Question Two: The laboratory test data for a modified Proctor test and CBR test for (crushed limestone) are given below; Find the CBR value at 95% of MDD after necessary corrections, for the tested sample depending on Iraqi Specifications, R6 (after drawing the curve and stating your answer about which sort of sub-bases materials are used in highway construction?

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
%CBR According to Iraqi Specification for different layers:
Layers
Compacted sub grade
Sub-Base
Base
%CBR (lower limit)
4%
30%
35%
Transcribed Image Text:%CBR According to Iraqi Specification for different layers: Layers Compacted sub grade Sub-Base Base %CBR (lower limit) 4% 30% 35%
Question Two:
The laboratory test data for a modified Proctor test and CBR test for (crushed
limestone) are given below; Find the CBR value at 95% of MDD after necessary
corrections, for the tested sample depending on Iraqi Specifications, R6 (after
drawing the curve and stating your answer about which sort of sub-bases materials
are used in highway construction?
Table 1: CBR test data @56 blows
56 Blows
Penetration (mm) 0 0.5 1 1.5 2 25 3
Load (Kg)
No. of Blows
MDD, gm/cm³
0 15 40 85 140 220 300 455 611 959
Table 2: MDD and CBR values for 10, 25 and 56 blows
25
2.07
29
?
4 5 7.5 10 12.5
1120
1100
CBR%
CBR% at 95% MDD
10
1.95
24
56
2.2
?
Transcribed Image Text:Question Two: The laboratory test data for a modified Proctor test and CBR test for (crushed limestone) are given below; Find the CBR value at 95% of MDD after necessary corrections, for the tested sample depending on Iraqi Specifications, R6 (after drawing the curve and stating your answer about which sort of sub-bases materials are used in highway construction? Table 1: CBR test data @56 blows 56 Blows Penetration (mm) 0 0.5 1 1.5 2 25 3 Load (Kg) No. of Blows MDD, gm/cm³ 0 15 40 85 140 220 300 455 611 959 Table 2: MDD and CBR values for 10, 25 and 56 blows 25 2.07 29 ? 4 5 7.5 10 12.5 1120 1100 CBR% CBR% at 95% MDD 10 1.95 24 56 2.2 ?
Expert Solution
steps

Step by step

Solved in 3 steps with 5 images

Blurred answer
Knowledge Booster
Mass and mass related variables in engineering
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning