roblem 5. (Cost per Piece in Additive Manufacturing) he cost of the stereolithography machine is $60,000 install ay, 50 weeks per year, and is expected to last 5 years. Mat assume that all of the photopolymer in the container that is ate = $25.00/hr, but labor will be used for only 30% of the rocessing time = 5.0 min/part. Using the cycle time of 3.27 2564 mm³.

Elements Of Electromagnetics
7th Edition
ISBN:9780190698614
Author:Sadiku, Matthew N. O.
Publisher:Sadiku, Matthew N. O.
ChapterMA: Math Assessment
Section: Chapter Questions
Problem 1.1MA
icon
Related questions
Question

please show steps and fomulas so I can understand approach

**Problem 5: Cost per Piece in Additive Manufacturing**

The cost of the stereolithography machine is $60,000 installed. It operates 5 days per week, 8 hours per day, 50 weeks per year, and is expected to last 5 years. Material cost for the photopolymer is $150 per liter. Assume that all of the photopolymer in the container that is not used for the part can be reused. Labor rate is $25.00 per hour, but labor will be used for only 30% of the build cycle, mostly for setup. The post-processing time is 5.0 minutes per part. Using the cycle time of 3.27849 hours, determine the cost for a part of volume 22564 mm³.
Transcribed Image Text:**Problem 5: Cost per Piece in Additive Manufacturing** The cost of the stereolithography machine is $60,000 installed. It operates 5 days per week, 8 hours per day, 50 weeks per year, and is expected to last 5 years. Material cost for the photopolymer is $150 per liter. Assume that all of the photopolymer in the container that is not used for the part can be reused. Labor rate is $25.00 per hour, but labor will be used for only 30% of the build cycle, mostly for setup. The post-processing time is 5.0 minutes per part. Using the cycle time of 3.27849 hours, determine the cost for a part of volume 22564 mm³.
Expert Solution
Step 1

Given data as per question


The cost of installation of stereolithography machine= $60,000 

Machine operates  5 days per week, 8 hours per day, 50 weeks per year, and is expected to last 5 years.

Material cost for the photopolymer = $150/L.

Labor rate = $25.00/hr,

Labour used= 30% of the build cycle

The post-processing time = 5.0 min/part.

the cycle time of 3.27849 hr

volume  of part=22564 mm3. 

steps

Step by step

Solved in 2 steps

Blurred answer
Knowledge Booster
Automation of Manufacturing Processes
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Elements Of Electromagnetics
Elements Of Electromagnetics
Mechanical Engineering
ISBN:
9780190698614
Author:
Sadiku, Matthew N. O.
Publisher:
Oxford University Press
Mechanics of Materials (10th Edition)
Mechanics of Materials (10th Edition)
Mechanical Engineering
ISBN:
9780134319650
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Thermodynamics: An Engineering Approach
Thermodynamics: An Engineering Approach
Mechanical Engineering
ISBN:
9781259822674
Author:
Yunus A. Cengel Dr., Michael A. Boles
Publisher:
McGraw-Hill Education
Control Systems Engineering
Control Systems Engineering
Mechanical Engineering
ISBN:
9781118170519
Author:
Norman S. Nise
Publisher:
WILEY
Mechanics of Materials (MindTap Course List)
Mechanics of Materials (MindTap Course List)
Mechanical Engineering
ISBN:
9781337093347
Author:
Barry J. Goodno, James M. Gere
Publisher:
Cengage Learning
Engineering Mechanics: Statics
Engineering Mechanics: Statics
Mechanical Engineering
ISBN:
9781118807330
Author:
James L. Meriam, L. G. Kraige, J. N. Bolton
Publisher:
WILEY