The laboratory test data for a modified Proctor test and CBR test for (crushed limestone) are given below; Find the CBR valuc at 95% of MDD after necessary corrections, for the tested sample depending on Iraqi Specifications, R6 (after drawing the curve and stating your answer about which sort of sub-bases materials are used in highway construction?- Table 1: CBR test data @56 blows! 56 Blows 2 25-3 Penetration(mm) 00.5 11.5 4 5 15 10 12.5 Load (Kg) 0 15 40 85 140 220 300 455 611 959 1120 1100 Table 2: MDD and CBR values for 10, 25 and 56 blows No. of Blows 10 25 56 MDD, gm/cm 1.95 2.07 2.2 CBR% 24 29 ? CBR% at 95% MDD

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
The laboratory test data for a modified Proctor test and CBR test for (crushed
limestone) are given below, Find the CBR value at 95% of MDD after necessary
corrections, for the tested sample depending on Iraqi Specifications, R6 (after
drawing the curve and stating your answer about which sort of sub-bases materials
are used in highway construction?
Table 1: CBR test data @56 blows:
56 Blows
0.5 1 15 2.
15 40 85 140 220 300 455 611 959
Penetration(mm)
25-3
4
5
75
10
12.5
Load (Kg)
1120 1100
Table 2: MDD and CBR values for 10, 25 and 56 blows
No. of Blows
10
25
56
MDD, gm/cm
1.95
2.07
2.2
CBR%
24
29
CBR% at 95% MDD
Transcribed Image Text:The laboratory test data for a modified Proctor test and CBR test for (crushed limestone) are given below, Find the CBR value at 95% of MDD after necessary corrections, for the tested sample depending on Iraqi Specifications, R6 (after drawing the curve and stating your answer about which sort of sub-bases materials are used in highway construction? Table 1: CBR test data @56 blows: 56 Blows 0.5 1 15 2. 15 40 85 140 220 300 455 611 959 Penetration(mm) 25-3 4 5 75 10 12.5 Load (Kg) 1120 1100 Table 2: MDD and CBR values for 10, 25 and 56 blows No. of Blows 10 25 56 MDD, gm/cm 1.95 2.07 2.2 CBR% 24 29 CBR% at 95% MDD
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 4 steps with 5 images

Blurred answer
Knowledge Booster
Bituminous materials
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning