Textbook Question
thumb_up100%
Chapter 1, Problem 14R
Does the NEC provide minimum or maximum standards? __________
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
1)The NEC Style Manual indicates that if a term in the NEC appears in more than two articles, it qualifies for a definition in which of the following. a) The articles where the term appears b) Article 90 c) Article 100 d) Table of Contents
2)Definitions of terms related to grounding and bonding and used only in Article 250 are located in ________.a) Article 100 b) Article 200 c) Chapter 9 d) Section 250.2
3)As a general rule, when installing ground rod electrodes, two must be installed always unless a single ground rod provides not more than 25 ohms’ resistance to ground. a) True b) False
4.a. The ___ calculated load is rarely placed on an electrical system.A. optionalB. standardC. total
4.b. What's the primary disadvantage of using copper conductors?A. CostB. AvailabilityC. Weight
4.c. You're evaluating the components of a multioccupancy building that won't have an on-site employee. Tobe compliant with the NEC, each occupant will need to have access to their ownA. service-disconnecting means.B. service conductor.C. cable attachment point.D. emergency fire water-pump disconnect.
6. Ferrous metal raceways or enclosures are made with _______ content.A. brass or aluminumB. steel or brassC. aluminum or ironD. iron or steel
Chapter 1 Solutions
Electrical Wiring Residential
Ch. 1 - What is the purpose of specifications?Ch. 1 - Refer to the specifications in the back of this...Ch. 1 - What is done to prevent a plan from becoming...Ch. 1 - Name three requirements contained in the...Ch. 1 - Prob. 5RCh. 1 - What phrase is used when a substitution is...Ch. 1 - What is the purpose of an electrical symbol?...Ch. 1 - Prob. 8RCh. 1 - Prob. 9RCh. 1 - What three parties must be satisfied with the...
Ch. 1 - Prob. 12RCh. 1 - Prob. 13RCh. 1 - Does the NEC provide minimum or maximum standards?...Ch. 1 - What do the letters UL signify?Ch. 1 - What section of the NEC states that all listed or...Ch. 1 - Prob. 17RCh. 1 - Prob. 18RCh. 1 - Does compliance with the NEC always result in an...Ch. 1 - Name two nationally recognized testing...Ch. 1 - Prob. 21RCh. 1 - Prob. 23RCh. 1 - A junction box on a piece of European equipment is...Ch. 1 - Prob. 25RCh. 1 - You will learn in Chapter 3 that residential...Ch. 1 - Prob. 27RCh. 1 - What can you do to reduce or eliminate the...Ch. 1 - What is the NEC definition of a qualified person?Ch. 1 - Are low-voltage systems totally safe? Explain.Ch. 1 - Prob. 32RCh. 1 - What do the letters PPE stand for?...Ch. 1 - Prob. 34RCh. 1 - Where might you obtain information about...Ch. 1 - Prob. 36R
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.Similar questions
- Raceway fill calculations are a prerequisite in ____ needed for particular circuits. Select one: A. MATERIAL REQUIREMENTS B. SCHEMATIC REQUIREMENTS C. DETERMINING THE SIZE OF RACEWAY D. CIRCUIT LOADSarrow_forwardA means shall be provided in each metal box over 100 cubic inches for the connection of an equipment grounding conductor. The means shall be permitted to be ______. a tapped hole the cover screw III. a screw used to mount the box (a.) I only (c.) I & II only (b.) II only (d.) I, II or IIIarrow_forwardAnswer the following: A) Type of clipper circuit per level of clipping. 1. ___________ 2. ___________ 3. ___________ B) Type of clipper circuit per non-linear devices used. 1. ___________ 2. ___________ C) Other term for clipper circuit. 1. ___________ 2. ___________ 3. ___________arrow_forward
- ___________ is an Area on a device characteristic where the ratio between applied voltage and resulting current is constant.arrow_forwardAccording to the NEC, the term _______ means "recognized as suitable for a specific purpose described in the code." A. labeled B. listed C. approved D. identifiedarrow_forwardPart 2: Analysis and selection of the Wind Turbine. The team decides at install a 30 MW wind farm. The turbine that has been selected by the local contractor is an Enercon wind turbine. The specifications of all the available Enercon wind turbine is shown in the attached datasheet. 1. Decide on the required number of wind turbines needed. 2. In your own words, explain what the Betz limit for wind turbines means.arrow_forward
- Messages AA Statement one Training will allow you to safely erect a mobile. tower scaffold on any ground surface condition. and access the tower both internal and externally Statement two In windy conditions placing sheeting around the mobile tower scaffold will protect the workers on the tower a) Statement two is incorrect b) Statement one and two are correct c) Statement one is correct and statement two is incorrect d) Both statements are incorrect actclass.co.uk 22 Questi 23 Questi 24 Questi 25 Questi 26 Questi Submit Answers Ćarrow_forward13. If an equipment bonding jumper is run external to a raceway, it must be less than _______ feet.A. 6B. 2C. 4D. 5arrow_forwardA device used in kitchen serving hotels dining rooms club houses and restaurants is__________. a.) Grease basin b.) Yard basin c.) Garage basin d.) Oil catch basinarrow_forward
- 1.a. Section 300.15(C) requires a fitting to be installed on each end of a conduit or tubing being used toprovide support or protection to protect the cable fromA. hazardous vapors.B. direct sunlight.C. abrasion.D. extreme heat or cold.1.b. Typically, a/an _______ is a better electrode than a ground rod because it provides a greater surface areafrom which the electrons can be dissipated.A. continuous grounding conductorB. clamp-on ground resistance meterC. rebarD. OCPDarrow_forwardAn emergency system shall have adequate capacity and rating for _______ to be operated simultaneously A. 80% of the loads B. All loads C. 125% of the loads D. None of these answersarrow_forward____ current occurs when the system neutral is grounded improperly downstream from the service equipment. Select one: A. PHASED B. OBJECTIONABLE C. POSITIVE D. NEGATIVEarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- EBK ELECTRICAL WIRING RESIDENTIALElectrical EngineeringISBN:9781337516549Author:SimmonsPublisher:CENGAGE LEARNING - CONSIGNMENTDelmar's Standard Textbook Of ElectricityElectrical EngineeringISBN:9781337900348Author:Stephen L. HermanPublisher:Cengage Learning
EBK ELECTRICAL WIRING RESIDENTIAL
Electrical Engineering
ISBN:9781337516549
Author:Simmons
Publisher:CENGAGE LEARNING - CONSIGNMENT
Delmar's Standard Textbook Of Electricity
Electrical Engineering
ISBN:9781337900348
Author:Stephen L. Herman
Publisher:Cengage Learning
What is a Thyristor? - A Galco TV Tech Tip; Author: GalcoTV;https://www.youtube.com/watch?v=LBb_Qz7J3zA;License: Standard Youtube License