QUESTION 13 L1 Inputs o-S1 0-S2 0-53 0-S4 0-S5 0-S6 0-S7 -S8 o-Se oaS10 8 oo-S11 o-S12 0-S13 10 11 12 13 14 15 20 $1 S8 $10 S11 T4:3/DN S12 S7 Subroutine file 3 -SBR SUBROUTINE S5 12 Ladder logic program Main program file 2 S6 - JSR JUMP-TO-SUBROUTINE SBR file number S13 -TON- TIMER ON DELAY Timer Time base Preset Accumulated PL1 -RET RETURN T4:6 1.0 U:3 20 JMP RTO RETENTIVE TIMER ON Timer (EN) T4:3 Time base (sec) 1.0 (ON) 50 Preset Accumulated PL6 20 JMP PL2 JMP PL4 0 T4:3 RES) PL3 12 JMP PL5 (EN) 5 (ON) 0 Outputs PL1 PL2 Of HOF PL3 PLA PL5 -OF PL6 12 With Reference to the above Ladder Logic Program. Assume all switches are turned off after each operation. Assume all switches are turned on. In what order will the rungs be scanned? O 1,2,3,4,5,6,7,8,9,10 O 1,2,11,12,14,15,3,9,10
Protection System
A system that protects electrical systems from faults by isolating the problematic part from the remainder of the system, preventing power from being cut from healthy elements, improving system dependability and efficiency is the protection system. Protection devices are the equipment that are utilized to implement the protection system.
Predictive Maintenance System
Predictive maintenance technologies are designed to assist in determining the state of in-service equipment so that maintenance can be scheduled. Predictive maintenance is the application of information; proactive maintenance approaches examine the condition of equipment and anticipate when it should maintain. The purpose of predictive maintenance is to forecast when equipment will fail (depending on a variety of parameters), then prevent the failure through routine and corrective maintenance.Condition monitoring is the continual monitoring of machines during process conditions to maintain optimal machine use, which is necessary for predictive maintenance. There are three types of condition monitoring: online, periodic, and remote. Finally, remote condition monitoring allows the equipment observed from a small place and data supplied for analysis.
Preventive Maintenance System
To maintain the equipment and materials on a regular basis in order to maintain those running conditions and reduce unnecessary shutdowns due to unexpected equipment failure is called Preventive Maintenance (PM).
![https://oftc.blackboard.com/webapps/assessment/take/launch.jsp?course_assessment_id=_132181_1&course_id=_11
Question Completion Status:
QUESTION 13
L1
o
oo-S2
-0
Inputs
00-$3
-0
o-S1
o
0-S4
0-55
o-S6
0-57
o o-S8
0-S9
o-S11
0-S12
2
3
oo-S10 8
4
5
6
7
9
15
0-S13 10
11
14
12
13
S1
S2
S3
HH
S4
HE
S9
S8
36
S10
HE
20
LBL
S11
36
T4:3/DN
36
Subroutine file 3
-SBR
S7
SUBROUTINE
S12
36
S5
36
Ladder logic program
Main program file 2
S6
-JSR
JUMP-TO-SUBROUTINE
SBR file number
PL1
()
S13
36
12
LBL TIMER ON DELAY
Timer
Time base
Preset
Accumulated
-RTO
RETENTIVE TIMER ON
T4:3
RET
RETURN
20
JMP
Timer
Time base (sec) 1.0
50
Preset
Accumulated
0
U:3
PL6
20
(JMP)
PL2
T4:6
1.0
20
JMP
PL4
T4:3
(RES)
PL3
12
JMP
EN
ON)
PL5
(EN)
5 (ON)
0
Outputs
PL1-
PL2
PL3-
PL4
PLS
PL6-
L2
of
With Reference to the above Ladder Logic Program.
Assume all switches are turned off after each operation.
Assume all switches are turned on. In what order will the rungs be scanned?
O 1,2,3,4,5,6,7,8,9,10
1,2,11,12,14,15,3,9,10
None of the above](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2F46f72288-0ff6-459a-a0b8-90b49c01bd01%2F34e3d35b-6cab-4daf-8be9-f4a35d5cd7e9%2Ffo4mjpo_processed.jpeg&w=3840&q=75)
![](/static/compass_v2/shared-icons/check-mark.png)
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 1 images
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
![Introductory Circuit Analysis (13th Edition)](https://www.bartleby.com/isbn_cover_images/9780133923605/9780133923605_smallCoverImage.gif)
![Delmar's Standard Textbook Of Electricity](https://www.bartleby.com/isbn_cover_images/9781337900348/9781337900348_smallCoverImage.jpg)
![Programmable Logic Controllers](https://www.bartleby.com/isbn_cover_images/9780073373843/9780073373843_smallCoverImage.gif)
![Introductory Circuit Analysis (13th Edition)](https://www.bartleby.com/isbn_cover_images/9780133923605/9780133923605_smallCoverImage.gif)
![Delmar's Standard Textbook Of Electricity](https://www.bartleby.com/isbn_cover_images/9781337900348/9781337900348_smallCoverImage.jpg)
![Programmable Logic Controllers](https://www.bartleby.com/isbn_cover_images/9780073373843/9780073373843_smallCoverImage.gif)
![Fundamentals of Electric Circuits](https://www.bartleby.com/isbn_cover_images/9780078028229/9780078028229_smallCoverImage.gif)
![Electric Circuits. (11th Edition)](https://www.bartleby.com/isbn_cover_images/9780134746968/9780134746968_smallCoverImage.gif)
![Engineering Electromagnetics](https://www.bartleby.com/isbn_cover_images/9780078028151/9780078028151_smallCoverImage.gif)