Work centers W, X, Y, and Z are available for 40 hours per week and have no setup time when switching between products, Market demand for each product is 80 units per week. In the questions that follow, the traditional method refers to maximizing the contribution margin per unit for each product, and the bottleneck method refers to maximizing the contribution margin per minute at the bottleneck for each product A company makes four products that have the following characteristics: Product A sells for $50 but needs $10 of materials and $15 of labor to produce; Product B sells for $75 but needs $30 of materials and $15 of labor to produce, Product C sells for $100 but needs $50 of materials and $30 of labor to produce, Product D sells for $150 but needs $75 of materials and $40 of labor to produce. The processing requirements for each product on each of the four machines are shown in the table. Work Center W X Y Z A 6 9 4 10 Processing Time (min/unit) B C 1 3 4 12 7 10 3 0 D 12 8 A. Greater than $8,100 but less than or equal to $8,300 OB. Greater than $8,300 but less than or equal to $8,500 OC. Less than or equal to $8,100 OD. Greater than $8,500 9 11 Using the traditional method, what is the profit if the company manufactures the optimal product mix (consider variable costs only-overhead is not included in this profit calculation)?

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question

Please do not give solution in image format thanku 

Work centers W, X, Y, and Z are available for 40 hours per week and have no setup time when switching
between products. Market demand for each product is 80 units per week. In the questions that follow, the
traditional method refers to maximizing the contribution margin per unit for each product, and the bottleneck
method refers to maximizing the contribution margin per minute at the bottleneck for each product.
A company makes four products that have the following characteristics: Product A sells for $50 but needs $10 of
materials and $15 of labor to produce; Product B sells for $75 but needs $30 of materials and $15 of labor to
produce; Product C sells for $100 but needs $50 of materials and $30 of labor to produce, Product D sells for
$150 but needs $75 of materials and $40 of labor to produce. The processing requirements for each product on
each of the four machines are shown in the table
Work Center
W
X
Y
Z
A
6
9
4
10
Processing Time (min/unit)
B
C
1
3
10
3
0
12
A. Greater than $8,100 but less than or equal to $8,300
O B. Greater than $8,300 but less than or equal to $8,500
OC. Less than or equal to $8,100
O D. Greater than $8,500
D
12
8
9
11
Using the traditional method, what is the profit if the company manufactures the optimal product mix (consider
variable costs only-overhead is not included in this profit calculation)?
Transcribed Image Text:Work centers W, X, Y, and Z are available for 40 hours per week and have no setup time when switching between products. Market demand for each product is 80 units per week. In the questions that follow, the traditional method refers to maximizing the contribution margin per unit for each product, and the bottleneck method refers to maximizing the contribution margin per minute at the bottleneck for each product. A company makes four products that have the following characteristics: Product A sells for $50 but needs $10 of materials and $15 of labor to produce; Product B sells for $75 but needs $30 of materials and $15 of labor to produce; Product C sells for $100 but needs $50 of materials and $30 of labor to produce, Product D sells for $150 but needs $75 of materials and $40 of labor to produce. The processing requirements for each product on each of the four machines are shown in the table Work Center W X Y Z A 6 9 4 10 Processing Time (min/unit) B C 1 3 10 3 0 12 A. Greater than $8,100 but less than or equal to $8,300 O B. Greater than $8,300 but less than or equal to $8,500 OC. Less than or equal to $8,100 O D. Greater than $8,500 D 12 8 9 11 Using the traditional method, what is the profit if the company manufactures the optimal product mix (consider variable costs only-overhead is not included in this profit calculation)?
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps with 2 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.