Materials Handiing Machine Setup Insertion of Parts Total Overhead costs Allocation base $ 45,000 Number of parts $ 540,000 Number of parts $ 136,000 $ 721,000 Number of setups Expecced usage: 32 parts per calculator 58 parts per calculator Basic Model 24 setups per year 32 parts per calculator Professional Model 58 parts per calculator 44 setups per year
Process Costing
Process costing is a sort of operation costing which is employed to determine the value of a product at each process or stage of producing process, applicable where goods produced from a series of continuous operations or procedure.
Job Costing
Job costing is adhesive costs of each and every job involved in the production processes. It is an accounting measure. It is a method which determines the cost of specific jobs, which are performed according to the consumer’s specifications. Job costing is possible only in businesses where the production is done as per the customer’s requirement. For example, some customers order to manufacture furniture as per their needs.
ABC Costing
Cost Accounting is a form of managerial accounting that helps the company in assessing the total variable cost so as to compute the cost of production. Cost accounting is generally used by the management so as to ensure better decision-making. In comparison to financial accounting, cost accounting has to follow a set standard ad can be used flexibly by the management as per their needs. The types of Cost Accounting include – Lean Accounting, Standard Costing, Marginal Costing and Activity Based Costing.
Computing and using activity-based costing
Koehler (see Exercise E19-15 and Exercise E19-16) makes handheld calculators in two models—basic and professional—and wants to further refine its costing system by allocating overhead using activity-based costing. The estimated $721,000 of manufacturing overhead has been divided into three primary activities: Materials Handling, Machine Setup, and Insertion of Parts. The following data have been compiled:
Requirement 1
Koehler expects to produce 200,000 basic models and 200,000 professional models. Compute the predetermined overhead allocation rates using activity-based costing. How much overhead is allocated to the basic model? To the professional model?
Requirement 2
Compare your answers for Exercise E19-15, Exercise E19-16, and Exercise E19-17. What conclusions can you draw?