Solve problem 17.5 but assume that m = 0.5 for all stations. Other data are the same 17.5 listed below 17.5 (a) A 10-station assembly machine has an ideal cycle time of 6 sec. The fraction defect rate at each station is 0.005 and a defect always jams the affected station. When a breakdown occurs, it takes 1.2 min, on average, for the system to be put back into operation. Determine (a) the hourly production rate for the assembly machine, (b) yield of good product (final assemblies containing no defective components), and (c) proportion uptime of the system.
Design Against Fluctuating Loads
Machine elements are subjected to varieties of loads, some components are subjected to static loads, while some machine components are subjected to fluctuating loads, whose load magnitude tends to fluctuate. The components of a machine, when rotating at a high speed, are subjected to a high degree of load, which fluctuates from a high value to a low value. For the machine elements under the action of static loads, static failure theories are applied to know the safe and hazardous working conditions and regions. However, most of the machine elements are subjected to variable or fluctuating stresses, due to the nature of load that fluctuates from high magnitude to low magnitude. Also, the nature of the loads is repetitive. For instance, shafts, bearings, cams and followers, and so on.
Design Against Fluctuating Load
Stress is defined as force per unit area. When there is localization of huge stresses in mechanical components, due to irregularities present in components and sudden changes in cross-section is known as stress concentration. For example, groves, keyways, screw threads, oil holes, splines etc. are irregularities.
Solve problem 17.5 but assume that m = 0.5 for all stations. Other data are the same
17.5 listed below
17.5 (a) A 10-station assembly machine has an ideal cycle time of 6 sec. The fraction defect rate at each station is 0.005 and a defect always jams the affected station. When a breakdown occurs, it takes 1.2 min, on average, for the system to be put back into operation. Determine (a) the hourly production rate for the assembly machine, (b) yield of good product (final assemblies containing no defective components), and (c) proportion uptime of the system.
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 3 images