Variable Fixed Actual costs incurred $35,000 $16,500 Costs allocated to products Flexible budget Actual input x budgeted rate 36,000 15,200 16,000 31,500 Fill in the blanks. Use F for favorable and U for unfavorable: Variable Fixed (1) Spending variance (2) Efficiency variance (3) Production-volume variance (4) Flexible-budget variance (5) Underallocated (overallocated) manufacturing overhead %24
Variance Analysis
In layman's terms, variance analysis is an analysis of a difference between planned and actual behavior. Variance analysis is mainly used by the companies to maintain a control over a business. After analyzing differences, companies find the reasons for the variance so that the necessary steps should be taken to correct that variance.
Standard Costing
The standard cost system is the expected cost per unit product manufactured and it helps in estimating the deviations and controlling them as well as fixing the selling price of the product. For example, it helps to plan the cost for the coming year on the various expenses.
4-
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 1 images