Q3/A- Choose the correct answer 1. Subsurface exploration is necessary for (a) selecting the type and depth of foundation for a given structure. (b) evaluating the load-bearing capacity of the foundation. (c) estimating the probable settlement of the foundation. (d) all of the above. 2. The approximate spacing of boreholes for highway projects is (a) 10 – 30 m. (b) 20 – 60 m. (c) 40 – 80 m. (d) 250 – 500 m. 3. Which of the following is the simplest method of making exploratory boreholes? (a) Auger boring (b) Wash boring (c) Percussion drilling (d) Rotary drilling

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
Q3/A- Choose the correct answer
1. Subsurface exploration is necessary for
(a) selecting the type and depth of foundation for a given structure.
(b) evaluating the load-bearing capacity of the foundation.
(c) estimating the probable settlement of the foundation.
(d) all of the above.
2. The approximate spacing of boreholes for highway projects is
(a) 10 – 30 m. (b) 20 – 60 m. (c) 40 – 80 m. (d) 250 – 500 m.
3. Which of the following is the simplest method of making exploratory boreholes?
(a) Auger boring (b) Wash boring (c) Percussion drilling (d) Rotary drilling
4. Disturbed soil samples cannot be used for
(a) grain-size analysis. (b) specific gravity of soil solids. (c) classification.
(d) hydraulic conductivity.
5. The soil sample collected by a sampler is generally considered to be undisturbed when the
area ratio is
(a) less than 10%. (b) equal to or less than 10%. (c) greater than 10%.
(d) e9ual to or greater tham loo %.
Transcribed Image Text:Q3/A- Choose the correct answer 1. Subsurface exploration is necessary for (a) selecting the type and depth of foundation for a given structure. (b) evaluating the load-bearing capacity of the foundation. (c) estimating the probable settlement of the foundation. (d) all of the above. 2. The approximate spacing of boreholes for highway projects is (a) 10 – 30 m. (b) 20 – 60 m. (c) 40 – 80 m. (d) 250 – 500 m. 3. Which of the following is the simplest method of making exploratory boreholes? (a) Auger boring (b) Wash boring (c) Percussion drilling (d) Rotary drilling 4. Disturbed soil samples cannot be used for (a) grain-size analysis. (b) specific gravity of soil solids. (c) classification. (d) hydraulic conductivity. 5. The soil sample collected by a sampler is generally considered to be undisturbed when the area ratio is (a) less than 10%. (b) equal to or less than 10%. (c) greater than 10%. (d) e9ual to or greater tham loo %.
6. The split-spoon samples are generally takon at intervals of about
(a) 0.5 m. (b) 1.0 m. (c) 1.5 m. (d) 3.0 n.
7. If the numbers of blows required for the penetration of a split-spoon sampler into the soil
deposit for three 152.4-min consecutive intervals are 8, 12 and 10, the standard
penetration number (N) will be
(а) 18. (b) 20. (с) 22. (d) 30.
8. Which of the following field tests does not require a borehole?
(a) Cone penetration test (CPT) (b) Standard penetration test (SPT)
(c) Pressuremeter test (PM'T) (d) All of the above
9. After completion of the boring in a highly permeable soil deposit, the level of water in the
borehole generally stabilizes in
(a) 1 h. (b) 24 h. (c) 1 wcek. (d) more than one week.
10. The standard penetration number measured in the field is required to be corrected for
(a) hammer efficiency. (b) borehole diameter and rod-length. (c) sampling method.
(d) all of the above.
Transcribed Image Text:6. The split-spoon samples are generally takon at intervals of about (a) 0.5 m. (b) 1.0 m. (c) 1.5 m. (d) 3.0 n. 7. If the numbers of blows required for the penetration of a split-spoon sampler into the soil deposit for three 152.4-min consecutive intervals are 8, 12 and 10, the standard penetration number (N) will be (а) 18. (b) 20. (с) 22. (d) 30. 8. Which of the following field tests does not require a borehole? (a) Cone penetration test (CPT) (b) Standard penetration test (SPT) (c) Pressuremeter test (PM'T) (d) All of the above 9. After completion of the boring in a highly permeable soil deposit, the level of water in the borehole generally stabilizes in (a) 1 h. (b) 24 h. (c) 1 wcek. (d) more than one week. 10. The standard penetration number measured in the field is required to be corrected for (a) hammer efficiency. (b) borehole diameter and rod-length. (c) sampling method. (d) all of the above.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps

Blurred answer
Knowledge Booster
Principles of Seepage
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning