To determine: The capability index for the process and their respective capability.
Introduction:
Process capability index is the measure of the capacity of a process which is the measure of ability of the process to produce the required output within specified limits.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
BlueMoon Bottlers has a bottle-filling process with a mean value of 64 ounces and a standard deviation of 8 ounces. Suppose the upper and lower specification limits are 71 and 57 ounces, respectively. What is the process capability index of this process? (Note: You MUST show every single step and detailed derivation for full credit)
Abernathy, Inc., produces two different generators and is concerned about their quality. The company has identified the following quality activities and costs associated with the two products:
Generator A
Generator B
Units produced
170,000
340,000
Warranty work (units)
1,700
850
Scrapped units (number)
3,400
850
Inspection (hours)
3,400
1,700
Quality training (hours)
85
85
Activities:
Performing warranty work
$816,000
Scrapping units
612,000
Inspecting
306,000
Quality training
85,000
Required:
1. Calculate the quality cost per unit for each product, and break this unit cost into quality cost categories. If required, round your answers to the nearest cent.
Generator A
Generator B
Unit cost
$fill in the blank 1
$fill in the blank 2
SCENARIO A:
A woodcutting operation has a target (nominal) value of 200 inches and consistently averages 200.1 inches with a standard deviation of .05 inches. The design engineers have established an upper specification limit of 200.25 and a lower specification limit of 199.75 inches.
The process capability ratio, Cp, of the operation is:
Group of answer choices
a Less than 1
b Greater than or equal to 1 but less than 1.25
c Greater than or equal to 1.25 but less than 1.5
d Greater than or equal to 1.5 but less than 1.75
e Greater than or equal to 1.75 but less than 2
f Greater than or equal to 2
Chapter 10 Solutions
OPERATIONS MANAGEMENT CONNECT AC
Ch. 10.2 - Prob. 1.1RQCh. 10.2 - Prob. 1.2RQCh. 10.4 - Prob. 1.1RQCh. 10.4 - Prob. 1.2RQCh. 10 - Prob. 1DRQCh. 10 - Prob. 2DRQCh. 10 - Prob. 3DRQCh. 10 - Prob. 4DRQCh. 10 - Prob. 5DRQCh. 10 - Prob. 6DRQ
Ch. 10 - Prob. 7DRQCh. 10 - Prob. 8DRQCh. 10 - Prob. 9DRQCh. 10 - Prob. 10DRQCh. 10 - Prob. 11DRQCh. 10 - Prob. 12DRQCh. 10 - Prob. 13DRQCh. 10 - Prob. 14DRQCh. 10 - Prob. 15DRQCh. 10 - Prob. 16DRQCh. 10 - Prob. 1TSCh. 10 - Prob. 2TSCh. 10 - Prob. 3TSCh. 10 - Prob. 1CTECh. 10 - Prob. 2CTECh. 10 - Prob. 3CTECh. 10 - Prob. 4CTECh. 10 - Prob. 1PCh. 10 - Prob. 2PCh. 10 - Prob. 3PCh. 10 - Prob. 4PCh. 10 - Prob. 5PCh. 10 - Prob. 6PCh. 10 - Prob. 7PCh. 10 - Prob. 8PCh. 10 - Prob. 9PCh. 10 - Prob. 10PCh. 10 - Prob. 11PCh. 10 - Prob. 12PCh. 10 - Prob. 13PCh. 10 - Prob. 14PCh. 10 - Prob. 15PCh. 10 - Prob. 16PCh. 10 - Prob. 17PCh. 10 - A production process consists of a three-step...Ch. 10 - Prob. 19PCh. 10 - Prob. 20PCh. 10 - Prob. 21PCh. 10 - Prob. 22PCh. 10 - Prob. 23PCh. 10 - Prob. 24PCh. 10 - Prob. 25PCh. 10 - Prob. 26PCh. 10 - Prob. 27PCh. 10 - Prob. 28PCh. 10 - Prob. 29PCh. 10 - Prob. 1.1CQCh. 10 - Prob. 2.1CQCh. 10 - Prob. 2.2CQCh. 10 - Prob. 2.3CQCh. 10 - Prob. 2.4CQ
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Consider the process of filling prescriptions at two pharmacy locations. Over the past year, 2,500 prescriptions were filled at the first location, and 3,000 prescriptions were filled at the second location. Quality is measured by the proper medication being dispensed. In 12 instances at the first location and 15 instances at the second location, the incorrect medication was given. Calculate the dpmo and its corresponding sigma level for this processarrow_forwardHow might the new Sheraton Service Promise process help Starwoodavoid the four costs of poor process performance and quality(prevention, appraisal, internal failure, and external failure)?arrow_forwardA defense contractor manufactures rifles for the military. The military has exacting quality standards that the con-tractor must meet. The military is very pleased with the quality of the products provided by the contractor andrarely has to return products or has reason for complaint.However, the contractor is experiencing extremely high quality-related costs. Speculate on the reasons for the con-tractor’s high quality-related costs.arrow_forward
