Chapter 11, Problem 1.2Q
Summary Introduction
Case Summary:L Lumber is planning its level production
Interpretation:The minimum constant production(MCP) rate for next 6 months.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Explain the relationship between priority versus capacity that must exist within the production planning and control area of an industry.
Required information
Milford Industries provides medical equipment to oncology and surgical units in major hospitals. Milford allocates indirect
costs to five departments and redistributes the IDC for Quality Assurance and Engineering to the other three departments
monthly. The table summarizes IDC allocation and direct labor (DL) hours for one month.
Department
Production
Subassemblies
Final assembly
Quality assurance
Engineering
NOTE: This is a multi-part question. Once an answer is submitted, you will be unable to return to this part.
Determine the IDC redistribution for each of the three departments.
The IDC redistribution is as follows:
Production = $ 54.54
Subassemblies = $
IDC Allocation, $
30,000
20,000
10,000
8,500
26,000
Final assembly = $
36.36
Actual DL Hours
550
1050
650
18.18
Please help with this
Thanks
Chapter 11 Solutions
Practical Operations Management
Ch. 11 - Prob. 1DQCh. 11 - Prob. 2DQCh. 11 - Prob. 3DQCh. 11 - Prob. 4DQCh. 11 - Prob. 1PCh. 11 - Prob. 2PCh. 11 - Prob. 3PCh. 11 - Prob. 4PCh. 11 - Prob. 5PCh. 11 - Prob. 6P
Ch. 11 - Prob. 7PCh. 11 - Prob. 8PCh. 11 - Prob. 9PCh. 11 - Prob. 10PCh. 11 - Prob. 11PCh. 11 - Prob. 12PCh. 11 - Prob. 13PCh. 11 - Prob. 14PCh. 11 - Prob. 15PCh. 11 - Prob. 16PCh. 11 - Prob. 17PCh. 11 - Prob. 18PCh. 11 - Prob. 19PCh. 11 - Prob. 20PCh. 11 - Prob. 21PCh. 11 - Prob. 22PCh. 11 - Prob. 23PCh. 11 - Prob. 24PCh. 11 - Prob. 25PCh. 11 - Prob. 26PCh. 11 - Prob. 27PCh. 11 - Prob. 28PCh. 11 - Prob. 29PCh. 11 - Prob. 30PCh. 11 - Prob. 31PCh. 11 - Prob. 32PCh. 11 - Prob. 33PCh. 11 - Prob. 34PCh. 11 - Prob. 1.1QCh. 11 - Prob. 1.2QCh. 11 - Prob. 1.3QCh. 11 - Prob. 2.2Q
Knowledge Booster
Similar questions
- Tots Toys makes a plastic tricycle that is composed of three major components: a handlebar-front wheel-pedal assembly, a seat and frame unit, and rear wheels. Please note that each tricycle requires two rear wheels, the front wheel is included in the front wheel-pedal assembly. The company has orders for 15,000 of these tricycles. Current schedules yield the following information: component plastic time space cost to manufacture cost to purchase front 2 11 2 7 11 seat/frame 3 7 2 6 10 rear 0.5 2.5 0.2 2 5 available 60000 180000 35000 Develop a linear programming model to tell the company how many of each component should be manufactured and how many should be purchased in order to provide 15,000 fully completed tricycles at the minimum cost. Use Excel's Solver to obtain the optimal solution. How many of each component should be manufactured vs. purchased? What is the overall cost? What are the binding constraints? Upload a screenshot of the spreadsheet that you used…arrow_forwardTots Toys makes a plastic tricycle that is composed of three major components: a handlebar-front wheel-pedal assembly, a seat and frame unit, and rear wheels. Please note that each tricycle requires two rear wheels, the front wheel is included in the front wheel-pedal assembly. The company has orders for 15,000 of these tricycles. Current schedules yield the following information: component plastic time space cost to manufacture cost to purchase front 2 11 2 7 11 seat/frame 3 7 2 6 10 rear 0.5 2.5 0.2 2 5 available 60000 180000 35000 The company obviously does not have the resources available to manufacture everything needed for the completion of 15,000 tricycles so has gathered purchase information for each component. Develop a linear programming model to tell the company how many of each component should be manufactured and how many should be purchased in order to provide 15,000 fully completed tricycles at the minimum cost. (state the objective function, decision…arrow_forwardConsuelo Chua, Inc., is a Columbian disk drive manufacturer in need of an aggregate plan for July through December. The company has gathered the following data. There are 8 hours of production per day. Holding cost Subcontracting Regular-time labor Overtime labor Hiring cost Layoff cost Costs $8/disk drive/Month $80/disk drive Month $12/hour $18/hour (above 8 hours) $40/worker $80/worker 0 June 1 July 2 August 3 September 4 October 5 November 6 Doramhar What will each of the two following strategies cost? a) Vary the workforce so that production approximates demand. Chua had eight workers on board in June. (Enter all responses as whole numbers). Demand* Fill in the table below. (Enter all responses as whole numbers. In the hire/layoff column, use positive numbers for hires-plus signs omitted; negative numbers for layoffs.) 400 500 550 700 800 700 Current workforce (June) Labor-hours/disk drive Workdays/month Beginning Inventory 150 Other Data 20 days Beginning Inventory 150 disk…arrow_forward
