Q 2/True or false 1- Casing pipe is used to rotate the bit and circulate the drilling fluid. 2- On one side of the fault line the strata has been displaced only upwards or downwards 3- The person who is in charge of the drilling rig and crew is a mud engineer.

Elements Of Electromagnetics
7th Edition
ISBN:9780190698614
Author:Sadiku, Matthew N. O.
Publisher:Sadiku, Matthew N. O.
ChapterMA: Math Assessment
Section: Chapter Questions
Problem 1.1MA
icon
Related questions
Question
Q 2/ True or false
1- Casing pipe is used to rotate the bit and circulate the drilling fluid.
2- On one side of the fault line the strata has been displaced only upwards or downwards
3- The person who is in charge of the drilling rig and crew is a mud engineer.
4- The cable tool drilling an old method of well drilling used before rotary methods.
5- When the bit is needed to rotate exclusively, downhole motor is used.
6- When the valve allows flow to pass in a definite direction is called check valve.
7- Elevator is equipment used to raise or lower pipe into the wellbore.
8- When the drilling mud to a scape to the formation due to fractures or highly permeable beds, a lost
circulation has happened.
9- During the offshore drilling the drilling rig is mounted on a floating vessel.
10- Kick is an entry of formation fluids (oil, gas or water) into the wellbore caused when the formation
pressure less than the pressure exerted by the mud column.
Transcribed Image Text:Q 2/ True or false 1- Casing pipe is used to rotate the bit and circulate the drilling fluid. 2- On one side of the fault line the strata has been displaced only upwards or downwards 3- The person who is in charge of the drilling rig and crew is a mud engineer. 4- The cable tool drilling an old method of well drilling used before rotary methods. 5- When the bit is needed to rotate exclusively, downhole motor is used. 6- When the valve allows flow to pass in a definite direction is called check valve. 7- Elevator is equipment used to raise or lower pipe into the wellbore. 8- When the drilling mud to a scape to the formation due to fractures or highly permeable beds, a lost circulation has happened. 9- During the offshore drilling the drilling rig is mounted on a floating vessel. 10- Kick is an entry of formation fluids (oil, gas or water) into the wellbore caused when the formation pressure less than the pressure exerted by the mud column.
Expert Solution
steps

Step by step

Solved in 3 steps with 2 images

Blurred answer
Knowledge Booster
Clutches, Brakes, Couplings and Flywheels
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Elements Of Electromagnetics
Elements Of Electromagnetics
Mechanical Engineering
ISBN:
9780190698614
Author:
Sadiku, Matthew N. O.
Publisher:
Oxford University Press
Mechanics of Materials (10th Edition)
Mechanics of Materials (10th Edition)
Mechanical Engineering
ISBN:
9780134319650
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Thermodynamics: An Engineering Approach
Thermodynamics: An Engineering Approach
Mechanical Engineering
ISBN:
9781259822674
Author:
Yunus A. Cengel Dr., Michael A. Boles
Publisher:
McGraw-Hill Education
Control Systems Engineering
Control Systems Engineering
Mechanical Engineering
ISBN:
9781118170519
Author:
Norman S. Nise
Publisher:
WILEY
Mechanics of Materials (MindTap Course List)
Mechanics of Materials (MindTap Course List)
Mechanical Engineering
ISBN:
9781337093347
Author:
Barry J. Goodno, James M. Gere
Publisher:
Cengage Learning
Engineering Mechanics: Statics
Engineering Mechanics: Statics
Mechanical Engineering
ISBN:
9781118807330
Author:
James L. Meriam, L. G. Kraige, J. N. Bolton
Publisher:
WILEY