Working on major construction project that requires considerable amounts of concrete to be used, you are asked to design a concrete mix following the BRE methodology. The concrete mix specifications are: o Characteristic compressive strength of 50 N/mm 2 at 7 days. o Failure rate of 1% o Previous control data yielded a standard deviation of 5 N/mm 2 o CEM-I 52.5 o Air-entraining is not required o Required slump 50 mm o Maximum cement content is 550 kg/m 3 o Coarse aggregate: Uncrushed maximum size 10mm o Fine aggregate: Uncrushed with 45% passing 600 μm sieve o Relative density of aggregates: 2.7 o Assume both types of aggregate as SSD. Proceed with the concrete mix design methodology and comment on any implications during this process.
Working on major construction project that requires considerable amounts of concrete to be used, you are asked to design a concrete mix following the BRE methodology. The concrete mix specifications are: o Characteristic compressive strength of 50 N/mm 2 at 7 days. o Failure rate of 1% o Previous control data yielded a standard deviation of 5 N/mm 2 o CEM-I 52.5 o Air-entraining is not required o Required slump 50 mm o Maximum cement content is 550 kg/m 3 o Coarse aggregate: Uncrushed maximum size 10mm o Fine aggregate: Uncrushed with 45% passing 600 μm sieve o Relative density of aggregates: 2.7 o Assume both types of aggregate as SSD. Proceed with the concrete mix design methodology and comment on any implications during this process.
Traffic and Highway Engineering
5th Edition
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Garber, Nicholas J.
Chapter20: Design Of Rigid Pavements
Section: Chapter Questions
Problem 1P: Portland cement concrete consists of what four primary elements?
Related questions
Question
Working on major construction project that requires considerable amounts of concrete to be used,
you are asked to design a concrete mix following the BRE methodology. The concrete mix
specifications are:
o Characteristic compressive strength of 50 N/mm 2 at 7 days.
o Failure rate of 1%
o Previous control data yielded a standard deviation of 5 N/mm 2
o CEM-I 52.5
o Air-entraining is not required
o Required slump 50 mm
o Maximum cement content is 550 kg/m 3
o Coarse aggregate: Uncrushed maximum size 10mm
o Fine aggregate: Uncrushed with 45% passing 600 μm sieve
o Relative density of aggregates: 2.7
o Assume both types of aggregate as SSD.
you are asked to design a concrete mix following the BRE methodology. The concrete mix
specifications are:
o Characteristic compressive strength of 50 N/mm 2 at 7 days.
o Failure rate of 1%
o Previous control data yielded a standard deviation of 5 N/mm 2
o CEM-I 52.5
o Air-entraining is not required
o Required slump 50 mm
o Maximum cement content is 550 kg/m 3
o Coarse aggregate: Uncrushed maximum size 10mm
o Fine aggregate: Uncrushed with 45% passing 600 μm sieve
o Relative density of aggregates: 2.7
o Assume both types of aggregate as SSD.
Proceed with the concrete mix design methodology and comment on any implications during this
process.
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 4 steps with 10 images
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning
Materials Science And Engineering Properties
Civil Engineering
ISBN:
9781111988609
Author:
Charles Gilmore
Publisher:
Cengage Learning
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning
Materials Science And Engineering Properties
Civil Engineering
ISBN:
9781111988609
Author:
Charles Gilmore
Publisher:
Cengage Learning
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,
Fundamentals of Geotechnical Engineering (MindTap…
Civil Engineering
ISBN:
9781305635180
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Construction Materials, Methods and Techniques (M…
Civil Engineering
ISBN:
9781305086272
Author:
William P. Spence, Eva Kultermann
Publisher:
Cengage Learning
Solid Waste Engineering
Civil Engineering
ISBN:
9781305635203
Author:
Worrell, William A.
Publisher:
Cengage Learning,