
EBK MATERIALS FOR CIVIL AND CONSTRUCTIO
4th Edition
ISBN: 8220102719569
Author: ZANIEWSKI
Publisher: PEARSON
expand_more
expand_more
format_list_bulleted
Question
Chapter 11, Problem 11.3QP
To determine
Define microscopic composites and what are the two phases of microscopic composites.
Expert Solution & Answer

Want to see the full answer?
Check out a sample textbook solution
Students have asked these similar questions
. For the cast-iron piping shown in Fig. 4, calculate the flow rate if H = 8 m. (e=0.26
mm, v=1.0×10m²/s)
Include all losses.)
2 m
Water
H
20°C
20 m
40 m
T
2 cm dia.
4 cm dia.
Angle valve
(wide open) (4.7)'
A5.2- A simply supported beam with the given cross-section, as shown in Figure 2, is subjected to
factored uniform load of 50 kN/m. The designer would like to cut-off 2-30M bars where they are no
longer required by the design.
Determine the cut-off point for 2-30M bars according to CSA 23.3 requirements.
Given: Concrete: Normal density with f'c = 30 MPa
Reinforcement: Uncoated rebars with fy = 400 MPa
Shear reinforcement is in excess of CSA 23.3 minimum requirement: 10M
Clear cover to the stirrups: 40 mm
Columns: 500 mm x 500 mm
9 m
W= 50 kN/m
Figure 2
h=600 mm
b=500 mm
Cross-section
As = 5-30M
1. Calculate the ultimate load carrying capacity of the pile tip driven into the soil profile shown
below:
G.W.T.
45'
Qapp
Soft Clay:
Ysat 100 pcf
Cu 500 psf, ou = 0°
平
12' Soil
Plug
Driven Steel Pipe Pile:
Outside Diameter = 2'
Inside Diameter = 1'11"
Hollow (soil plugged)
Note: Pile & soil profile
are not drawn to scale
Qp = ?
Please perform the tip capacity calculation two ways: For the first approach, assume that the
total vertical stress at the pile tip is balanced by the weight of the pile. For the second
approach, assume that the total vertical stress at the pile tip is not balanced by the weight of
the pile (which means you need to include the vertical total stress term). Please compare
your answers from these two analyses, examine some of your intermediate-stage calculation
results such as the total overburden stress at the pile tip relative to the weight of the pile, and
discuss whether or not the commonly used assumption about the total vertical stress at the
pile tip is a…
Chapter 11 Solutions
EBK MATERIALS FOR CIVIL AND CONSTRUCTIO
Ch. 11 - Prob. 11.1QPCh. 11 - Prob. 11.2QPCh. 11 - Prob. 11.3QPCh. 11 - Prob. 11.4QPCh. 11 - Prob. 11.5QPCh. 11 - Prob. 11.6QPCh. 11 - Prob. 11.7QPCh. 11 - Prob. 11.8QPCh. 11 - Prob. 11.9QPCh. 11 - What are the functions of aggregate used in...
Ch. 11 - Prob. 11.11QPCh. 11 - Prob. 11.12QPCh. 11 - What are the benefits of adding dispersed steel...Ch. 11 - Getting measurements from Figure 11.20, determine...Ch. 11 - Three 6 in. 12 in. concrete cylinders with...Ch. 11 - Prob. 11.16QPCh. 11 - Prob. 11.17QPCh. 11 - Prob. 11.18QPCh. 11 - Prob. 11.19QPCh. 11 - Prob. 11.20QPCh. 11 - Prob. 11.21QPCh. 11 - Prob. 11.22QPCh. 11 - Prob. 11.23QPCh. 11 - Prob. 11.24QPCh. 11 - Prob. 11.25QPCh. 11 - Prob. 11.26QPCh. 11 - Prob. 11.27QPCh. 11 - Prob. 11.28QPCh. 11 - Prob. 11.29QPCh. 11 - Prob. 11.30QPCh. 11 - A circular FRP composite rod with continuous and...
Knowledge Booster
Similar questions
- A6.2- Given a simply supported beam with the typical cross-section as shown in the figure below. Assume interior exposure for this beam. The beam properties are summarized below. a) Check if the beam section satisfies the CSA A23.3 cracking control requirements. In your calculations, find f, accurately based on the loading, and compare the results with f = 0.6 fy. b) Find the deflection due to DL+LL at mid-span after 6 years. Given: Concrete: Normal density with f'c = 25 MPa Reinforcement: Uncoated rebars with fy = 400 MPa Shear reinforcement: 10M Maximum aggregate size: 20 mm Clear cover to the stirrup: 30 mm Clear spacing between the bars = 35 mm 35 mm 30 mm m WDL= 20 kN/m WLL= 15 kN/m 抖抖 b=400 mm As = 8-25M Cross-section h=500 mmarrow_forwardA5.1- An unbraced column shown in Figure 1, column A-B with square cross-section is given. The column is subjected to Dead load (unfactored): PDL = 3000 kN, MDL-top = 85 kN.m, MDL-bo = -DL-bottom = 100 kN.m. = Assume the cross-section of column is constant from top to bottom, and all the beams have width = 300 mm and height 350 mm. Using f'c = 25 MPa, fy = 400 MPa, design the column and determine the ties spacing and arrangement. Use 25M or 30M bars for longitudinal reinforcement, and 10M bars for ties. Assume clear cover to be 40mm. The design p has to be between 0.01 and 0.02. Column maximum dimension can be 500mm. т 4.0m 7.0m 5.5m + 6.5m Figure 1 Barrow_forward7.43 Neglecting head losses, determine what horsepower the pump must deliver to produce the flow as shown. Here, the elevations at points A, B, C, and D are 124 ft, 161 ft, 110 ft, and 90 ft, respectively. The nozzle area is 0.10 ft². B Nozzle Water C D Problem 7.43arrow_forward
- NOTE: Use areal methods only for V,M,N diagrams(Do NOT use the equations) (also draw the N diagram(s) for the entire structure)arrow_forwardNOTE: Use areal methods only for V,M,N diagrams(Do NOT use the equations) (also draw the N diagram(s) for the entire structure)arrow_forwardNOTE: Use areal methods only for V,M,N diagrams(Do NOT use the equations) (also draw the N diagram(s) for the entire structure)arrow_forward
- NOTE: Use areal methods only for V,M,N diagrams(Do NOT use the equations) (also draw the N diagram(s) for the entire structure)arrow_forwardNOTE: Use areal methods only for V,M,N diagrams(Do NOT use the equations) (also draw the N diagram(s) for the entire structure)arrow_forwardNOTE: Use areal methods only for V,M,N diagrams(Do NOT use the equations) (also draw the N diagram(s) for the entire structure)arrow_forward
- Problem 2: Use the table below to compute the coordinates of the centroid of area shown below. y – 3 in.—|— 4 in. - -3 3 in. 3 in. x Area X X * Area y Y * Area Component (in²) (in) (in³) (in) (in³) Square 1 Rectangle 2 Triangle 3 Rectangle 4 Σarrow_forwardA shallow foundation measuring 1 m × 2 m in plan is to be constructed over a normally consolidated sand layer. Given: D₁ = 1 m, №60 increases with depth, N 60 (in the depth of stress influence) = 11, Estimate the elastic settlement using Burland and Burbidge's method. (Enter your answer to three significant figures.) Se mm and Inet = 138 kN/m².arrow_forwardA continuous foundation on a deposit of sand layer is shown in the figure below along with the variation of the cone penetration resistance qc 1.5 m 0 2.5 m Sand 14 q= 195 kN/m² qe (kN/m²) 9 1750 93450 9c=2900 Depth (m) Assuming = 16 kN/m² and creep is at the end of ten years after construction, calculate the elastic settlement of the foundation using the strain influence factor method. Use the equations 22 Iz Es 0 | Se = C₁C2 (9) Az and Es = 3.5qc (for L/B> 10) (Enter your answer to three significant figures.) Se = mmarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Materials Science And Engineering PropertiesCivil EngineeringISBN:9781111988609Author:Charles GilmorePublisher:Cengage LearningConstruction Materials, Methods and Techniques (M...Civil EngineeringISBN:9781305086272Author:William P. Spence, Eva KultermannPublisher:Cengage LearningFundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,
- Engineering Fundamentals: An Introduction to Engi...Civil EngineeringISBN:9781305084766Author:Saeed MoaveniPublisher:Cengage LearningTraffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage LearningSolid Waste EngineeringCivil EngineeringISBN:9781305635203Author:Worrell, William A.Publisher:Cengage Learning,

Materials Science And Engineering Properties
Civil Engineering
ISBN:9781111988609
Author:Charles Gilmore
Publisher:Cengage Learning

Construction Materials, Methods and Techniques (M...
Civil Engineering
ISBN:9781305086272
Author:William P. Spence, Eva Kultermann
Publisher:Cengage Learning

Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,

Engineering Fundamentals: An Introduction to Engi...
Civil Engineering
ISBN:9781305084766
Author:Saeed Moaveni
Publisher:Cengage Learning

Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning

Solid Waste Engineering
Civil Engineering
ISBN:9781305635203
Author:Worrell, William A.
Publisher:Cengage Learning,