The analyst in the Dorben Company wishes to assign a number of like facilities to an operator based on minimizing the cost per unit of output. A detailed study of the facilities revealed the following: Loading machine standard time = 0.30 minutes Unloading machine standard time = 0.25 minutes Walk time between two machines = 0.09 minutes Operator rate = $12.00 per hour Machine rate (both idle and working) = $18.00 per hour Machine cycle time = 1.55 minutes TEC = The Expected Cost a) With your initial estimation, how many machines can be serviced exactly?(please keep a non-integer with three decimal places) b) How much is your TEC per piece if the operator has idle time? (please keep three decimal places) c)How much is your TEC per piece if the machine has idle time? (please keep three decimal places) d) How many of these machines should be assigned to each operator?(please write down a numerical number)
The analyst in the Dorben Company wishes to assign a number of like facilities to an operator based on minimizing the cost per unit of output. A detailed study of the facilities revealed the following: Loading machine standard time = 0.30 minutes Unloading machine standard time = 0.25 minutes Walk time between two machines = 0.09 minutes Operator rate = $12.00 per hour Machine rate (both idle and working) = $18.00 per hour Machine cycle time = 1.55 minutes TEC = The Expected Cost a) With your initial estimation, how many machines can be serviced exactly?(please keep a non-integer with three decimal places) b) How much is your TEC per piece if the operator has idle time? (please keep three decimal places) c)How much is your TEC per piece if the machine has idle time? (please keep three decimal places) d) How many of these machines should be assigned to each operator?(please write down a numerical number)
Elements Of Electromagnetics
7th Edition
ISBN:9780190698614
Author:Sadiku, Matthew N. O.
Publisher:Sadiku, Matthew N. O.
ChapterMA: Math Assessment
Section: Chapter Questions
Problem 1.1MA
Related questions
Question
The analyst in the Dorben Company wishes to assign a number of like facilities to an
operator based on minimizing the cost per unit of output. A detailed study of the facilities
revealed the following:
Loading machine standard time = 0.30 minutes
Unloading machine standard time = 0.25 minutes
Walk time between two machines = 0.09 minutes
Operator rate = $12.00 per hour
Machine rate (both idle and working) = $18.00 per hour
Machine cycle time = 1.55 minutes
TEC = The Expected Cost
- a) With your initial estimation, how many machines can be serviced exactly?(please keep a non-integer with three decimal places)
- b) How much is your TEC per piece if the operator has idle time? (please keep three decimal places)
c)How much is your TEC per piece if the machine has idle time? (please keep three decimal places)
- d) How many of these machines should be assigned to each operator?(please write down a numerical number)
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 3 steps
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
Elements Of Electromagnetics
Mechanical Engineering
ISBN:
9780190698614
Author:
Sadiku, Matthew N. O.
Publisher:
Oxford University Press
Mechanics of Materials (10th Edition)
Mechanical Engineering
ISBN:
9780134319650
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Thermodynamics: An Engineering Approach
Mechanical Engineering
ISBN:
9781259822674
Author:
Yunus A. Cengel Dr., Michael A. Boles
Publisher:
McGraw-Hill Education
Elements Of Electromagnetics
Mechanical Engineering
ISBN:
9780190698614
Author:
Sadiku, Matthew N. O.
Publisher:
Oxford University Press
Mechanics of Materials (10th Edition)
Mechanical Engineering
ISBN:
9780134319650
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Thermodynamics: An Engineering Approach
Mechanical Engineering
ISBN:
9781259822674
Author:
Yunus A. Cengel Dr., Michael A. Boles
Publisher:
McGraw-Hill Education
Control Systems Engineering
Mechanical Engineering
ISBN:
9781118170519
Author:
Norman S. Nise
Publisher:
WILEY
Mechanics of Materials (MindTap Course List)
Mechanical Engineering
ISBN:
9781337093347
Author:
Barry J. Goodno, James M. Gere
Publisher:
Cengage Learning
Engineering Mechanics: Statics
Mechanical Engineering
ISBN:
9781118807330
Author:
James L. Meriam, L. G. Kraige, J. N. Bolton
Publisher:
WILEY