Time-drawdown data collected at a distance of 30 m from a well pumping at a rate of 1000 m³/day are as follows. Calculate the transmissivity and the storativity. t, min 1 2 3 4 5 6 7 10 20 40 80 100 300 500 1000 0.03 0.15 0.30 0.39 0.48 0.61 0.72 0.91 1.38 1.91 2.41 2.60 3.45 3.87 4.39 s, m a) Use Theis Method b) Use modified Theis Method (Cooper-Jacob Method) c) d) Regenerate the drawdowns value found in (a) and compared with the given data. Compute the root mean square error between the calculated drawdown and observation values. Regenerate the drawdowns value found in (b) and compared with the given data. Compute the root mean square error between the calculated drawdown and observation values.
Time-drawdown data collected at a distance of 30 m from a well pumping at a rate of 1000 m³/day are as follows. Calculate the transmissivity and the storativity. t, min 1 2 3 4 5 6 7 10 20 40 80 100 300 500 1000 0.03 0.15 0.30 0.39 0.48 0.61 0.72 0.91 1.38 1.91 2.41 2.60 3.45 3.87 4.39 s, m a) Use Theis Method b) Use modified Theis Method (Cooper-Jacob Method) c) d) Regenerate the drawdowns value found in (a) and compared with the given data. Compute the root mean square error between the calculated drawdown and observation values. Regenerate the drawdowns value found in (b) and compared with the given data. Compute the root mean square error between the calculated drawdown and observation values.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
Related questions
Question

Transcribed Image Text:Time-drawdown data collected at a distance of 30 m from a well pumping at a rate of 1000
m³/day are as follows. Calculate the transmissivity and the storativity.
t, min 1
2
3
4
5
6
7 10 20
40 80 100 300 500 1000
s, m
0.03 0.15 0.30 0.39 0.48 0.61 0.72 0.91 1.38 1.91 2.41 2.60 3.45 3.87
4.39
a) Use Theis Method
b) Use modified Theis Method (Cooper-Jacob Method)
c) Regenerate the drawdowns value found in (a) and compared with the given data. Compute
the root mean square error between the calculated drawdown and observation values.
d) Regenerate the drawdowns value found in (b) and compared with the given data.
Compute the root mean square error between the calculated drawdown and observation
values.
Expert Solution

This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 6 steps

Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you


Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON

Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning


Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON

Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning

Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education


Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning