Engineering Economy (17th Edition)
17th Edition
ISBN: 9780134870069
Author: William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
Publisher: PEARSON
expand_more
expand_more
format_list_bulleted
Question
Chapter 10, Problem 10P
(a):
To determine
Calculate the benefit cost ratio.
(b):
To determine
Calculate the new benefit cost ratio.
(c):
To determine
Reason for same ranking.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
in the development of a publicly owned, commercial waterfront area, three possible independent plans are being
considered. Their costs and estimated benefits are given in the table to the right.
a. Which plan(s) should be adopted, if any, if the controlling board wishes to invest any amount required, provided
that the B-C ratio on the required investment is at least 1.0?
b. Suppose that 10% of the costs of each plan are reclassified as disbenefits. What percentage change in the B-C
ratio of each plan results from the reclassification?
c. Comment on why the rank-orderings in (a) are unaffected by the change in (b)
a. Perform the B-C analysis. Fill-in the table below (Round to four decimal places)
B-C ratio
Plan
A
Is the alternative acceptable?
Plan
ARC
А
B
С
PW (5000s)
Costs
$138,000
125,000
106,000
Benefits
$119,000
149,000
139,000
Don't use Ai.
Answer in step by step with explanation
Just need help with part d and e. Not a, b, or c. Thank you.
Chapter 10 Solutions
Engineering Economy (17th Edition)
Ch. 10 - Prob. 1PCh. 10 - Prob. 2PCh. 10 - Prob. 3PCh. 10 - A retrofitted space-heating system is being...Ch. 10 - Prob. 5PCh. 10 - Prob. 6PCh. 10 - Prob. 7PCh. 10 - Prob. 8PCh. 10 - Prob. 9PCh. 10 - Prob. 10P
Ch. 10 - Prob. 11PCh. 10 - Prob. 12PCh. 10 - Prob. 13PCh. 10 - Prob. 14PCh. 10 - Prob. 15PCh. 10 - Prob. 16PCh. 10 - Four mutually exclusive projects are being...Ch. 10 - Two municipal cell tower designs are being...Ch. 10 - Prob. 19PCh. 10 - Prob. 20PCh. 10 - Prob. 21PCh. 10 - Prob. 22PCh. 10 - You have been requested to recommend one of the...Ch. 10 - Prob. 24PCh. 10 - Prob. 25PCh. 10 - Prob. 26FECh. 10 - Prob. 27FECh. 10 - Prob. 28FECh. 10 - Prob. 29FECh. 10 - Prob. 30FECh. 10 - Prob. 31FE
Knowledge Booster
Similar questions
- Please answer fastarrow_forwardQ7.2. From the following data, use the conventional B/C ratio for a project which has a 20-year life to determine if it is economically justified. Use an interest rate of 8% per year. Consequences To the People To the Government Annual benefits = $90,000 per year First cost = $750,000 !3! %3! Annual disbenefits $10,000 per year Annual cost = $50,000 per year %3D %3D Annual savings = $30,000 per yeararrow_forwardExplain how the viewpoint established before a public sector analysis is started can turn an estimate from being categorized as a disbenefit to a cost, or vice versa.arrow_forward
- Solvearrow_forwardIn computing the B/C ratio, is the annual revenue counted as benefits? Please compute the B/C ratio of MEA 5 and show your solution (not in excel). and explain MARR=12%arrow_forwardWhat is the B/C Ratio for a firm considering an investment in a new manufacturing technology? Investment = $2,500,000 Salvage Value = $150,000 MARR = 15% Net Annual Savings = $600,000 Project Life = 10 years Please don't just use excel, please show steps..arrow_forward
- There are five independent projects available to be financed by a certain public institution. The following table shows the annual equivalent benefits and costs of each one: a) the institution wishes to invest money as long as the conventional B/C ratio is at least equal to one. Which alternative should be selected for funding? b) What is the order of the projects, from best to worst?arrow_forwardThe following three mutually exclusive alternative proposals are being considered for flood proofing a factory building that is located in an area subject to occasional flooding by a nearby river. 1. Do nothing: Damage to the building in a moderate flood is $9,000 and in a severe flood it is $23,000. 2. Protect the building with a one-time initial expenditure of $20,000 so that the building can withstand moderate flooding without any damage and withstand severe flooding with only a $12,000 damage. 3. Protect the building with a one-time initial expenditure of $31,000 so that the building can withstand any flooding with no damage at all. In any year, there is a 19% probability of moderate flooding and a 9% probability of severe flooding. Using a MARR of 6% per year and a service life of 20 years, determine which of the three alternatives is the most economical. (a) Calculate EUAC values for each scenario (use negative numbers for costs) The expected EUAC for the "Do Nothing" alternative…arrow_forwardWhen faced with alternatives having unequal lives, do the following when calculating the benefit-cost ratio. Use an Incremental B/C approach O Compare all alternatives over a common planning horizon O At the end of the planning horizon, provide estimates for residual benefits and salvage values for useful lives beyond the planning horizon O All the mentioned alternativesarrow_forward
- The following three mutually exclusive alternative proposals are being considered for flood proofing a factory building that is located in an area subject to occasional flooding by a nearby river. 1. Do nothing: Damage to the building in a moderate flood is $11,000 and in a severe flood it is $24,000. 2. Protect the building with a one-time initial expenditure of $20,000 so that the building can withstand moderate flooding without any damage and withstand severe flooding with only a $10,000 damage. 3. Protect the building with a one-time initial expenditure of $32,000 so that the building can withstand any flooding with no damage at all. In any year, there is a 19% probability of moderate flooding and a 9% probability of severe flooding. Using a MARR of 6% per year and a service life of 8 years, determine which of the three alternatives is the most economical. (a) Calculate EUAC values for each scenario (use negative numbers for costs) The expected EUAC for the "Do Nothing" alternative…arrow_forwardThe following three mutually exclusive alternative proposals are being considered for flood proofing a factory building that is located in an area subject to occasional flooding by a nearby river. 1. Do nothing: Damage to the building in a moderate flood is $11,000 and in a severe flood it is $24,000. 2. Protect the building with a one-time initial expenditure of $20,000 so that the building can withstand moderate flooding without any damage and withstand severe flooding with only a$12,000 damage. 3. Protect the building with a one-time initial expenditure of $32,000 so that the building can withstand any flooding with no damage at all. In any year, there is a 21% probability of moderate flooding and a 10% probability of severe flooding. Using a MARR of 8% per year and a service life of 12 years, determine which of the three alternatives is the most economical. (a) Calculate EUAC values for each scenario (use negative numbers for costs) The expected EUAC for the "Do…arrow_forwardCalculate the modified and conventional B-C Ratio using AW in four decimal places. Is the project acceptable?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Managerial Economics: Applications, Strategies an...EconomicsISBN:9781305506381Author:James R. McGuigan, R. Charles Moyer, Frederick H.deB. HarrisPublisher:Cengage Learning
Managerial Economics: Applications, Strategies an...
Economics
ISBN:9781305506381
Author:James R. McGuigan, R. Charles Moyer, Frederick H.deB. Harris
Publisher:Cengage Learning