Chapter 10, Problem 14P
a)
Summary Introduction
To determine: The results of the run test.
Introduction: Run chart refers to a line graph that displays the recorded data based on the time sequence.
b)
Summary Introduction
To determine: The results of the run test.
Introduction: Run chart refers to a line graph that displays the recorded data based on the time sequence.
c)
Summary Introduction
To determine: The results of the run test.
Introduction: Run chart refers to a line graph that displays the recorded data based on the time sequence.
d)
Summary Introduction
To determine:The results of the run test.
Introduction: Run chart refers to a line graph that displays the recorded data based on the time sequence.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
answer only if you can answer both.
Explain every option
Production phase
After the pre-production phase, the product entered the production phase without introducing any changes in the process. Since it seemed to be stable SPC was not performed for several months, with process stability and variability being assessed by the level of nonconformities it
it produced.
However, after a time, an increasing number of customer complaints due to products supplied outside the specification/.
The Quality Engineer decided to take 20 samples from the process with regular spacing between samples. Each sample is made up of 3 parts. The data obtained for the highlighted dimension samples are presented in Table 2 below:
measurements
in mm for
critical
sample dimension
number
1
2
3
4
5
6
7
8
9
Observations
2
3
50.767
1
50.972 50.785
50.956 50.97 50.914
51.066 50.933 51.086
50.917
51.081 51.092
50.948 50.828 51.054
50.859 51.083 50.789
50.984 50.961 50.943
51.013 51.02 50.734
50.898 50.956 50.885
51.004 50.984 50.839
Table 2: Measurements in mm for critical…
Chapter 10 Solutions
OPERATIONS MANAGEMENT CONNECT AC
Ch. 10.2 - Prob. 1.1RQCh. 10.2 - Prob. 1.2RQCh. 10.4 - Prob. 1.1RQCh. 10.4 - Prob. 1.2RQCh. 10 - Prob. 1DRQCh. 10 - Prob. 2DRQCh. 10 - Prob. 3DRQCh. 10 - Prob. 4DRQCh. 10 - Prob. 5DRQCh. 10 - Prob. 6DRQ
Ch. 10 - Prob. 7DRQCh. 10 - Prob. 8DRQCh. 10 - Prob. 9DRQCh. 10 - Prob. 10DRQCh. 10 - Prob. 11DRQCh. 10 - Prob. 12DRQCh. 10 - Prob. 13DRQCh. 10 - Prob. 14DRQCh. 10 - Prob. 15DRQCh. 10 - Prob. 16DRQCh. 10 - Prob. 1TSCh. 10 - Prob. 2TSCh. 10 - Prob. 3TSCh. 10 - Prob. 1CTECh. 10 - Prob. 2CTECh. 10 - Prob. 3CTECh. 10 - Prob. 4CTECh. 10 - Prob. 1PCh. 10 - Prob. 2PCh. 10 - Prob. 3PCh. 10 - Prob. 4PCh. 10 - Prob. 5PCh. 10 - Prob. 6PCh. 10 - Prob. 7PCh. 10 - Prob. 8PCh. 10 - Prob. 9PCh. 10 - Prob. 10PCh. 10 - Prob. 11PCh. 10 - Prob. 12PCh. 10 - Prob. 13PCh. 10 - Prob. 14PCh. 10 - Prob. 15PCh. 10 - Prob. 16PCh. 10 - Prob. 17PCh. 10 - A production process consists of a three-step...Ch. 10 - Prob. 19PCh. 10 - Prob. 20PCh. 10 - Prob. 21PCh. 10 - Prob. 22PCh. 10 - Prob. 23PCh. 10 - Prob. 24PCh. 10 - Prob. 25PCh. 10 - Prob. 26PCh. 10 - Prob. 27PCh. 10 - Prob. 28PCh. 10 - Prob. 29PCh. 10 - Prob. 1.1CQCh. 10 - Prob. 2.1CQCh. 10 - Prob. 2.2CQCh. 10 - Prob. 2.3CQCh. 10 - Prob. 2.4CQ
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- 4. Problem 8.29 The number of imperfections in bond paper produced by a paper mill is observed over a period of several days. Table 8-28 shows the area inspected and the number of imperfections for 25 samples. Construct a control chart for the number of imperfections per square meter. Revise the limits, if necessary, assuming special causes for the out-of-control points. TABLE 8-28 Area Area Sample Inspected (m?) Imperfections Sample Inspected (m²) Imperfections 1 150 6 14 300 8 2 100 8 15 300 12 3 200 5 16 200 6 4 150 4 17 150 4 250 10 18 200 7 6. 100 11 19 150 14 7 150 20 100 4 8 200 5 21 100 8 9 300 10 22 200 10 250 10 23 300 12 11 100 24 250 7 12 200 4 25 200 5 13 250 12arrow_forwardThe Healthy Chocolate Company makes a variety of chocolate candles, including a 12-ounce chocolate bar (340 grams) and a box of six 1-ounce chocolate bars (170 grams). a.Specifications for the 12-ounce bar are 322 grams to 358 grams. What is the largest standard deviation (In grams) that the machine that fills the bar molds can have and still be considered capable if the average fill is 340 grams? (Round your intermediate calculations to 2 decimal places and final answer to 3 decimal places.) Standard deviation b.The machine that filles the bar molds for the 6-ounce bars has a standard deviation of .84 grams. The filling machine is set to deliver an average of 1.04 ounces per bar. Specifications for the six-bar box are 150 to 190 grams per box. Is the process capable? Hint: The variance for the box is equal to six times the bar variance. Convert all calculations Into grams. O Yes O No grams c.What is the lowest setting in ounces for the filling machine that will provide capability in…arrow_forwardSolve in a normal method (no excel please ). (8)arrow_forward
- P-chart and c-chart. Using the appropriate control chart, determine two-sigma controllimits for each Problem case, a. An inspector found an average of 3.9 scratches in the exterior paint of each of theautomobiles being prepared for shipment to dealers. b. Before shipping lawnmowers to dealers, an inspector attempts to start each mowerand notes any that do not start on the first try. The lot size is 100 mowers, and anaverage of 4 did not start (4 percent).arrow_forwardProblem 10-4 (Static) Software upgrade times (in minutes) are being evaluated. Samples of five observations each have been taken, and the results are as listed. 1 79.2 78.8 80.0 78.4 81.0 Number of Observations in Subgroup, n 2 4 5 6 7 8 9 Click here for the Excel Data File Factors for three-sigma control limits for and Rcharts 10 11 13 12 13 14 SAMPLE 2 4 3 80.5 79.6 78.9 78.7 81.0 80.4 79.7 79.6 79.4 80.4 79.4 80.1 80.6 15 16 17 18 19 20 80.3 80.8 Factor for I Chart, A2 1.88 1.02 0.73 0.58 0.48 0.42 5 6 80.5 79.7 79.6 80.6 80.4 80.5 80.8 80.0 78.8 81.1 0.37 0.34 0.31 0.29 0.27 0.25 0.24 0.22 0.21 0.20 0.19 0.19 0.18 FACTORS FOR R CHARTS Lower Upper Control Limit, D3 Control Linit, D4 3.27 2.57 2.28 2.11 2.00 1.92 1.86 1.82 1.78 1.74 1.72 1.69 1.67 1.65 1.64 1.62 1.61 1.60 1.59 0 8 0 0 0 0.08 0.14 0.18 0.22 0.26 0.28 0.31 0.33 0.35 0.36 0.38 0.39 0.40 0.41arrow_forwardSam’s Long Life 60-watt light bulbs are designed to have a life of 1,350 hours with tolerance of ± 340 hours. A recent representative sample from the process that makes these light bulbs revealed a mean of 1,290 hours, with a standard deviation of 94 hours. Compute a. Compute the process capability ratio and the process capability index, and comment on the overall capability of the process b. Explain to what extent the process for producing Sam’s Long Life 60-watt light bulbs would have to be improved to achieve 4-sigma quality. c. show detail workarrow_forward
- A shirt manufacturer buys clothes by the 100-yard roll from a supplier. For setting a control chart to manage the irregularities (e.g., loose threads and tears), the following data were collected from a sample provided by the supplier. Sample 1 2 3 4 5 6 7 8 9 10 Irregularities 3 5 2 6 5 4 6 3 4 5 Which type of control chart should be used? Construct a control chart with two-sigma control limits. Suppose the next five rolls from the supplier had three, two, five, three, and seven irregularities. Is the supplier process under control? Explain and show workarrow_forwardAuto pistons at Wemming Chung's plant in Shanghai are produced in a forging process, and the diameter is a critical factor that must be controlled. From sample sizes of 10 pistons produced each day, the mean and the range of this diameter have been as follows: a) What is the value of x? x= 156.76 mm (round your response to two decimal places). b) What is the value of R? Day 1 2 3 4 5 Mean x (mm) 158.9 155.2 155.6 157.5 156.6 R = 4.40 mm (round your response to two decimal places). c) What are the UCL and LCL using 3-sigma? Upper Control Limit (UCL) = mm (round your response to two decimal places). Range R (mm) 4.2 4.4 4.3 4.8 4.3 Çarrow_forwardPlease do not give solution in image format thankuarrow_forward
- The operations manager of thebooking services departmentof Hometown Bank is concerned about the number ofwrong customer account numbers recorded by Hometownpersonnel. Each week a random sample of 2,500 depositsis taken, and the number of incorrect account numbers is recorded. The results for the past12 weeks are shown in thefollowing table. Is the bookingprocess out of statistical control? Use three-sigma controllimits, which will provide a typeI error of 0.26 percent.arrow_forwardWhy is it usually desirable to use both a median run test and an up/down run test on the same data in an production of organization ?arrow_forwardThe following is a control chart for the average number of minor errors in 22 service reports. UCL LCL a. Calculate the observed mean, expected mean, standard deviation and z value for the median and up/down test. Use z = +/-2 to compare your z test scores. (Negative amounts should be indicated by a minus sign. Round your answers to 2 decimal places.) Test Observed Expected Std. dev Median Up/Downarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.