This is in the surveying subject the first 3 was answered already a b and c, kindly answer the rest thankyouuu?
2. A rectangular building 250.00 m by 130.00 m is to be laid out using a 30-m steel tape having a cross
sectional area of 0.05 cm² under a steady pull of 10 kg and at a mean temperature of 32°C. Under
standardization the 30-m steel tape supported at its full length is 0.010 m too short at a standard pull
of 6 kg with a weight of 1.20 kg with E = 2.0 x 106 kg/cm² and a thermal coefficient of 0.0000116/°C
at standard temperature of 20°C. Determine the following:
a) Correction for the length and width of the building due to incorrect length.
b) Correction for the length and width of the building due to temperature.
c) Correction for the length and width of the building due to tension.
d) Correction for the length and width of the building due to sag.
e) Total Correction
f) Adjusted length and width of the building.
g) The needed tension to be applied to the tape to eliminate the error due to sag.
Transcribed Image Text:2. A rectangular building 250.00 m by 130.00 m is to be laid out using a 30-m steel tape having a cross sectional area of 0.05 cm² under a steady pull of 10 kg and at a mean temperature of 32°C. Under standardization the 30-m steel tape supported at its full length is 0.010 m too short at a standard pull of 6 kg with a weight of 1.20 kg with E = 2.0 x 106 kg/cm² and a thermal coefficient of 0.0000116/°C at standard temperature of 20°C. Determine the following: a) Correction for the length and width of the building due to incorrect length. b) Correction for the length and width of the building due to temperature. c) Correction for the length and width of the building due to tension. d) Correction for the length and width of the building due to sag. e) Total Correction f) Adjusted length and width of the building. g) The needed tension to be applied to the tape to eliminate the error due to sag.
Expert Solution
steps

Step by step

Solved in 4 steps with 4 images

Blurred answer
Knowledge Booster
Professional survey
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning