A potato chip is a delicate thing Fragile A pound of pressure will crush it So when you’re making potato chips you need to have a system If you aren't careful instead of potato chips, you’ll end up with potato chip crumbs.
The Jays company in Chicago was a producer of a variety of snack products one of which was potato chips The company is now owned by Snyders. Nonetheless there is much to be learned from a description of Jay’s operations.
To avoid the tendency of potato chips to crush into crumbs Jays used a system of conveyor belts, radial filling chutes and gently vibrating slides where masses of chips a yard deep were gently moved through the process.
The process started with the arrival of semi-trailers full of potatoes usually about a dozen a day.
The potatoes were separated into big and small sizes big potatoes for big chips that go into large bags and small potatoes for small chips for lunch-size bags.
Computers keep track of everything, shunting potatoes to 15 000-pound holding bins Each bin feeds into a pipe containing a turning screw—a version of the ancient Archimedes screw used to pump water-that moves the potatoes from the bin to conveyor belts, to where they are washed and skinned—the skin scrubbed off by metal bristle brushes.
No machine can detect if a potato is rotten inside So a pair of human inspectors gave the potatoes a quick squeeze as they moved along a conveyor and removed those likely to have rot.
The cleaned potatoes were sent into high-speed chippers—spinning brass rings, each with eight blades inside straight blades for straight chips, ripple blades for ripple chips.
The blades cut the potatoes but cutting dulled the blades so every three hours the line had to be stopped so that the blades could be replaced.
The raw chips spent three minutes cooking in hot com oil, when was constantly circulated and filtered Then they were salted and any flavorings such as barbecue were added.
After the chips were fried, there was another quality check, in which workers removed burned and deformed chips out of the masses passing by.
The chips also were laser-inspected Chips with dark spots or holes were removed by a puff of air that knocked them off the line into a discard bin.
The discards-about 3 percent of production-were gathered up and used Starch was drawn out and sold to cornstarch makers, the rest went to hog feed.
Getting the chips in the bags was another challenge. You can't just fill up bags and seal them, the chips would be smashed. Rather, a conveyor poured chips-gently-onto the central hub of a large, wheel-like device, where the chips scattered into 15 buckets that were essentially scales A computer monitored the weight of each bucket to assure there would be just the right amount to fill a 14-ounce bag The bags were packed into boxes that read 'HANDLE LIKE EGGS.’
While not exactly perishable, potato chips do have a shelf life of about eight weeks only one day of which is spent at the plant.
Do you feel that Jays is overdoing it with its concern for quality? Explain.
Want to see the full answer?
Check out a sample textbook solutionChapter 10 Solutions
EBK OPERATIONS MANAGEMENT
- I need to forecast using a 3-Period-Moving-Average-Monthly forecasting model which I did but then I need to use my forecast numbers to generate a Master Production Schedule (MPS) I have to Start with actual sales (my own test data numbers) for August-2022 Oct-2022 i need to create MPS to supply demand starting November-2022 April 2023 I just added numbers without applying formulas to the mps on the right side of the spreadsheet because I do not know how to do it. The second image is the example of what it should look like. Thank You.arrow_forwardSolve the following Question 1. How do volume and variety affect the process selection and layout types? Discuss 2. How is the human resource aspect important to operation function? Discuss 3. Discuss the supply network design and its impact on the overall performance of the organization.arrow_forwardHelp with question?arrow_forward
- What are some good examples of bullet points on a resume for a Christian Elementary School?arrow_forwardWhat is an example of a cover letter for a Christian School Long-Term Substitute Teaching position?arrow_forwardThe supply chain is a conventional notion, but organizations are only really interested in making products that they can sell to customers. Provided they have reliable supplies of materials and reasonable transport for finished products, logistics is irrelevant. Do you think this is true? If yes, explain, and if no, clearly explain as well.arrow_forward
- working as a program operations managerarrow_forward12 X1, X230 1 x =0x2 write the Following linear Programming model by 1- general Form Canonical Forms Canonical formY 2- Standard Form Max Z=35X+ 4 X 2 +6 X3 ST. X+2X2-5x3 = 40 3X, + 6X2 + 7x 3 = 30 7x, +lox2 x3 = 50 X3 X 2 X 3 <0arrow_forwarda/ a Minimum cost assign each worker for one job at Jobs J1 12 33 WI 2 4 6 W2 5 W3 5 33 6 7arrow_forward
- وبة واضافة هذه القيمة الى القيم Ex: Assign each job for each worker at minimum total Cost عمل لكل عامل وبأقل كلفة ممكنة obs الأعمال Workors العمال J1 J2 J3 J4 W₁ 15 13 14 12 W2 11 12 15 13 W3 13 12 10 11 W4 15 17 14 16arrow_forwardThe average completion time (flow time) for the sequence developed using the FCFS rule = 11.75 days (round your response to two decimal places). The percentage utilization for the sequence developed using the FCFS rule = 42.55 % (enter your response as a percentage rounded to two decimal places). b) Using the SPT (shortest processing time) decision rule for sequencing the jobs, the order is (to resolve a tie, use the order in which the jobs were received): An Alabama lumberyard has four jobs on order, as shown in the following table. Today is day 205 on the yard's schedule. In what sequence would the jobs be ranked according to the decision rules on the left: Job Due Date A 212 B 209 C 208 D 210 Duration (days) 6 3 3 8 Sequence 1 Job B 2 3 4 A D The average tardiness (job lateness) for the sequence developed using the SPT rule = 5.00 days (round your response to two decimal places). The average completion time (flow time) for the sequence developed using the SPT rule = 10.25 days…arrow_forwardWith the aid of examples, fully discuss any five (5) political tactics used in organisations.arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.