Q2. Two decision rules are given here. Assume they apply to a normally distributed quality characteristic and the sample size is n = 5. (a) Rule 1: The control chart uses the three-sigma control limits. If one or more of the next seven samples yield values of the sample average that fall outside the control limits, conclude that the process is out of control. i) What is the probability that a sample average is outside the 3-sigma control limits? ii) What is the a-error probability for the control chart under Rule 1?

Advanced Engineering Mathematics
10th Edition
ISBN:9780470458365
Author:Erwin Kreyszig
Publisher:Erwin Kreyszig
Chapter2: Second-order Linear Odes
Section: Chapter Questions
Problem 1RQ
icon
Related questions
Question
Two decision rules are given here. Assume they apply to a normally distributed quality characteristic and the sample size is n = 5.
Q2. Two decision rules are given here. Assume they apply to a normally distributed quality
characteristic and the sample size is n = 5.
(a) Rule 1: The control chart uses the three-sigma control limits. If one or more of the next seven
samples yield values of the sample average that fall outside the control limits, conclude that the
process is out of control.
i) What is the probability that a sample average is outside the 3-sigma control limits?
ii) What is the a-error probability for the control chart under Rule 1?
(b) Rule 2: If all of the next seven sample averages fall on the same side of the center line, conclude
that the process is out of control.
i) What is the probability of a sample average fall on the upper side of the center line?
ii) What is the a-error probability for the control chart under Rule 2?
Transcribed Image Text:Q2. Two decision rules are given here. Assume they apply to a normally distributed quality characteristic and the sample size is n = 5. (a) Rule 1: The control chart uses the three-sigma control limits. If one or more of the next seven samples yield values of the sample average that fall outside the control limits, conclude that the process is out of control. i) What is the probability that a sample average is outside the 3-sigma control limits? ii) What is the a-error probability for the control chart under Rule 1? (b) Rule 2: If all of the next seven sample averages fall on the same side of the center line, conclude that the process is out of control. i) What is the probability of a sample average fall on the upper side of the center line? ii) What is the a-error probability for the control chart under Rule 2?
Expert Solution
Step 1

Since you have posted multiple questions with multiple sub-parts, we will provide the solution only to the first three sub-parts of the first question as per Q&A guidelines. Please repost the remaining question by specifying the sub-parts that need to be answered.

Given:

The sample size is n=5.

 

trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps

Blurred answer
Similar questions
Recommended textbooks for you
Advanced Engineering Mathematics
Advanced Engineering Mathematics
Advanced Math
ISBN:
9780470458365
Author:
Erwin Kreyszig
Publisher:
Wiley, John & Sons, Incorporated
Numerical Methods for Engineers
Numerical Methods for Engineers
Advanced Math
ISBN:
9780073397924
Author:
Steven C. Chapra Dr., Raymond P. Canale
Publisher:
McGraw-Hill Education
Introductory Mathematics for Engineering Applicat…
Introductory Mathematics for Engineering Applicat…
Advanced Math
ISBN:
9781118141809
Author:
Nathan Klingbeil
Publisher:
WILEY
Mathematics For Machine Technology
Mathematics For Machine Technology
Advanced Math
ISBN:
9781337798310
Author:
Peterson, John.
Publisher:
Cengage Learning,
Basic Technical Mathematics
Basic Technical Mathematics
Advanced Math
ISBN:
9780134437705
Author:
Washington
Publisher:
PEARSON
Topology
Topology
Advanced Math
ISBN:
9780134689517
Author:
Munkres, James R.
Publisher:
Pearson,