- Mundela Company produces glass boards. Recently the company received many complaints from its customers. The customers are not happy with the glass boards as they were inconsistent. The customers relationship manager discussed the issue with the quality control manager to figure out the cause of the inconsistency of the product. Prior to defining the cause, the quality control manger decided with his team to go through the process and make sure if they are under control. Out of 10 process, three processes have been selected for inspection. Process Three: Packaging In this process the quality controller selects randomly group of boxes and make sure if the box confims to the standards or not. The collected data is presented in the table below Number Number Number Number of Boxes confirms the of Boxes confirms the of Boxes confirms the of Boxes Number confirms of Boxes Selected Standards Sample Number Number Number of Boxes Selected of Boxes Selected Standards of Boxes the Selected…arrow_forwardA quality control scheme is in operation for a process producing ball-bearings. Samples of 6 bearings are taken every hour and bearing diameters are measured. The mean diameter delivers is 2 cm with standard deviation of 0.002 cm. To bearing diameter specification is within the range of 1.998cm to 2.002cm. a. Calculate the process capability for the ball bearings production process . b. Suggest two proposal to improve the process capability. c. What value of standard deviation will deliver a six sigma process ?arrow_forwardIn response to intensive foreign competition, the management of Florex Company has attempted over the past year to improve the quality of its products. A statistical process control system has been installed and other steps have been taken to decrease the amount of warranty and other field costs, which have been trending upward over the past several years. Costs relating to quality and quality control over the last two years are given below: Costs (in thousands) Last Year This Year Inspection $ 720 $ 909 Quality engineering $ 450 $ 765 Depreciation of test equipment $ 675 $ 270 Rework labor $ 1,080 $ 1,530 Statistical process control $ 0 $ 225 Cost of field servicing $ 1,350 $ 1,260 Supplies used in testing $ 45 $ 81 Systems development $ 720 $ 900 Warranty repairs $ 3,780 $ 1,620 Net cost of scrap $ 630 $ 1,170 Product testing $ 900 $ 1,800 Product recalls $ 3,150 $ 900 Disposal of defective products $ 810 $ 1,080 Sales have been flat over the…arrow_forward
- Isidel the below Causal diagram: D Which variables must necessarily be controlled for to identify the effect of X on Y? Do not select variables to control for unless they are necessary to identify effect. OB O It's not possible to identify the effect of X on Y OYarrow_forwardSam’s Long Life 60-watt light bulbs are designed to have a life of 1,350 hours with tolerance of ± 340 hours. A recent representative sample from the process that makes these light bulbs revealed a mean of 1,290 hours, with a standard deviation of 94 hours. Compute a. Compute the process capability ratio and the process capability index, and comment on the overall capability of the process b. Explain to what extent the process for producing Sam’s Long Life 60-watt light bulbs would have to be improved to achieve 4-sigma quality. c. show detail workarrow_forwardWhat two basic assumptions must be satisfied in order to use a process capability index?arrow_forward
- A new industrial oven has just been installed at the Piatt Bakery. To develop experience regarding the oven temperature, an inspector reads the temperature at four different places inside the oven each half hour. 8:00 am 350 350 355330 9:00 am 344 342 338340 10:00 am 341 345 347 350 Lower and upper limits, respectively, for S-chart are: O a. O and 13.18 O b. O and 10.68 O c. 13.18 and 0 O d. O and 10.10 O e. None of themarrow_forwardBoston Electric Generators has been getting many complaints from its major customer, Home Station, about the quality of its shipments of home generators. Daniel Shimshak, the plant manager, is alarmed that a customer is providing him with the only information the company has on shipment quality. He decides to collect information on defective shipments through a form he has asked his drivers to complete on arrival at customers' stores. The forms for the first 285 shipments have been turned in. They show the following over the past 8 weeks: Week 1 234567 8 This exercise contains only part c. No. of Shipments 23 31 30 37 35 42 43 44 No. of Shipments Incorrect with Bill of Defects 10 11 11 12 12 14 15 16 Reason for Defective Shipment Lading 4 1 3 4 5 4 Incorrect Damaged Trucks Truckload Product Late 4 5 5 4 5668 2 7212N 3 AN 4 2 0 4 3111C 2arrow_forwardBoston Electric Generators has been getting many complaints from its major customer, Home Station, about the quality of its shipments of home generators. Daniel Shimshak, the plant manager, is alarmed that a customer is providing him with the only information the company has on shipment quality. He decides to collect information on defective shipments through a form he has asked his drivers to complete on arrival at customers' stores. The forms for the first 287 shipments have been turned in. They show the following over the past 8 weeks: Week No. of Shipments No. of Shipments with Defects 1 23 10 2 31 11 3 32 12 4 39 13 5 35 12 6 40 14 7 41 14 8 46 17 This exercise contains only part a. a) Using the point drawing tool eight times, develop a scatter diagram using total number of shipments and number of defective shipments. Part 2arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.