Question 2 Scenario 2.5 A job consists of three distinct work elements that were timed with a highly accurate Swiss watch by a trained industrial engineer. The engineer recorded ten observations listed in the following table. All recorded times are in seconds. Element 4 Element 2 Element 3 15 23 45 17 25 51 16 23 52 13 26 49 15 25 46 14 23 43 16 24 51 14 25 50 15 23 49 16 22 49 Use the data in Scenario 2.5 to answer this question. If the rating factor is 15% for all the elements, what is the normal process time for the entire job? O 82.62 seconds O95.02 seconds O 100.63 seconds O 109.27 seconds MacBook Pro

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question
Question 2
Scenario 2.5
A job consists of three distinct work elements that were timed with a highly accurate Swiss watch by a trained industrial engineer.
The engineer recorded ten observations listed in the following table. All recorded times are in seconds.
Element 4 Element 2
Element 3
15
23
45
17
25
51
16
23
52
13
26
49
15
25
46
14
23
43
16
24
51
14
25
50
15
23
49
16
22
49
Use the data in Scenario 2.5 to answer this question. If the rating factor is 15% for all the elements, what is the normal process time
for the entire job?
O 82.62 seconds
O95.02 seconds
O 100.63 seconds
O 109.27 seconds
MacBook Pro
Transcribed Image Text:Question 2 Scenario 2.5 A job consists of three distinct work elements that were timed with a highly accurate Swiss watch by a trained industrial engineer. The engineer recorded ten observations listed in the following table. All recorded times are in seconds. Element 4 Element 2 Element 3 15 23 45 17 25 51 16 23 52 13 26 49 15 25 46 14 23 43 16 24 51 14 25 50 15 23 49 16 22 49 Use the data in Scenario 2.5 to answer this question. If the rating factor is 15% for all the elements, what is the normal process time for the entire job? O 82.62 seconds O95.02 seconds O 100.63 seconds O 109.27 seconds MacBook Pro
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Similar questions
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.