Solid Waste Engineering: A Global Perspective, Si Edition
Solid Waste Engineering: A Global Perspective, Si Edition
3rd Edition
ISBN: 9781305638600
Author: William A. Worrell, P. Aarne Vesilind, Christian Ludwig
Publisher: Cengage Learning
bartleby

Concept explainers

Question
Book Icon
Chapter 1, Problem 1.5P
To determine

A cover letter for the recycling program for a small community to achieve at least 50 per cent diversion from the landfill.

Blurred answer
Students have asked these similar questions
If you’re planning a solid waste collection program, cite and explain four collection elements that are important
A community of 1200 homes cannot pay for the initial and operating costs of the recycling collection vehicles that were to be used. Instead, residents are to haul recycling containers to a drop off centre operated by the community. Calculate the number of vehicles from which recyclable materials must be unloaded per hour at the recycling centre. Assume the centre is open for 8 hours per day, two days a week, and that 40% of the residents will deliver recycling containers. Also assume 75% of the participants will take their separated materials to the drop-off centre once a week and the remaining 25% of participants will bring separated materials to the centre once every two weeks.
A town with 2,350 residents wants to establish a municipality owned and operated solid waste( garbage) collection program. They can purchase one of three possible trucks that have the ff. characteristics: Truck A, 18 m3 capacity Truck B, 15 m3 capacity Truck C, 12 m3 capacity If the truck is to collect the refuse for one-fifth of the town each day during a 5-day work week, then every residence will be collected during the week, and the truck will have to make only one trip per day to the landfill. Which truck or trucks will have sufficient capacity. Assume a rate of 1.75 kg/capitald. Assume that the truck is able to compact the refuse to 350 kg/ m3 * 14.1 5,757.5 4,935 24,675 28.787 5 Truck Truck Truck 16.45 A B What is the total tonnage of solid waste to be collected/wk? What is the total weight of waste to be collected everyday? What is the required truck сарacity in cubic meters? Which truck ооо о о о о should be bought ?
Knowledge Booster
Background pattern image
Civil Engineering
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Solid Waste Engineering
Civil Engineering
ISBN:9781305635203
Author:Worrell, William A.
Publisher:Cengage Learning,