Scenario The KOREAN factory of Hi-Tech Metal, Inc. primarily manufactures plumbing system parts for gas pipes, drainage pipes, water supply pipes and hoses etc. A mainframe computer was used for scheduling, but it took a lot of time and unnecessarily put heavy workload on scheduling managers and on-site workers. Following are the associated problems to meet customers’ needs Lengthy 3 to 4 days schedule drafting time, caused by mainframe computer’s long processing time. Inflexibility of mainframe computer to sudden order changes, leading to tedious manual calculation and direct on-site adjustment Extra workload for on-site workers One-month base scheduling that cannot meet customers’ need, Task 1 Considering above scenario Summarize the design process for the finished component [Identify components, explain the utilities and design process (5/7/10 step) for components]

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question

Scenario

The KOREAN factory of Hi-Tech Metal, Inc. primarily manufactures plumbing system parts for gas pipes, drainage pipes, water supply pipes and hoses etc. A mainframe computer was used for scheduling, but it took a lot of time and unnecessarily put heavy workload on scheduling managers and on-site workers. Following are the associated problems to meet customers’ needs

  • Lengthy 3 to 4 days schedule drafting time, caused by mainframe computer’s long processing time.
  • Inflexibility of mainframe computer to sudden order changes, leading to tedious manual calculation and direct on-site adjustment
  • Extra workload for on-site workers

One-month base scheduling that cannot meet customers’ need,

Task 1

Considering above scenario Summarize the design process for the finished component

[Identify components, explain the utilities and design process (5/7/10 step) for components]

Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.