Tailored Clothing is a manufacturer of designer suits. The cost of each suit is the sum of three variable costs (direct material costs, direct manufacturing labor costs, and manufacturing overhead costs) and one fixed-cost category (manufacturing overhead costs). Variable manufacturing overhead cost is allocated to each suit on the basis of budgeted direct manufacturing labor-hours per suit. For June 2017, each suit is budgeted to take 3 labor-hours. Budgeted variable manufacturing overhead cost per labor-hour is $12. The budgeted number of suits to be manufactured in June 2017 is 1,060. Actual variable manufacturing overhead costs in June 2017 were $49,896 for 1,020 suits started and completed. There were no beginning or ending inventories of suits. Actual direct manufacturing labor-hours for June were 4,536. 1. Compute the flexible-budget variance, the spending variance, and the efficiency variance for variable manufacturing overhead. 2. Comment on the results.
Variance Analysis
In layman's terms, variance analysis is an analysis of a difference between planned and actual behavior. Variance analysis is mainly used by the companies to maintain a control over a business. After analyzing differences, companies find the reasons for the variance so that the necessary steps should be taken to correct that variance.
Standard Costing
The standard cost system is the expected cost per unit product manufactured and it helps in estimating the deviations and controlling them as well as fixing the selling price of the product. For example, it helps to plan the cost for the coming year on the various expenses.
Tailored Clothing is a manufacturer of designer suits. The cost of each suit is the sum of three variable costs (direct material
Variable manufacturing overhead cost is allocated to each suit on the basis of budgeted direct manufacturing labor-hours per suit. For June 2017, each suit is budgeted to take 3 labor-hours. Budgeted variable manufacturing overhead cost per labor-hour is $12. The budgeted number of suits to be manufactured in June 2017 is 1,060. Actual variable manufacturing overhead costs in June 2017 were $49,896 for 1,020 suits started and completed. There were no beginning or ending inventories of suits. Actual direct manufacturing labor-hours for June were 4,536.
Trending now
This is a popular solution!
Step by step
Solved in 2 steps