Concept explainers
a
Interpretation: Plan for employment which has mixed strategy and has the low cost is to be proposed.
Concept Introduction:
Mixed strategy plans are made in which both permanent and temporary employees are enrolled. This is one to minimize the overall cost of hiring.
b
Interpretation: Advantages and disadvantages of having both permanent and temporary employees are to be discussed.
Concept Introduction:
Permanent employees are those who work for full time, have governmental rights for their protection and work till retirement.
Temporary employees are those who are hired for some specific project or task and leaves the firm when work is done.
Want to see the full answer?
Check out a sample textbook solutionChapter 10 Solutions
MyLab Operations Management with Pearson eText -- Access Card -- for Operations Management: Processes and Supply Chains
- Charles Lackey operates a bakery in Idaho Falls,Idaho. Because of its excellent product and excellent location,demand has increased by 25% in the last year. On far too manyoccasions, customers have not been able to purchase the bread oftheir choice. Because of the size of the store, no new ovens can beadded. At a staff meeting, one employee suggested ways to loadthe ovens differently so that more loaves of bread can be baked atone time. This new process will require that the ovens be loadedby hand, requiring additional manpower. This is the only thingto be changed. If the bakery makes 1,500 loaves per month witha labor productivity of 2.344 loaves per labor-hour, how manyworkers will Lackey need to add? (Hint: Each worker works160 hours per month.)arrow_forward1. Nasrin, Rashed and Tahmid run a Chocolate manufacturing company. Their productionruns 30-hour per week and they pay $6 per hour to their labors. Material cost is $3.5 per lbs.Machine productivity is 2.5 times weekly labor cost. Overhead is $300 per week. The weeklyproductivity figures are given below:Weeks Output (Units) Labors Material (lbs)1 1400 8 362 1500 9 343 1250 6 334 1300 7 35 a) Compute multi-factor productivity of machine and material for each of the monthsshown for their Chocolate manufacturing firm.b) Compute multi-factor productivity of Labor and Overhead for each of the months shownfor their Chocolate manufacturing firm.c) Compute total productivity measure for each of the months shown for their Chocolatemanufacturing firm.d) What do the productivity figures suggest? undefinedarrow_forwardMajor Ltd is a company that produces household goods in various departments. It needs to assess whether the hourly recovery tariff has been calculated correctly.The following information is provided for Martina who is an employee of Major Ltd:She works from Monday – Friday (8 hours per day for 5 days). The rate per hour in this company is R75. Holiday bonus equals to 10% of yearly gross salary. The employer makes the following contributions: Pension fund = R1000 per week Medical aid = R400 per week Other contributions = 5 % of yearly gross salaryHoliday leave is 3 weeks annually. The company is closed for 10 public holidays and idle time is 5%.Required:Calculate the hourly recovery tariff. Assume that there are 52 weeks in a year. Note: round off all unit costs to TWO decimal places. Show ALL calculations.arrow_forward
- Barry’s Brakes is looking to hire workers to assemble the brake assemblies it produces. Barry has estimated total output of these workers can produce, see the table below. Barry will sell each brake assembly for $200 but the parts cost $160 for each assembly. Number of Workers Total Output (per day) 1 15 2 28 3 38 4 43 The hourly wage for factory workers is $275 per day. How many workers should the factory manager hire ?arrow_forwardLillian Fok is president of Lakefront Manufacturing, a producer of bicycle tires. Fok makes 1,000 tires per day with the following resources: Labor: 400 hours per day @ $12.50 per hour 20,000 pounds per day @ $1.00 per pound $5,000 per day $10,000 per day Raw Material: Energy: Capital: Labor productivity per labor hour for these tires = tires/labor hour (round your response to two decimal places).arrow_forwardA company evaluate its hiring cost is RM150 per worker and layoff cost is RM200 per worker. Currently the company has 20 workers and based on forecast demand, the actual workers required to meet January demand is 25 workers. Calculate the hiring cost or layoff cost for that month. * O RM750 O RM350 O RM250 O RM1,000arrow_forward
- Pls help with this homework.arrow_forwardSubject: acountingarrow_forwardKelsie Corporation is using a predetermined overhead rate that was based on estimated total fixed manufacturing overhead of $510,000 and 30,000 machine-hours for the period. The company incurred actual total fixed manufacturing overhead of $517,000 and 27,000 total machine-hours during the period. The amount of manufacturing overhead that would have been applied to all jobs during the period is closest to: Select one: O a. $459,000 O b. $574,444 O c. $17 Od. $19.15arrow_forward
- 1. The RitePak company produces packing boxes for the food industry. Old production system allowed the company to make 600 boxes per day (in one 8-hour shift). The company has recently introduced a new production system and conducted appropriate job training, so that production levels have increased to 750 boxes per day (in one 8-hour shift). Labor costs remain the same and average $120 per day for each of the 5 full-time workers. Capital costs were previously $3,000 per day, and increased to $3,200 per day with the new equipment. Energy costs were unchanged at $700 per day. Please compute the firm’s labor productivity and multifactor productivity before and after the changes. Write your final answer in the table below. Show work, and use 2-decimal accuracy when necessary. Note:- Do not provide handwritten solution. Maintain accuracy and quality in your answer. Take care of plagiarism. Answer completely. You will get up vote for sure.arrow_forwardA manufacturing company makes two types of water skis, a trick ski and a slalom ski. The relevant manufacturing data are given in the table. Labor-Hours per Ski Department Fabricating Finishing Answer parts (A), (B), and (C) below. Trick Ski 12 1 Slalom Ski 8 1 Maximum Labor-Hours Available per Day 480 48 (A) If the profit on a trick ski is $40 and the profit on a slalom ski is $30, how many of each type of ski should be manufactured each day to realize a maximum profit? What is the maximum profit? The maximum profit is $ The maximum occurs when trick skis and slalom skis are produced.arrow_forwardHickory Manufacturing Company forecasts the following demand for a product (in thousands of units) over the next five years. 1 2 3 4 5 86 90 Year Forecast demand Currently the manufacturer has seven machines that operate on a two-shift (eight hours each) basis. Thirty days per year are available for scheduled maintenance of equipment with no process output. Assume there are 250 workdays in a year. Each manufactured good takes 20 minutes to produce. a. What is the effective capacity of the factory? Round your answer down to the nearest whole number. units, year b. Given the five-year forecast, how much extra capacity is needed each year? Use a minus sign to enter an answer, if there is excess capacity, Round your answers to the nearest whole number. Year 1 Additional machines needed 2 1 24 Extra capacity needed (units) C. Does the firm need to buy more machines? If so, how many? When? If your answer is zero, enter "0". Round your answers up to the nearest whole number. 4 3 4 5 PEarrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.