Question 5 12 Points A producer of pottery is considering the addition of a new plant to absorb the backlog of demand that now exists. The primary location being considered will have the following cost structures as shown in the table. The producer knows there is a big order or order contract that will be awarded by the giant retail WalWal. The producer is not certain as what capacity production is to produce. It all depends on WalWal's contract. The producer has also been informed, the first batch of pottery is required to ship in a very tight time frame from the first production run. The producer decides to plan ahead and select the best production process to set up for manufacturing. Process 1 Ann. Fixed Cost $ 9,835 variable cost $/unit 0.76 Process 2 15,681 0.61 Process 3 6,589 1.15 The producer wants you to help them to identify at what range of production quantity (Q) for Process 1, Process 2, and Process 3 is best to adopt. Enter Q range with whole number and use signs such as <= and >= to describe greater or less than equal to. Ex. 1234 < Q <= 5678 a) The range of annual Q for which Process 1 is best to use is: Blank 1 b) The range of annual volume for which Process 2 is best to use is: Blank 2 c) The range of annual volume for which Process 3 is best to use is: Blank 3

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question
Question 5
12 Points
A producer of pottery is considering the addition of a new plant to absorb the backlog of demand that now exists. The primary location being considered
will have the following cost structures as shown in the table. The producer knows there is a big order or order contract that will be awarded by the giant
retail WalWal. The producer is not certain as what capacity production is to produce. It all depends on WalWal's contract. The producer has also been
informed, the first batch of pottery is required to ship in a very tight time frame from the first production run. The producer decides to plan ahead and
select the best production process to set up for manufacturing.
Process 1
Ann. Fixed Cost $
9,835
variable cost $/unit
0.76
Process 2
15,681
0.61
Process 3
6,589
1.15
The producer wants you to help them to identify at what range of production quantity (Q) for Process 1, Process 2, and Process 3 is best to adopt.
Enter Q range with whole number and use signs such as <= and >= to describe greater or less than equal to. Ex. 1234 < Q <= 5678
a) The range of annual Q for which Process 1 is best to use is: Blank 1
b) The range of annual volume for which Process 2 is best to use is: Blank 2
c) The range of annual volume for which Process 3 is best to use is: Blank 3
Transcribed Image Text:Question 5 12 Points A producer of pottery is considering the addition of a new plant to absorb the backlog of demand that now exists. The primary location being considered will have the following cost structures as shown in the table. The producer knows there is a big order or order contract that will be awarded by the giant retail WalWal. The producer is not certain as what capacity production is to produce. It all depends on WalWal's contract. The producer has also been informed, the first batch of pottery is required to ship in a very tight time frame from the first production run. The producer decides to plan ahead and select the best production process to set up for manufacturing. Process 1 Ann. Fixed Cost $ 9,835 variable cost $/unit 0.76 Process 2 15,681 0.61 Process 3 6,589 1.15 The producer wants you to help them to identify at what range of production quantity (Q) for Process 1, Process 2, and Process 3 is best to adopt. Enter Q range with whole number and use signs such as <= and >= to describe greater or less than equal to. Ex. 1234 < Q <= 5678 a) The range of annual Q for which Process 1 is best to use is: Blank 1 b) The range of annual volume for which Process 2 is best to use is: Blank 2 c) The range of annual volume for which Process 3 is best to use is: Blank 3
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.