Situation III: Reservoir A is at elevation 90 m above datum, furnishes water to a 600 mm pipe which leads to a point at elevation 30 m, the pipe being 610 m long. Here it branches into three pipes, 200 mm, 300 mm, and 150 mm diameter. The 200 mm pipe runs 300 m and discharges to reservoir B at elevation 75 m, the 300 mm runs 450 m to reservoir C at elevation 52 m, and the 150 mm pipe runs 910 m and discharges to reservoir D at elevation 30 m. f = 0.012 %3D 18. The rate of flow towards reservoir B most nearly gives. a. 0.055 m3/s b. 0.088 m3/s c. 0.044 m3/s d. 0.099 m3/s 19.The rate of flow towards reservoir C most nearly gives. a. 0.033 m3/s b. 0.011 m3/s c. 0.050 m3/s d. 0.060 m3/s 20. The rate of flow towards reservoir D most nearly gives. a. 0.077 m3/s b. 0.055 m3/s c. 0.034 m3/s d. 0.025 m3/s

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
d.
Situation III: Reservoir A is at elevation 90 m above datum, furnishes water to a 600 mm pipe
which leads to a point at elevation 30 m, the pipe being 610 m long. Here it branches into three
pipes, 200 mm, 300 mm, and 150 mm diameter. The 200 mm pipe runs 300 m and discharges to
reservoir B at elevation 75 m, the 300 mm runs 450 m to reservoir C at elevation 52 m, and the 150
mm pipe runs 910 m and discharges to reservoir D at elevation 30 m. f= 0.012
18. The rate of flow towards reservoir B most nearly gives.
a. 0.055 m3/s
b. 0.088 m³/s
0.044 m3/s
d. 0.099 m³/s
С.
19.The rate of flow towards reservoir C most nearly gives.
a. 0.033 m³/s
b. 0.011 m3/s
c. 0.050 m³/s
d. 0.060 m3/s
20. The rate of flow towards reservoir D most nearly gives.
a. 0.077 m³/s
b. 0.055 m3/s
0.034 m3/s
d. 0.025 m3/s
С.
Transcribed Image Text:d. Situation III: Reservoir A is at elevation 90 m above datum, furnishes water to a 600 mm pipe which leads to a point at elevation 30 m, the pipe being 610 m long. Here it branches into three pipes, 200 mm, 300 mm, and 150 mm diameter. The 200 mm pipe runs 300 m and discharges to reservoir B at elevation 75 m, the 300 mm runs 450 m to reservoir C at elevation 52 m, and the 150 mm pipe runs 910 m and discharges to reservoir D at elevation 30 m. f= 0.012 18. The rate of flow towards reservoir B most nearly gives. a. 0.055 m3/s b. 0.088 m³/s 0.044 m3/s d. 0.099 m³/s С. 19.The rate of flow towards reservoir C most nearly gives. a. 0.033 m³/s b. 0.011 m3/s c. 0.050 m³/s d. 0.060 m3/s 20. The rate of flow towards reservoir D most nearly gives. a. 0.077 m³/s b. 0.055 m3/s 0.034 m3/s d. 0.025 m3/s С.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps

Blurred answer
Knowledge Booster
Storm sewers and detention
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning