer is evaluating whether to use a larger diameter pipe for a water line. The pipe will cost $327,089 more initially but will reduce pumping costs. The optimistic, most likely, and pessimistic projections for annual savings are $30,000, $20,000, and $5000, with respective probabilities of 20%, 50%, and 30%. The interest rate is most likely to be 7%, but is equally likely to be 6% or 8%, and the water line should have a life of 40 years. Find the expected annual savings and the expected interest rate. Determine the Expected PW based on these. Hint: Based on the different saving and their probabilities, find the expected value of savings. Then find the expected value of the interest rate (each option has equal probability). Then find the PW using these values.arrow_forward
- Only typed answerarrow_forwardThe proposed projects have the potential uniform annual benefits and associated probability at occurrence shown below. Which project is more desirable based on these Probability data? EUAB $1,000 2,000 3,000 4,000 Project B Probability EUAB Probability 0.10 $1,500 0.20 0.30 2,500 0.40 0.40 3,500 0.30 0.20 4,500 0.10 Project Aarrow_forwardonly a,b,c,or d option no explanation Three applicants are to be selected at random out of 4 boys and 6 girls. What is the probability of selecting, at least one girl? Answer Answer Option a) 0.5 b) 0.15 d) 0.366 c) 0.636arrow_forward
- Which decision rule is most concerned with downside risk? A) Expected monetary value B) Maximax C) Maximin D) None of the abovearrow_forwardYou are considering investing in one of two projects, which have the following returns and probabilities of occurrence: (a) Compute the mean return for each project.(b) Compute the variance of return for each project.(c) Which project would you prefer, and why?arrow_forwardA company is evaluating 3 different distribution plans for a new product. The company has developed best case (60% probability) and worst case (40% probability) estimates for each plan. Results are summarized in the table below. What is the optimal decision based on the maximum expected value criterion? Worst Best Plan 1 -2 10 Plan 2 3 6 Plan 3 4 5 Prob 0.4 0.6arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Managerial Economics: A Problem Solving ApproachEconomicsISBN:9781337106665Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike ShorPublisher:Cengage Learning
Managerial Economics: A Problem Solving Approach
Economics
ISBN:9781337106665
Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike Shor
Publisher:Cengage Learning