- Define "what-if analysis." How can a spreadsheet be used to plan capacity?arrow_forwardBriefly explain what is mean by float/slack?arrow_forwardRipeka, the warehouse manager at Hine would like to update the company’s inventory locator system so that the picking operation can be streamlined. While conceptually simple to do, she knows that there will be several steps to the update process that will have to be carefully managed. She needs to complete upgrade and train her staff in operating the new system before the busy season, which is only 4 months away. She identifies the various activities, expected time duration, predecessors and costs, as shown in the table. Identify the project cost. Ripeka is interested to complete the project three weeks early before starting the busy season. How much additional cost the project will incur for completing the project three weeks early?arrow_forward
- Ripeka, the warehouse manager at Hine would like to update the company’s inventory locator system so that the picking operation can be streamlined. While conceptually simple to do, she knows that there will be several steps to the update process that will have to be carefully managed. She needs to complete upgrade and train her staff in operating the new system before the busy season, which is only 4 months away. She identifies the various activities, expected time duration, predecessors and costs, as shown in the table. Draw the AON Network, and then determine the critical path. [Show your workings, using the grid network.] Identify the project duration – is this project feasible within the required timeframe?arrow_forwardThe table given below shows a partially completed MPS record for product A. What is the remaining ATP inventory (discrete) for week 7 after the company receives a 20 units of customer order for week 6? Order policy: 60 units Lead time: 1 week Item: A Quantity on hand: 30 Week 3 30 7. 34 11 4. Forecast requirements Customer orders (booked) Projected on-hand inventory MPS quantity MPS start ATP inventory 22 24 18 27 36 28 26 12 24 O a 59 Ob. 29 OcO Od. 49 Oe. 39arrow_forwardList and briefly discuss four techniques used to control labor as part of aggregate planning in the service industry.arrow_forward
- Problem 9-11 (Algo) Assume that Product Z is made of two units of A and three units of B. A is made of three units of C and four of D. D is made of two units of E. Lead times for purchase or fabrication of each unit to final assembly are: Z takes two weeks; A, B, C, and D take one week each; and E takes three weeks. Fifty five units of Product Z are required in Period 10. (Assume that there is currently no inventory on-hand of any of these items.) b. Develop an MRP planning schedule showing gross and net requirements and order release and order receipt dates. (Leave the cells blank, whenever zero (0) is required.) Item: Z OH: 0 LT: 2 SS: 0 Q: L4L Item: A OH: 0 LT: 1 SS: 0 Q: L4L Item: B OH: 0 LT: 1 SS: 0 Q: L4L Period: Gross requirements Scheduled receipts Projected available balance Net requirements Planned order receipts Planned order releases Gross requirements Scheduled receipts Projected available balance Net requirements Planned order receipts Planned order releases Gross…arrow_forwardJAYB, manager of a Fabrication company, has the following aggregate demand requirements and other data for the upcoming four quarters. Table 5: Forecast and cost information [Jadual 5: Maklumat Ramalan dan kos] Quarter [Suku] Demand [Permintaan] Previous quarter's output [Keluaran suku sebelumnya] 1,500 units 1 1,400 Beginning inventory [Inventori awal] 200 units 2 1,000 Hiring workers [Pengambilan pekerja] RM6 per unit 3 1,500 Laying off workers [Pembuangan pekerja] RM11 per unit 4 1,300 Unit cost [Kos unit] RM30 per unit With the information given, JAYB wants you to calculate the total cost of using chase strategy by hiring and layoff workers.arrow_forwardSunspot Beverages, Ltd., of Fiji uses the weighted-average method in its process costing system. It makes blended tropical fruit drinks in two stages. Fruit juices are extracted from fresh fruits and then blended in the Blending Department. The blended juices are then bottled and packed for shipping In the Bottling Department. The following Information pertalns to the operations of the Blending Department for June. Percent Completed Materials Conversion Work in process, beginning Started into production Completed and transferred out Work in process, ending Units 104,000 494,500 484,500 114,000 70% 40% 75% 25% Materials Conversion Work in process, beginning Cost added during June $ 44,300 S 16,300 $ 474,400 $ 347,930 Requlred: 1. Calculate the Blending Department's equivalent units of production for materials and conversion in June. 2. Calculate the Blending Department's cost per equivalent unit for materials and conversion in June. 3. Calculate the Blending Department's cost of ending…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,