The Department of Traffic is considering three improvement plans for a heavily traveled intersection within the city. The intersection improvement is expected to achieve three goals: improve travel speeds, increase safety, and reduce operating expenses for motorists. The annual dollar value of savings compared with existing conditions for each criterion as well as additional construction and maintenance costs is shown in the table below. If the economic life of the road is considered to be 60 years and the discount rate is 3.5%, which alternative should be selected? Solve the problem using the four methods for economic analysis.

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
icon
Concept explainers
Question

The Department of Traffic is considering three improvement plans for a heavily traveled intersection within the city. The intersection improvement is expected to achieve three goals: improve travel speeds, increase safety, and reduce operating expenses for motorists. The annual dollar value of savings compared with existing conditions for each criterion as well as additional construction and maintenance
costs is shown in the table below. If the economic life of the road is considered to be 60 years and the discount rate is 3.5%, which alternative should be selected? Solve the problem using the four methods for economic analysis.

Annual Saving in
Accidents, $
Annual Travel Time Annual Operating
Savings, $
Annual Additional
Alternative
Construction Cost, $
Benefits, $
Maintenance Cost, $
3D
205.000
5,500
3.300
600
1.500
230.000
5,000
6,800
750
2.600
315.000
7,500
6,000
3,100
3,000
Draw the Cash Flow Diagram of this given table. Then,
Solve by the EUAW method.
EUAW: - ISelect)
EUAW2"
( Select )
EUAWa- ISelect]
The project with the highest EUAW is alternative (Select)
>
>
Transcribed Image Text:Annual Saving in Accidents, $ Annual Travel Time Annual Operating Savings, $ Annual Additional Alternative Construction Cost, $ Benefits, $ Maintenance Cost, $ 3D 205.000 5,500 3.300 600 1.500 230.000 5,000 6,800 750 2.600 315.000 7,500 6,000 3,100 3,000 Draw the Cash Flow Diagram of this given table. Then, Solve by the EUAW method. EUAW: - ISelect) EUAW2" ( Select ) EUAWa- ISelect] The project with the highest EUAW is alternative (Select) > >
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 4 steps with 3 images

Blurred answer
Knowledge Booster
Evaluation of Transportation Projects
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning