Rockit Electronics manufactures a line of digital blue ray players. The player is made from one subassembly of B and one subassembly of C.   B is made of three units of D and two of E. C is made of two units of F and two of E. The blue ray has a lead time of one week. B, C, and E have lead times of two weeks, and D and F have lead times of three weeks. As the production manager, you need to figure out the MRP planning schedule. 1. What is the bill of materials (product structure tree)? 2. If 1,000 units of blue ray players are required in week 10, what is the MRP schedule? Specifically, when items are to be ordered and received.  Assume we have no units of inventory on hand.

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question

Please help me solve this table.

Rockit Electronics manufactures a line of digital blue ray players. The player is made from one subassembly of B and one subassembly of C.  
B is made of three units of D and two of E. C is made of two units of F and two of E.
The blue ray has a lead time of one week. B, C, and E have lead times of two weeks, and D and F have lead times of three weeks.
As the production manager, you need to figure out the MRP planning schedule.

1. What is the bill of materials (product structure tree)?
2. If 1,000 units of blue ray players are required in week 10, what is the MRP schedule? Specifically, when items are to be ordered and received. 
Assume we have no units of inventory on hand.

**Problem 2:**

**Rockit Electronics** manufactures a line of digital blue ray players. The player is made from one subassembly of **B** and one subassembly of **C**.  

**B** is made of three units of **D** and two of **E**. **C** is made of two units of **F** and two of **E**.  

The blue ray has a lead time of one week. **B, C, and E** have lead times of two weeks, and **D and F** have lead times of three weeks.  

As the production manager, you need to figure out the MRP planning schedule.

**a.** What is the bill of materials (product structure tree)?

**b.** If 1,000 units of blue ray players are required in week 10, what is the MRP schedule? Specifically, when items are to be ordered and received.  
Assume we have no units of inventory on hand.

---

**Material Requirements Planning (MRP) Table:**

- A table is presented with periods from 1 to 10 and fields for items, gross requirements, scheduled receipts, lead time (LT), on-hand inventory from prior periods, net requirements, planned order receipts, and planned order releases for each period.
  
- Items are listed as follows with corresponding MRP fields:  
  - Item **A**
  - Item **B**
  - Item **C**
  - Item **D**
  - Item **E**
  - Item **F**

**Side Panel: Lead Time and Inventory**

- A side table shows the lead times and on-hand inventory for items **A, B, C, D, E,** and **F**.

- **Lead Time (Weeks):** Field is provided to fill in lead times for each item.

**Bill of Materials (Product Structure) Tree:**

- A hierarchical diagram illustrates the product structure for the blue ray players. The tree visually represents:
  - The top-level product
  - Subassemblies of B and C
  - Components D, E, and F with connections showing assembly relationships.
Transcribed Image Text:**Problem 2:** **Rockit Electronics** manufactures a line of digital blue ray players. The player is made from one subassembly of **B** and one subassembly of **C**. **B** is made of three units of **D** and two of **E**. **C** is made of two units of **F** and two of **E**. The blue ray has a lead time of one week. **B, C, and E** have lead times of two weeks, and **D and F** have lead times of three weeks. As the production manager, you need to figure out the MRP planning schedule. **a.** What is the bill of materials (product structure tree)? **b.** If 1,000 units of blue ray players are required in week 10, what is the MRP schedule? Specifically, when items are to be ordered and received. Assume we have no units of inventory on hand. --- **Material Requirements Planning (MRP) Table:** - A table is presented with periods from 1 to 10 and fields for items, gross requirements, scheduled receipts, lead time (LT), on-hand inventory from prior periods, net requirements, planned order receipts, and planned order releases for each period. - Items are listed as follows with corresponding MRP fields: - Item **A** - Item **B** - Item **C** - Item **D** - Item **E** - Item **F** **Side Panel: Lead Time and Inventory** - A side table shows the lead times and on-hand inventory for items **A, B, C, D, E,** and **F**. - **Lead Time (Weeks):** Field is provided to fill in lead times for each item. **Bill of Materials (Product Structure) Tree:** - A hierarchical diagram illustrates the product structure for the blue ray players. The tree visually represents: - The top-level product - Subassemblies of B and C - Components D, E, and F with connections showing assembly relationships.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 6 steps with 9 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.